ML20073B492: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:-[ :
{{#Wiki_filter:-[ :
                        ~^
C!mm:nwealth Edistn
C!mm:nwealth Edistn
                                    ! 1400 Opus Place k                D ownsts Grove, Illinois 60515 d                                                      December 4, 1990
! 1400 Opus Place
              'h                                                                                                                       1 Dr. Thomas E; Hurley, Director Office of: Nuclear Reactor-Regulation U.S. Nuclear Regulatory Commission Hashington, D.C. 20555                                                                                           l q
~^
Attn: Document Control Desk
kd ownsts Grove, Illinois 60515 December 4, 1990 D
'h Dr. Thomas E; Hurley, Director Office of: Nuclear Reactor-Regulation U.S. Nuclear Regulatory Commission Hashington, D.C. 20555 Attn: Document Control Desk q


==Subject:==
==Subject:==
Byron Station Units 1 and 2 Inservice Inspection Plan for Pressure Testing at Byron Station NRC Dochet Nos. 50-454 and 5 M ES_
Byron Station Units 1 and 2 Inservice Inspection Plan for Pressure Testing at Byron Station NRC Dochet Nos. 50-454 and 5 M ES Dr. Hurley:
Dr. Hurley:
; Enclosed is the Inservice Inspection (ISI) Program Plan for Pr' essure Testing which has been included as Section 7 of the " Byron s
                                    ; Enclosed is the Inservice Inspection (ISI) Program Plan for                                   s Pr' essure Testing which has been included as Section 7 of the " Byron Nuclear Power Station, Unit 1 and Unit 2, Inservice Inspection and Testing Program Irst Interval". This ISI Pressure Testing Plan provides documentation of the scope and bounduies of visual examinations for leakage.of ASME Class 1, 2 and 3 components and systems at either                                           n nominal operating pressure or hydrostatic pressure. The Plan was
Nuclear Power Station, Unit 1 and Unit 2, Inservice Inspection and Testing Program Irst Interval".
                      -developed in'accordance with the ISI requirements of ASME Section XI,
This ISI Pressure Testing Plan provides documentation of the scope and bounduies of visual examinations for leakage.of ASME Class 1, 2 and 3 components and systems at either The Plan was n
: Subsections IHA, IHB, IHC and IND,-the 1983 Edition through and including the Summer 1983 Addenda.                     Although Relief Requests were unnecessary for'this portion of the plan, Section 7.0 is provided in
nominal operating pressure or hydrostatic pressure.
-developed in'accordance with the ISI requirements of ASME Section XI,
: Subsections IHA, IHB, IHC and IND,-the 1983 Edition through and including the Summer 1983 Addenda.
Although Relief Requests were unnecessary for'this portion of the plan, Section 7.0 is provided in


==Enclosure:==
==Enclosure:==
2_for your review. A revised Table of Contents for the Byron Inservice Inspection and Testing Program including Section 7.0, is
2_for your review. A revised Table of Contents for the Byron Inservice Inspection and Testing Program including Section 7.0, is
:provided in-Enclosure l'.                                                                                    .
:provided in-Enclosure l'.
This'section of the Byron ~ISI Program Plan also contains an
This'section of the Byron ~ISI Program Plan also contains an
                      -augmented-Inservice inspection program to meet the requirements of NUREG
-augmented-Inservice inspection program to meet the requirements of NUREG
                      '0737 III.D.I l. This leakage testing program is required by Section 6.8.4 of the, Byron Technical-Specifications and is designed to reduce                                     {
'0737 III.D.I l.
This leakage testing program is required by Section 6.8.4 of the, Byron Technical-Specifications and is designed to reduce
{
leakage from portions of systems outside containment, that could contain highly 1 radioactive fluids during._a serious transient or accident, to as low as practical-levels.
leakage from portions of systems outside containment, that could contain highly 1 radioactive fluids during._a serious transient or accident, to as low as practical-levels.
  --                                    'Please-direct any questions you may have concerning this matter to this office.
'Please-direct any questions you may have concerning this matter to this office.
Respectfully,
Respectfully,
                                                                                                                .a
.a
* ffiW6f f/ s -0$Nd[U' Terence K. Schuster                       t''
* ffiW6f f/ s -0$Nd[U' Terence K. Schuster t''
Huclear Licensing Administrator
Huclear Licensing Administrator hj 7 dstil N OO f I
                                                                                                                          '* hj Enclosures 7 dstil N OO f                                         gg\
Enclosures gg\\
I p1 t g I
p1 t g I
cc: Resident Inspector-Byron w/o enclosures                                   {Ng           ,%  "
cc:
                                -TMMe ' - - NRR                                                             '
Resident Inspector-Byron w/o enclosures
              - -:O % 3 (ISgional Administrator - RIII w/o enclosures                                     '
{Ng
9104240228 901204 DR   ADOCK 05000454 PDR
-TMMe ' - - NRR
    . ..                  - .    - -                . . . _ . . . ~   _ . . . =         _ . - .              ..}}
- -:O % 3 (ISgional Administrator - RIII w/o enclosures 9104240228 901204 DR ADOCK 05000454 PDR
... ~
... =
-}}

Latest revision as of 04:04, 15 December 2024

Forwards Inservice Insp Program Plan for Pressure Testing. Plan Provides Documentation of Scope & Boundaries of Visual Exams for Leakage of ASME Class 1,2 & 3 Components & Sys
ML20073B492
Person / Time
Site: Byron  Constellation icon.png
Issue date: 12/04/1990
From: Schuster T
COMMONWEALTH EDISON CO.
To: Murley T
Office of Nuclear Reactor Regulation
Shared Package
ML20073B499 List:
References
NUDOCS 9104240228
Download: ML20073B492 (2)


Text

-[ :

C!mm:nwealth Edistn

! 1400 Opus Place

~^

kd ownsts Grove, Illinois 60515 December 4, 1990 D

'h Dr. Thomas E; Hurley, Director Office of: Nuclear Reactor-Regulation U.S. Nuclear Regulatory Commission Hashington, D.C. 20555 Attn: Document Control Desk q

Subject:

Byron Station Units 1 and 2 Inservice Inspection Plan for Pressure Testing at Byron Station NRC Dochet Nos. 50-454 and 5 M ES Dr. Hurley:

Enclosed is the Inservice Inspection (ISI) Program Plan for Pr' essure Testing which has been included as Section 7 of the " Byron s

Nuclear Power Station, Unit 1 and Unit 2, Inservice Inspection and Testing Program Irst Interval".

This ISI Pressure Testing Plan provides documentation of the scope and bounduies of visual examinations for leakage.of ASME Class 1, 2 and 3 components and systems at either The Plan was n

nominal operating pressure or hydrostatic pressure.

-developed in'accordance with the ISI requirements of ASME Section XI,

Subsections IHA, IHB, IHC and IND,-the 1983 Edition through and including the Summer 1983 Addenda.

Although Relief Requests were unnecessary for'this portion of the plan, Section 7.0 is provided in

Enclosure:

2_for your review. A revised Table of Contents for the Byron Inservice Inspection and Testing Program including Section 7.0, is

provided in-Enclosure l'.

This'section of the Byron ~ISI Program Plan also contains an

-augmented-Inservice inspection program to meet the requirements of NUREG

'0737 III.D.I l.

This leakage testing program is required by Section 6.8.4 of the, Byron Technical-Specifications and is designed to reduce

{

leakage from portions of systems outside containment, that could contain highly 1 radioactive fluids during._a serious transient or accident, to as low as practical-levels.

'Please-direct any questions you may have concerning this matter to this office.

Respectfully,

.a

  • ffiW6f f/ s -0$Nd[U' Terence K. Schuster t

Huclear Licensing Administrator hj 7 dstil N OO f I

Enclosures gg\\

p1 t g I

cc:

Resident Inspector-Byron w/o enclosures

{Ng

-TMMe ' - - NRR

- -:O % 3 (ISgional Administrator - RIII w/o enclosures 9104240228 901204 DR ADOCK 05000454 PDR

... ~

... =

-