ML20076E744: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:TEXAS UTILITIES GENERATING COMIRNY | {{#Wiki_filter:TEXAS UTILITIES GENERATING COMIRNY 2001 HRYAN TOWER = DALLAM TEXA8 75201 | ||
(% T;= hy m !O$C$?'. | |||
%n n w.,= | |||
'a% a b d ?> | |||
GJ | |||
"" "J.'"J"" | |||
May 26, 1983 Docket Nos.: 50 45 i | |||
Nr. Harold Denton, Director Office of Nuclear Reactor Regulations U. S. Nuc1 car Regulatory Commission Washington, DC 20555 Attention: Documental Control Desk | |||
==Dear Mr. Denton:== | ==Dear Mr. Denton:== | ||
In accordance with the provisions of 10CFR50.54(p), enclosed are six (6) copics of Revision Four to the Comanche Peak Steam Electric Station (Units 1 and 2) Physical Security Plan, to be effective May 31, 1983. | |||
In accordance with the provisions of 10CFR50.54(p), enclosed are six (6) copics of Revision Four to the Comanche Peak Steam Electric Station (Units 1 | The revision is necessitated by changes in operating procedures and organizational arrangements as a result of the further refinement of the security program at Comanche Peak by Texas Utilities Generating Company. | ||
I Discussion of the major changes is found at Enclosure 1 attached hereto. | |||
The revision is necessitated by changes in operating procedures and organizational arrangements as a result of the further refinement of the | The revised plan is found at Enclosure 2. | ||
security program at Comanche Peak by Texas Utilities Generating Company. | |||
Discussion of the major changes is found at Enclosure 1 attached hereto. | |||
I This revision replaces Revision Three, which is Safeguards Information. Upon approval of Revision Four, Revision Three should be destroyed in accordance with 10CFR Parts 2, 50, 70, and 73, " Protection of Unclassified Safeguards Information, Final Rule," which became effective January 20, 1982. | I This revision replaces Revision Three, which is Safeguards Information. Upon approval of Revision Four, Revision Three should be destroyed in accordance with 10CFR Parts 2, 50, 70, and 73, " Protection of Unclassified Safeguards Information, Final Rule," which became effective January 20, 1982. | ||
j | j This revision in no way decreases safeguards effectiveness at the Comanche l | ||
Peak Steam Electric Station. | |||
Your prompt consideration of our revision to the Physical Security Plan will be appreciated. | Your prompt consideration of our revision to the Physical Security Plan will be appreciated. | ||
l | l Very truly yours, | ||
/ | |||
PDR ADOCK 05000445 F | mw g)0[ | ||
BRC:cp | 8306010279 830526 PDR ADOCK 05000445 F | ||
Enclosures ga S ;?':e' q n 9 q gg | PDR BRC:cp I h i | ||
Enclosures ga S ;?':e' q n 9 q gg a Ah p% | |||
Qjfd[2({.ofljhjfl,h4h,Jb;fkM34 c: Region IV, U. S. Nuc1 car Regulatory Commission h_g | |||
~ | |||
office of Inspection and Enforcement ENCLOSURE CONTAINS SAFEGUARDS | |||
;U f h | |||
'tg f y qd hF INFORMATION, UPON SEPARATION THIS PAGE IS 7 | |||
O bJ Lh5IO'd DECONTROLLED. | |||
Iu d | |||
- -}} | |||
Latest revision as of 02:48, 15 December 2024
| ML20076E744 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 05/26/1983 |
| From: | Clements B TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8306010279 | |
| Download: ML20076E744 (1) | |
Text
TEXAS UTILITIES GENERATING COMIRNY 2001 HRYAN TOWER = DALLAM TEXA8 75201
(% T;= hy m !O$C$?'.
%n n w.,=
'a% a b d ?>
GJ
"" "J.'"J""
May 26, 1983 Docket Nos.: 50 45 i
Nr. Harold Denton, Director Office of Nuclear Reactor Regulations U. S. Nuc1 car Regulatory Commission Washington, DC 20555 Attention: Documental Control Desk
Dear Mr. Denton:
In accordance with the provisions of 10CFR50.54(p), enclosed are six (6) copics of Revision Four to the Comanche Peak Steam Electric Station (Units 1 and 2) Physical Security Plan, to be effective May 31, 1983.
The revision is necessitated by changes in operating procedures and organizational arrangements as a result of the further refinement of the security program at Comanche Peak by Texas Utilities Generating Company.
I Discussion of the major changes is found at Enclosure 1 attached hereto.
The revised plan is found at Enclosure 2.
I This revision replaces Revision Three, which is Safeguards Information. Upon approval of Revision Four, Revision Three should be destroyed in accordance with 10CFR Parts 2, 50, 70, and 73, " Protection of Unclassified Safeguards Information, Final Rule," which became effective January 20, 1982.
j This revision in no way decreases safeguards effectiveness at the Comanche l
Peak Steam Electric Station.
Your prompt consideration of our revision to the Physical Security Plan will be appreciated.
l Very truly yours,
/
mw g)0[
8306010279 830526 PDR ADOCK 05000445 F
PDR BRC:cp I h i
Enclosures ga S ;?':e' q n 9 q gg a Ah p%
Qjfd[2({.ofljhjfl,h4h,Jb;fkM34 c: Region IV, U. S. Nuc1 car Regulatory Commission h_g
~
office of Inspection and Enforcement ENCLOSURE CONTAINS SAFEGUARDS
- U f h
'tg f y qd hF INFORMATION, UPON SEPARATION THIS PAGE IS 7
O bJ Lh5IO'd DECONTROLLED.
Iu d
- -