Line 22: Line 22:
OF OPERATIONS MAY, 1983 During the month of May there were no unit shutdowns. The unit was reduced to thirty-five percent power on May 25, 1983 during resolution of RCS unidentified leakage in excess of 1 gpm.
OF OPERATIONS MAY, 1983 During the month of May there were no unit shutdowns. The unit was reduced to thirty-five percent power on May 25, 1983 during resolution of RCS unidentified leakage in excess of 1 gpm.
In addition to items previously_ reported, the following safety-related maintenance was performed in the month of April.
In addition to items previously_ reported, the following safety-related maintenance was performed in the month of April.
: 1. Performed preventive maintenance (MP-28.114) on reactor trip breakers.
1.
: 2. Reactor trip breaker undervoltage devices were replaced.
Performed preventive maintenance (MP-28.114) on reactor trip breakers.
: 3. Critical dimensions were measured on both new and old under-i         voltage devices.
2.
Reactor trip breaker undervoltage devices were replaced.
3.
Critical dimensions were measured on both new and old under-i voltage devices.
The following safety-related maintenance was performed in the month of
The following safety-related maintenance was performed in the month of
_j 1. Performed safety-related maintenance on diesel generators.
_j 1.
            !  2. Replacement of HFA' relays.
Performed safety-related maintenance on diesel generators.
;              3. Repaired body-bonnet steam leak on TDAFW pump steam admission valve Q1N12HV3234B.
Replacement of HFA' relays.
: 4. Repaired-leak on liquid waste disposal system valve Q1G21V306.
2 3.
: 5. Repacked #5, #7 and #9 river water pumps.
Repaired body-bonnet steam leak on TDAFW pump steam admission valve Q1N12HV3234B.
!-            6. Adjusted packing on seal injection flow throttle valve Q1E21V116C.
4.
Repaired-leak on liquid waste disposal system valve Q1G21V306.
5.
Repacked #5, #7 and #9 river water pumps.
6.
Adjusted packing on seal injection flow throttle valve Q1E21V116C.
l l
l l
l I
l I
8306160327 830602 PDR ADOCK 05000348 R
8306160327 830602 PDR ADOCK 05000348 j
j                          PDR I
R PDR I
i
i


OPERATING DATA REPORT O
OPERATING DATA REPORT OV 50-348 DOC E NO.
V                                                                                        DOC E NO.
DATE 6/02/83 COMPLETED BY W. G. Hairston, III TELEPHONE (205) 899-5156 OPERATING STATUS j
50-348 DATE       6/02/83 COMPLETED BY       W. G. Hairston, III TELEPHONE (205) 899-5156 OPERATING STATUS j
l seph M. Farley - Unit 1 Notes
l seph M. Farley - Unit 1                         Notes                         -
!* Unit Na**:
      !* Unit Na**:                                                           1) Cumulative data since
: 1) Cumulative data since
: 2. Reporting Period: my         toA'                                         12/01/77, date of 2652                               commercial operation.
: 2. Reporting Period: my toA' 12/01/77, date of 2652
: 3. Licensed Thermal Power (MWt):
: 3. Licensed Thermal Power (MWt):
commercial operation.
860
860
: 4. Nameplate Rating (Gross MWe):
: 4. Nameplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):       MO
: 5. Design Electrical Rating (Net MWe):
: 6. Maximum Dependable Capacity (Gross MWe):         844.6
MO 844.6
: 7. Maximum Dependable Capacity (Net MWe):           803.6
: 6. Maximum Dependable Capacity (Gross MWe):
803.6
: 7. Maximum Dependable Capacity (Net MWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
N/A N/A
: 9. Power Level To Which Restricted If Any (Net MWe):       N/A
: 9. Power Level To Which Restricted If Any (Net MWe):
: 10. Reasons For Restrictions,If Any:     M/^
: 10. Reasons For Restrictions,If Any:
This Month           Yr..to.Date         Cur'nulative 744                   3623               48,191
M/^
: 11. Hours in Reporting Period 744                   1860.2             30,007.7
This Month Yr..to.Date Cur'nulative 744 3623 48,191
: 11. Hours in Reporting Period 744 1860.2 30,007.7
: 12. Number Of Hours Reactor Was Critical
: 12. Number Of Hours Reactor Was Critical
: 13. Reactor Reserve Shutdown Hours                         0                   25.1                 3.639.6
: 13. Reactor Reserve Shutdown Hours 0
: 14. Hours Generator On Line                             744                   1787.6             29.055.8 0                 0                     0
25.1 3.639.6
: 15. Unit Reserve Shutdown Hours 1 m 77m                  .4,274,515           72,764,564
: 14. Hours Generator On Line 744 1787.6 29.055.8 0
: 16. Gross Thermal Energy Generated (MWH)
0 0
                                                          ' 621,152               1,355,606           23,129,154
: 15. Unit Reserve Shutdown Hours
: 17. Gross Electrical Energy Generated (MWH) 590,634               1,260,594           21,700,814 i   18. Net Electrical Energy Generated (MWH)
.4,274,515 72,764,564
: 19. Unit Service Factor                                   inn n                 Ao a               An 1
: 16. Gross Thermal Energy Generated (MWH) 1 m 77m
: 20. Unit Availability Factor                             100.0                 49.3               60.3
' 621,152 1,355,606 23,129,154
: 21. Unit Capacity Factor (Using MDC Net)                   98.8                 43.3                56.0 54.3 l   22. Unit Capacity Factor (Using DER Net) 95.8                42.0 0.0                   0.0               17.3 l   23. Unit Forced Outage Rate
: 17. Gross Electrical Energy Generated (MWH) 590,634 1,260,594 21,700,814 i
: 18. Net Electrical Energy Generated (MWH)
: 19. Unit Service Factor inn n Ao a An 1
: 20. Unit Availability Factor 100.0 49.3 60.3 98.8 43.3 56.0
: 21. Unit Capacity Factor (Using MDC Net) 95.8 42.0 54.3 l
: 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 17.3 l
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
n/A
n/A
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:       N/A
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):                       Forecast             Achieved O                                                                                8/06/77             8/09/77 INITIAL CRITICALITY INITIAL ELECTRICITY                                       8/20/77             8/18/77 COMMERCIAL OPERATION                                   12/01/77           12/01/77 W/77)
N/A
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved 8/06/77 8/09/77 O
INITIAL CRITICALITY INITIAL ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 W/77)


                      ~
~
DOCKET NO.         50-348             ;
DOCKET NO.
UNIT         1 DATE 6/02/83 W. G. Hairston, III COMPLET2D SY                              .
50-348 UNIT 1
TT' " HON E May 310NTl!
6/02/83 DATE COMPLET2D SY W. G. Hairston, III TT' " HON E 310NTl!
DAY                       AVERACE DAILY F0WER LEVEL               DAY'   AVERAGE DAILY POWER LEVEL OlWe Net)                                       OtWe-Net) 805                                 g7 803 g                                                 _
May DAY AVERACE DAILY F0WER LEVEL DAY' AVERAGE DAILY POWER LEVEL OlWe Net)
806                                 }g                     798 2
OtWe-Net) 805 803 g
nnn                                19                     794 3                    _
g7 2
808                                                        795 4'                                                             3
806
                  ,3                           812                                 21                     796 R11                                 2                     7Q6 j                 6 807                                                       793 7                                                             23 807                               24
}g 798 3
* 797 3
19 794 nnn 795 4'
808                                23                     57j 9
808 3
802                               26                     nrn 10 799                                n                      804 j!
,3 812 21 796 6
3                      Ro?
R11 2
[2                       _
7Q6 j
re, i 800                                                       799 13                                                             29 798                               30                     797 14 31                     796 IS 16 798 (I M t G ONS On this form:t. list the svenp d:ily unit ;uwer levelin AtWe Net for e:ch d:y in the reporting month. Compute to l               , the ne:re:t whule mepwatt.
793 807 23 7
3 807 24
* 797 808 9
23 57j 802 10 26 nrn 804 j!
799 n
[2 re, i 3
Ro?
800 799 13 29 797 14 798 30 IS 31 796 798 16 (I M t G ONS On this form:t. list the svenp d:ily unit ;uwer levelin AtWe Net for e:ch d:y in the reporting month. Compute to l
, the ne:re:t whule mepwatt.


C                                                             O UNITSiluTDOWNS AND POWER REDUCTIONS                    DOCKET NO.
C O
o=-
o=-
                                                                                                                                  $0-348                 .
$0-348 UNITSiluTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME       t u     ve,-i '-_tinte 1 DATE       6/02/83 COMPl.ETEp itY     W. G. Hairston, III REPORT MONTil       MAy TELEPil0NE (205) 899-5156
UNIT NAME t u ve,-i -_tinte 1 DATE 6/02/83 COMPl.ETEp itY W. G. Hairston, III REPORT MONTil MAy TELEPil0NE (205) 899-5156 "E
                                                    .    "E                             -
E Licensec
c         r.
[v, g*L Cause & Cusiccaive 3 = ='j c
                            ~.       2 _e       8   g3 =E ='j    Licensec      [v,        g*L g                 Cause & Cusiccaive No.         Date     g;     gg         g   ,gg             Eyep       g9         a.g                     gy,gg, ,,
r.
5'0         0 Qb         M fi$         Report #   _
~.
PCvent Recusacnce t5                                                                                       ....
2 _e 8
014         830525     F         0       B         4     83-024/03L'0 CB   VALVEX     Unit was' reduced to 35% during                     a resolution of RCS uni d*entified leakage in excess of 1 GPM.
g g
No.
Date g;
gg g
,gg Eyep g9 a.g gy,gg,,,
5'0 0
Qb M
fi$
Report #
PCvent Recusacnce t5 014 830525 F
0 B
4 83-024/03L'0 CB VALVEX Unit was' reduced to 35% during a
d resolution of RCS uni *entified leakage in excess of 1 GPM.
i l
i l
I
I 2
!  !                    2                                                  3                             4 F: Forced           Reason;         o                                   Method:                         Exhibit G Insieuctions S: Stheduled       A Equipenens Failure (Explain)                       1 -Manual                       for Pacparation of Data ll Maintenance of Test                               2-Manual Scrain.               Entry Sheets for 1.icensee C Hefueling                                         3 Automatic Scram.             Event Report (l ER) File (NUREG.
3 4
D-Ilegulasiny Resisiccion                           4 Othes (Explaio)               0161)
F: Forced Reason; o
E Ope atos Training & license Exandnasion F Administrasive                                                                 5 G Ope ational Esson (Explain)                                                       Exhibit 1 Same Sousee (9/77)                 11 Othes (Explain)
Method:
Exhibit G Insieuctions S: Stheduled A Equipenens Failure (Explain) 1 -Manual for Pacparation of Data ll Maintenance of Test 2-Manual Scrain.
Entry Sheets for 1.icensee C Hefueling 3 Automatic Scram.
Event Report (l ER) File (NUREG.
D-Ilegulasiny Resisiccion 4 Othes (Explaio) 0161)
E Ope atos Training & license Exandnasion F Administrasive 5
i G Ope ational Esson (Explain)
Exhibit 1 Same Sousee (9/77) 11 Othes (Explain) j i


  ;.o
;.o
  ^4 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE  
^4 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE  


==SUMMARY==
==SUMMARY==
OF OPERATIONS MAY, 1983 During the month of May there were no unit shutdowns. The unit was reduced to thirty-five percent power on May 25, 1983 during resolution of RCS unidentified leakage in excess of I gpm.
OF OPERATIONS MAY, 1983 During the month of May there were no unit shutdowns. The unit was reduced to thirty-five percent power on May 25, 1983 during resolution of RCS unidentified leakage in excess of I gpm.
In addition to items previously reported, the following safety-related maintenance was performed in the month of April.
In addition to items previously reported, the following safety-related maintenance was performed in the month of April.
: 1. Performedpreventivemaintenance(MP-28.114)onreactortrip breakers.
1.
                ~2. Reactor trip breaker undervoltage devices were replaced.
Performedpreventivemaintenance(MP-28.114)onreactortrip breakers.
: 3. Critical dimensions were measured on both new and old under-voltage devices.
~2.
Reactor trip breaker undervoltage devices were replaced.
3.
Critical dimensions were measured on both new and old under-voltage devices.
The following safety-related maintenance was performed in the month of May:
The following safety-related maintenance was performed in the month of May:
      ,        1. Performed safety-related maintenance on diesel generators.
1.
: 2. Replacement of HFA relays.
Performed safety-related maintenance on diesel generators.
: 3. Repaired body-bonnet steam leak on TDAFW pump steam admission valve Q1N12HV3234B.
2.
: 4. Repaired leak on liquid waste disposal system valve Q1G21V306.
Replacement of HFA relays.
: 5. Repacked #5, #7 and #9 river water pumps.
3.
: 6. Adjusted packing on seal injection flow throttle valve Q1E21V116C.
Repaired body-bonnet steam leak on TDAFW pump steam admission valve Q1N12HV3234B.
4.
Repaired leak on liquid waste disposal system valve Q1G21V306.
5.
Repacked #5, #7 and #9 river water pumps.
6.
Adjusted packing on seal injection flow throttle valve Q1E21V116C.


!                                                                                                                                                                                                                i i
i i
l
l
\
\\
I                                                                                                                                                                                                               l l s                                                                                                                                                                                                             l CPERATING DATA REPORT                                                                                       ;
I l
i 50-348 DOCKET NO.
l s l
DATE   6/02/83 l                                                                                                                                                           COMPLETED BY               W. G. Hairston, III
CPERATING DATA REPORT i
                                                                                        =
50-348 DOCKET NO.
TELEPHONE (205) 899-5156 OPERATING STATUS                                                                                                                                                           l Joseph M. Farley - Unit 1                                                                       Notes r
DATE 6/02/83 l
I. Unit Name:                                                                                                       1) Cumulative data since
COMPLETED BY W. G. Hairston, III
: 2. Reporting Period: my         toa'                                                                                     12/01/77, date of i
=
2652                                                                           MM                  eMom
TELEPHONE (205) 899-5156 OPERATING STATUS l
Joseph M. Farley - Unit 1 Notes I. Unit Name:
: 1) Cumulative data since r
i
: 2. Reporting Period: my toa' 12/01/77, date of 2652
: 3. Licensed Thermal Power (MWt):
: 3. Licensed Thermal Power (MWt):
860
MM eMom 860
: 4. Nameplate Rating (Gross MWe):
: 4. Nameplate Rating (Gross MWe):
R?O
R?O
: 5. Design Electrical Rating (Net MWe):
: 5. Design Electrical Rating (Net MWe):
: 6. Maximum Dependable Capacity (Gross MWe):                                       844.6
844.6
: 6. Maximum Dependable Capacity (Gross MWe):
803.6
: 7. Maximum Dependable Capacity (Net MWe):
: 7. Maximum Dependable Capacity (Net MWe):
803.6
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
N/A N/A
                                .' . Power Level To Which Restricted,If Any (Net MWe):
.. Power Level To Which Restricted,If Any (Net MWe):
N/A
: 10. Reasons For Restrictions.If Any:
: 10. Reasons For Restrictions.If Any:                 M/^
M/^
This Month                     Yr to-Date                   Cumulative 744                           3623                       48,191
This Month Yr to-Date Cumulative 744 3623 48,191
: 11. Hours In Reporting Period 744                           1860.2                     30,007.7
: 11. Hours In Reporting Period 744 1860.2 30,007.7
: 12. Number Of Hours Reactor Was Critical 0                       2L1                         3.639.6
: 12. Number Of Hours Reactor Was Critical 0
: 13. Reactor Reserve Shutdown Hours 744                           1787.6                     29.055.8
2L1 3.639.6
: 14. Hours Generator On.Line                                                                                                                             0 0                   0
: 13. Reactor Reserve Shutdown Hours 744 1787.6 29.055.8
: 15. Unit Reserve Shutdown Hours                                                                                                                         72,764,564
: 14. Hours Generator On.Line 0
                                                                                                                                                        .4,274,515
0 0
: 16. Gross Thermal Energy Generated (MWH)                                           1' m 3,n 621,152                       1,355,606                   23,129,154
: 15. Unit Reserve Shutdown Hours
: 17. Gross Electrical Energy Generated (MWH)                                                                                                             21,700,814 590,634                       1,260,594
.4,274,515 72,764,564
: 18. Net Electrical Energy Generated (MWH) inn n                         Ao 2                       An 1
: 16. Gross Thermal Energy Generated (MWH) 1' m 3,n 621,152 1,355,606 23,129,154
: 19. Unit Service Factor 100.0                         49.3                       60.3
: 17. Gross Electrical Energy Generated (MWH) 590,634 1,260,594 21,700,814
: 20. Unit Availability Factor 98.8                       43.3                       56.0
: 18. Net Electrical Energy Generated (MWH) inn n Ao 2 An 1
: 21. Unit Capacity Factor (Using MDC Net)                                                                                                                 54.3 95.8                       42.0
: 19. Unit Service Factor 100.0 49.3 60.3
: 22. Unit Capacity Factor (Using DER Net)                                                                                       0.0                       HJ 0.0
: 20. Unit Availability Factor 98.8 43.3 56.0
: 21. Unit Capacity Factor (Using MDC Net) 95.8 42.0 54.3
: 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 HJ
: 23. Unit Forced Outsge Rate
: 23. Unit Forced Outsge Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Esch):
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Esch):
n/A
n/A N/A
: 25. If Shut Down At End Of Report Perio/. Estimated Date of Startup:                                                   N/A
: 25. If Shut Down At End Of Report Perio/. Estimated Date of Startup:
: 26. Units in Test Status t Prior to Commercial Operation):                                                                   Forecast                     Achieved f
: 26. Units in Test Status t Prior to Commercial Operation):
              "                                                                                                                                              06/77                   8/09/77 INITIAL CRITICALITY 8/20/77                   8/18/77 INITIAL ELECTRICITY 12/01/77                   12/01/77 COMMERCIAL OPERATION (o/77 )
Forecast Achieved f
06/77 8/09/77 INITIAL CRITICALITY 8/20/77 8/18/77 INITIAL ELECTRICITY 12/01/77 12/01/77 COMMERCIAL OPERATION (o/77 )


o - - -                     .__.      . . _ . _ . _ _ _ .
o - - -
pocgg7 3g,         50-348 UNIT       1 DATE 6/02/83 W. G. Hairston, III COMPLETED SY (205) 899-5156 TT' " HONE l
50-348 pocgg7 3g, UNIT 1
MONTl!             DY DAY           AVERACE DAILY POWER LEVEL                         DAY       AVERAGE DAILY POWER LEVEL
6/02/83 DATE COMPLETED SY W. G. Hairston, III (205) 899-5156 TT' " HONE l
                                                                                      .    (Mwe.Neg)
DY MONTl!
(AlWe-Net) 805                                                               803              .
DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (AlWe-Net)
g,                                           _                37 806                                         ja                     798 2
(Mwe.Neg) 803 805 g,
RA R                                       19                     794 3         -
37 806 ja 798 2
808                                                                795 4'                                                           20 812                                        21                    796
RA R 19 794 3
        ,3 S11                                         3                     70A 6
795 4'
807                                                               793 7                                                             23 80 7                                       24
808 20 796
* 797 3
,3 812 21 6
808                                          2s,                   q71 9
S11 3
10 802                                         26                     an2 799                                       27                     804 11 ant                                        23                    Rn?
70A 793 807 7
12 800                                                               799
23 3
                                                                          ;3 13 79 8                                         30                   797 14 799                                         33                   796 15 16 798 (WSTRUCTIONS On this form:t. list the aversge daily unit power levelin MWe-Net for esch dsy in the reporting month. Compute o
80 7 24
        , the neare:r whule mepwust.
* 797 808 9
2s, q71 802 26 an2 10 804 11 799 27 Rn?
12 ant 23 799 800 13
;3 797 14 79 8 30 799 15 33 796 798 16 (WSTRUCTIONS On this form:t. list the aversge daily unit power levelin MWe-Net for esch dsy in the reporting month. Compute o
, the neare:r whule mepwust.
(9(/7)
(9(/7)


                                                                                                                                                                                                                                                                                'o i
'o i
DOCKET NO.        $0-348 UNIT SiluTDOWNS AND POWER REDUCTIONS                                                                     '
$0-348 UNIT SiluTDOWNS AND POWER REDUCTIONS DOCKET NO.
!                                                                                                                                                                                                                                        UNIT NAME T M hhv-Wit 1       '
UNIT NAME T M hhv-Wit 1 pryg; 6/02/83
pryg; 6/02/83
, COMPT.ETED ilY W. G. llairston, III REPORT MONTil MAY TELEPilONE (205) 899-5156 "t.
                                                                                                                                                                                                                                    , COMPT.ETED ilY W. G. llairston, III REPORT MONTil           MAY TELEPilONE (205) 899-5156
Y so E h
;                                                                                                                                                                            "t.
c_
c_          rs  Y so E                                     h No.                                        Daic  1p        ' I           !  3 Sb g ''H8            y,?
rs 1
N g3
' I 3 Sb N
                                                                                                                                                                                                                                          '"'""""*''I'*
'"'""""*''I'*
Action iu
No.
,                                                                                                                                                      3j 0-          }   -5 3 Ex:
Daic g ''H8 y,?
y Di y       Reguni #       ,
g3 Action iu p
mo        g                   PMvent Hecursence
3j
:                                                                                                                                                                              6                                                                                                  ~
}
l Unit was' reduced to 35% during
-5 3 Ex:
* j                                                                        014                                                       830525   F           0         B       4       83-024/0311-0         CB   VALVEX i
mo PMvent Hecursence y Di y Reguni #
'                                                                                                                                                                                                                            resolution of RCS uni'entified d            leakage in excess of 1 GPM.
g 0-6
~
l j
014 830525 F
0 B
4 83-024/0311-0 CB VALVEX Unit was' reduced to 35% during i
d resolution of RCS uni'entified leakage in excess of 1 GPM.
i i
i i
j l
j l
l                                                             2                                                       3                                 4 F: Forced                                     Reason:                                                   Meshext:                         Exhibit G - lasieuctions i                                                                                              S: Scheduled                                   A Eiguipment Failure (Explain)                             1-Manual                         for Psepasation of Data j                                                                                                                                             lt-Maintenance of Test                                     2 Manual Scram.                 Entry Sheets for 1.icensee
l 2
;                                                                                                                                              C Refueling                                               3 Automatic Scram.               Event Repius (l.ER) File INUREG-l                                                                                                                                             D-Regulatosy Resisiction                                   4 Other (Explaisi)               0161) i                                                                                                                                               E-Operator Tsaining & Ucense Examination
3 4
{                                                                                                                                               F Administsalive                                                                       5 i                                                                                                                                               G Opesational Essur (limplain)                                                             Exhibit ! - Same Sousee l                                                                           (9/U)                                                             11 Oshcs (!!xplain) l
F: Forced Reason:
                                                                                                                                                                                                                                ~
Meshext:
I
Exhibit G - lasieuctions S: Scheduled A Eiguipment Failure (Explain) 1-Manual for Psepasation of Data i
j lt-Maintenance of Test 2 Manual Scram.
Entry Sheets for 1.icensee C Refueling 3 Automatic Scram.
Event Repius (l.ER) File INUREG-l D-Regulatosy Resisiction 4 Other (Explaisi) 0161) i E-Operator Tsaining & Ucense Examination
{
F Administsalive 5
i G Opesational Essur (limplain)
Exhibit ! - Same Sousee l
(9/U) 11 Oshcs (!!xplain) l I
~


    .Malling Address
.Malling Address Allb1ma Power Company 600 North 18th Stre:t Post Offica Box 2641 Birrn;ngham Alabama 35291 Telephone 205 783-6081 b
  #  Allb1ma Power Company 600 North 18th Stre:t Post Offica Box 2641 Birrn;ngham Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.                                                           b Zlig*7;ld'"'
F. L Clayton, Jr.
                      ,                                          AlabamaPower the southem electrc system June 10, 1983 Docket No. 50-348 Di rector, Of fice of Management Information and Program Control V. S.       Nuclear Regulatory Commission Washington, D.C.         20555
Zlig*7;ld'"'
AlabamaPower the southem electrc system June 10, 1983 Docket No. 50-348 Di rector, Of fice of Management Information and Program Control V. S. Nuclear Regulatory Commission Washington, D.C.
20555


==Dear Sir:==
==Dear Sir:==
 
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the May, 1983 Monthly
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the May,         1983 Monthly
' Operating Report for Joseph M.
      ' Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of the Appendix A Technical Specifications.           As requested by letter from Mr. John F.
Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of the Appendix A Technical Specifications.
Stolz to M r. Alan R. Barton, dated October 21, 1977, a
As requested by letter from Mr. John F.
        " Narrative Summary of Operating Experience" is included in the attached report.
Stolz to M r.
!                If you have any questions, please advise.
Alan R.
Yours very t uly, d'
: Barton, dated October 21,
lff F. L. Clayton, J r.
: 1977, a
" Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very t uly, lff d'
F.
L.
Clayton, J r.
FLCJ r/KWM : na c Enclosures xc: Mr. Ted Cintula (1 copy)
FLCJ r/KWM : na c Enclosures xc: Mr. Ted Cintula (1 copy)
Director, IE (10 copies)
Director, IE (10 copies)
Di rector, RII     (1 copy) d 4G"1, i l
Di rector, RII (1 copy) d G"
                                                              -}}
4 1,
i l
-}}

Latest revision as of 02:38, 15 December 2024

Monthly Operating Rept for May 1983
ML20076G935
Person / Time
Site: Farley 
Issue date: 06/02/1983
From: Clayton F, Hairston W
ALABAMA POWER CO.
To:
References
NUDOCS 8306160327
Download: ML20076G935 (9)


Text

-

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS MAY, 1983 During the month of May there were no unit shutdowns. The unit was reduced to thirty-five percent power on May 25, 1983 during resolution of RCS unidentified leakage in excess of 1 gpm.

In addition to items previously_ reported, the following safety-related maintenance was performed in the month of April.

1.

Performed preventive maintenance (MP-28.114) on reactor trip breakers.

2.

Reactor trip breaker undervoltage devices were replaced.

3.

Critical dimensions were measured on both new and old under-i voltage devices.

The following safety-related maintenance was performed in the month of

_j 1.

Performed safety-related maintenance on diesel generators.

Replacement of HFA' relays.

2 3.

Repaired body-bonnet steam leak on TDAFW pump steam admission valve Q1N12HV3234B.

4.

Repaired-leak on liquid waste disposal system valve Q1G21V306.

5.

Repacked #5, #7 and #9 river water pumps.

6.

Adjusted packing on seal injection flow throttle valve Q1E21V116C.

l l

l I

8306160327 830602 PDR ADOCK 05000348 j

R PDR I

i

OPERATING DATA REPORT OV 50-348 DOC E NO.

DATE 6/02/83 COMPLETED BY W. G. Hairston, III TELEPHONE (205) 899-5156 OPERATING STATUS j

l seph M. Farley - Unit 1 Notes

!* Unit Na**:

1) Cumulative data since
2. Reporting Period: my toA' 12/01/77, date of 2652
3. Licensed Thermal Power (MWt):

commercial operation.

860

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

MO 844.6

6. Maximum Dependable Capacity (Gross MWe):

803.6

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A N/A

9. Power Level To Which Restricted If Any (Net MWe):
10. Reasons For Restrictions,If Any:

M/^

This Month Yr..to.Date Cur'nulative 744 3623 48,191

11. Hours in Reporting Period 744 1860.2 30,007.7
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0

25.1 3.639.6

14. Hours Generator On Line 744 1787.6 29.055.8 0

0 0

15. Unit Reserve Shutdown Hours

.4,274,515 72,764,564

16. Gross Thermal Energy Generated (MWH) 1 m 77m

' 621,152 1,355,606 23,129,154

17. Gross Electrical Energy Generated (MWH) 590,634 1,260,594 21,700,814 i
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor inn n Ao a An 1
20. Unit Availability Factor 100.0 49.3 60.3 98.8 43.3 56.0
21. Unit Capacity Factor (Using MDC Net) 95.8 42.0 54.3 l
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 17.3 l
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

n/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved 8/06/77 8/09/77 O

INITIAL CRITICALITY INITIAL ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 W/77)

~

DOCKET NO.

50-348 UNIT 1

6/02/83 DATE COMPLET2D SY W. G. Hairston, III TT' " HON E 310NTl!

May DAY AVERACE DAILY F0WER LEVEL DAY' AVERAGE DAILY POWER LEVEL OlWe Net)

OtWe-Net) 805 803 g

g7 2

806

}g 798 3

19 794 nnn 795 4'

808 3

,3 812 21 796 6

R11 2

7Q6 j

793 807 23 7

3 807 24

  • 797 808 9

23 57j 802 10 26 nrn 804 j!

799 n

[2 re, i 3

Ro?

800 799 13 29 797 14 798 30 IS 31 796 798 16 (I M t G ONS On this form:t. list the svenp d:ily unit ;uwer levelin AtWe Net for e:ch d:y in the reporting month. Compute to l

, the ne:re:t whule mepwatt.

C O

o=-

$0-348 UNITSiluTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME t u ve,-i -_tinte 1 DATE 6/02/83 COMPl.ETEp itY W. G. Hairston, III REPORT MONTil MAy TELEPil0NE (205) 899-5156 "E

E Licensec

[v, g*L Cause & Cusiccaive 3 = ='j c

r.

~.

2 _e 8

g g

No.

Date g;

gg g

,gg Eyep g9 a.g gy,gg,,,

5'0 0

Qb M

fi$

Report #

PCvent Recusacnce t5 014 830525 F

0 B

4 83-024/03L'0 CB VALVEX Unit was' reduced to 35% during a

d resolution of RCS uni *entified leakage in excess of 1 GPM.

i l

I 2

3 4

F: Forced Reason; o

Method:

Exhibit G Insieuctions S: Stheduled A Equipenens Failure (Explain) 1 -Manual for Pacparation of Data ll Maintenance of Test 2-Manual Scrain.

Entry Sheets for 1.icensee C Hefueling 3 Automatic Scram.

Event Report (l ER) File (NUREG.

D-Ilegulasiny Resisiccion 4 Othes (Explaio) 0161)

E Ope atos Training & license Exandnasion F Administrasive 5

i G Ope ational Esson (Explain)

Exhibit 1 Same Sousee (9/77) 11 Othes (Explain) j i

.o

^4 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS MAY, 1983 During the month of May there were no unit shutdowns. The unit was reduced to thirty-five percent power on May 25, 1983 during resolution of RCS unidentified leakage in excess of I gpm.

In addition to items previously reported, the following safety-related maintenance was performed in the month of April.

1.

Performedpreventivemaintenance(MP-28.114)onreactortrip breakers.

~2.

Reactor trip breaker undervoltage devices were replaced.

3.

Critical dimensions were measured on both new and old under-voltage devices.

The following safety-related maintenance was performed in the month of May:

1.

Performed safety-related maintenance on diesel generators.

2.

Replacement of HFA relays.

3.

Repaired body-bonnet steam leak on TDAFW pump steam admission valve Q1N12HV3234B.

4.

Repaired leak on liquid waste disposal system valve Q1G21V306.

5.

Repacked #5, #7 and #9 river water pumps.

6.

Adjusted packing on seal injection flow throttle valve Q1E21V116C.

i i

l

\\

I l

l s l

CPERATING DATA REPORT i

50-348 DOCKET NO.

DATE 6/02/83 l

COMPLETED BY W. G. Hairston, III

=

TELEPHONE (205) 899-5156 OPERATING STATUS l

Joseph M. Farley - Unit 1 Notes I. Unit Name:

1) Cumulative data since r

i

2. Reporting Period: my toa' 12/01/77, date of 2652
3. Licensed Thermal Power (MWt):

MM eMom 860

4. Nameplate Rating (Gross MWe):

R?O

5. Design Electrical Rating (Net MWe):

844.6

6. Maximum Dependable Capacity (Gross MWe):

803.6

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A N/A

.. Power Level To Which Restricted,If Any (Net MWe):

10. Reasons For Restrictions.If Any:

M/^

This Month Yr to-Date Cumulative 744 3623 48,191

11. Hours In Reporting Period 744 1860.2 30,007.7
12. Number Of Hours Reactor Was Critical 0

2L1 3.639.6

13. Reactor Reserve Shutdown Hours 744 1787.6 29.055.8
14. Hours Generator On.Line 0

0 0

15. Unit Reserve Shutdown Hours

.4,274,515 72,764,564

16. Gross Thermal Energy Generated (MWH) 1' m 3,n 621,152 1,355,606 23,129,154
17. Gross Electrical Energy Generated (MWH) 590,634 1,260,594 21,700,814
18. Net Electrical Energy Generated (MWH) inn n Ao 2 An 1
19. Unit Service Factor 100.0 49.3 60.3
20. Unit Availability Factor 98.8 43.3 56.0
21. Unit Capacity Factor (Using MDC Net) 95.8 42.0 54.3
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 HJ
23. Unit Forced Outsge Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Esch):

n/A N/A

25. If Shut Down At End Of Report Perio/. Estimated Date of Startup:
26. Units in Test Status t Prior to Commercial Operation):

Forecast Achieved f

06/77 8/09/77 INITIAL CRITICALITY 8/20/77 8/18/77 INITIAL ELECTRICITY 12/01/77 12/01/77 COMMERCIAL OPERATION (o/77 )

o - - -

50-348 pocgg7 3g, UNIT 1

6/02/83 DATE COMPLETED SY W. G. Hairston, III (205) 899-5156 TT' " HONE l

DY MONTl!

DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (AlWe-Net)

(Mwe.Neg) 803 805 g,

37 806 ja 798 2

RA R 19 794 3

795 4'

808 20 796

,3 812 21 6

S11 3

70A 793 807 7

23 3

80 7 24

  • 797 808 9

2s, q71 802 26 an2 10 804 11 799 27 Rn?

12 ant 23 799 800 13

3 797 14 79 8 30 799 15 33 796 798 16 (WSTRUCTIONS On this form
t. list the aversge daily unit power levelin MWe-Net for esch dsy in the reporting month. Compute o

, the neare:r whule mepwust.

(9(/7)

'o i

$0-348 UNIT SiluTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME T M hhv-Wit 1 pryg; 6/02/83

, COMPT.ETED ilY W. G. llairston, III REPORT MONTil MAY TELEPilONE (205) 899-5156 "t.

Y so E h

c_

rs 1

' I 3 Sb N

'"'""""*I'*

No.

Daic g H8 y,?

g3 Action iu p

3j

}

-5 3 Ex:

mo PMvent Hecursence y Di y Reguni #

g 0-6

~

l j

014 830525 F

0 B

4 83-024/0311-0 CB VALVEX Unit was' reduced to 35% during i

d resolution of RCS uni'entified leakage in excess of 1 GPM.

i i

j l

l 2

3 4

F: Forced Reason:

Meshext:

Exhibit G - lasieuctions S: Scheduled A Eiguipment Failure (Explain) 1-Manual for Psepasation of Data i

j lt-Maintenance of Test 2 Manual Scram.

Entry Sheets for 1.icensee C Refueling 3 Automatic Scram.

Event Repius (l.ER) File INUREG-l D-Regulatosy Resisiction 4 Other (Explaisi) 0161) i E-Operator Tsaining & Ucense Examination

{

F Administsalive 5

i G Opesational Essur (limplain)

Exhibit ! - Same Sousee l

(9/U) 11 Oshcs (!!xplain) l I

~

.Malling Address Allb1ma Power Company 600 North 18th Stre:t Post Offica Box 2641 Birrn;ngham Alabama 35291 Telephone 205 783-6081 b

F. L Clayton, Jr.

Zlig*7;ld'"'

AlabamaPower the southem electrc system June 10, 1983 Docket No. 50-348 Di rector, Of fice of Management Information and Program Control V. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the May, 1983 Monthly

' Operating Report for Joseph M.

Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of the Appendix A Technical Specifications.

As requested by letter from Mr. John F.

Stolz to M r.

Alan R.

Barton, dated October 21,
1977, a

" Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very t uly, lff d'

F.

L.

Clayton, J r.

FLCJ r/KWM : na c Enclosures xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Di rector, RII (1 copy) d G"