JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS MAY, 1983 During the month of May there were no unit shutdowns. The unit was reduced to thirty-five percent power on May 25, 1983 during resolution of RCS unidentified leakage in excess of 1 gpm.
In addition to items previously_ reported, the following safety-related maintenance was performed in the month of April.
1.
Performed preventive maintenance (MP-28.114) on reactor trip breakers.
2.
Reactor trip breaker undervoltage devices were replaced.
3.
Critical dimensions were measured on both new and old under-i voltage devices.
The following safety-related maintenance was performed in the month of
_j 1.
Performed safety-related maintenance on diesel generators.
Replacement of HFA' relays.
2 3.
Repaired body-bonnet steam leak on TDAFW pump steam admission valve Q1N12HV3234B.
4.
Repaired-leak on liquid waste disposal system valve Q1G21V306.
5.
Repacked #5, #7 and #9 river water pumps.
6.
Adjusted packing on seal injection flow throttle valve Q1E21V116C.
l l
l I
8306160327 830602 PDR ADOCK 05000348 j
R PDR I
i
OPERATING DATA REPORT OV 50-348 DOC E NO.
DATE 6/02/83 COMPLETED BY W. G. Hairston, III TELEPHONE (205) 899-5156 OPERATING STATUS j
l seph M. Farley - Unit 1 Notes
!* Unit Na**:
- 1) Cumulative data since
- 2. Reporting Period: my toA' 12/01/77, date of 2652
- 3. Licensed Thermal Power (MWt):
commercial operation.
860
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
MO 844.6
- 6. Maximum Dependable Capacity (Gross MWe):
803.6
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A N/A
- 9. Power Level To Which Restricted If Any (Net MWe):
- 10. Reasons For Restrictions,If Any:
M/^
This Month Yr..to.Date Cur'nulative 744 3623 48,191
- 11. Hours in Reporting Period 744 1860.2 30,007.7
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0
25.1 3.639.6
- 14. Hours Generator On Line 744 1787.6 29.055.8 0
0 0
- 15. Unit Reserve Shutdown Hours
.4,274,515 72,764,564
- 16. Gross Thermal Energy Generated (MWH) 1 m 77m
' 621,152 1,355,606 23,129,154
- 17. Gross Electrical Energy Generated (MWH) 590,634 1,260,594 21,700,814 i
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor inn n Ao a An 1
- 20. Unit Availability Factor 100.0 49.3 60.3 98.8 43.3 56.0
- 21. Unit Capacity Factor (Using MDC Net) 95.8 42.0 54.3 l
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 17.3 l
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
n/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved 8/06/77 8/09/77 O
INITIAL CRITICALITY INITIAL ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 W/77)
~
DOCKET NO.
50-348 UNIT 1
6/02/83 DATE COMPLET2D SY W. G. Hairston, III TT' " HON E 310NTl!
May DAY AVERACE DAILY F0WER LEVEL DAY' AVERAGE DAILY POWER LEVEL OlWe Net)
OtWe-Net) 805 803 g
g7 2
806
}g 798 3
19 794 nnn 795 4'
808 3
,3 812 21 796 6
R11 2
7Q6 j
793 807 23 7
3 807 24
- 797 808 9
23 57j 802 10 26 nrn 804 j!
799 n
[2 re, i 3
Ro?
800 799 13 29 797 14 798 30 IS 31 796 798 16 (I M t G ONS On this form:t. list the svenp d:ily unit ;uwer levelin AtWe Net for e:ch d:y in the reporting month. Compute to l
, the ne:re:t whule mepwatt.
C O
o=-
$0-348 UNITSiluTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME t u ve,-i -_tinte 1 DATE 6/02/83 COMPl.ETEp itY W. G. Hairston, III REPORT MONTil MAy TELEPil0NE (205) 899-5156 "E
E Licensec
[v, g*L Cause & Cusiccaive 3 = ='j c
r.
~.
2 _e 8
g g
No.
Date g;
gg g
,gg Eyep g9 a.g gy,gg,,,
5'0 0
Qb M
fi$
Report #
PCvent Recusacnce t5 014 830525 F
0 B
4 83-024/03L'0 CB VALVEX Unit was' reduced to 35% during a
d resolution of RCS uni *entified leakage in excess of 1 GPM.
i l
I 2
3 4
F: Forced Reason; o
Method:
Exhibit G Insieuctions S: Stheduled A Equipenens Failure (Explain) 1 -Manual for Pacparation of Data ll Maintenance of Test 2-Manual Scrain.
Entry Sheets for 1.icensee C Hefueling 3 Automatic Scram.
Event Report (l ER) File (NUREG.
D-Ilegulasiny Resisiccion 4 Othes (Explaio) 0161)
E Ope atos Training & license Exandnasion F Administrasive 5
i G Ope ational Esson (Explain)
Exhibit 1 Same Sousee (9/77) 11 Othes (Explain) j i
- .o
^4 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS MAY, 1983 During the month of May there were no unit shutdowns. The unit was reduced to thirty-five percent power on May 25, 1983 during resolution of RCS unidentified leakage in excess of I gpm.
In addition to items previously reported, the following safety-related maintenance was performed in the month of April.
1.
Performedpreventivemaintenance(MP-28.114)onreactortrip breakers.
~2.
Reactor trip breaker undervoltage devices were replaced.
3.
Critical dimensions were measured on both new and old under-voltage devices.
The following safety-related maintenance was performed in the month of May:
1.
Performed safety-related maintenance on diesel generators.
2.
Replacement of HFA relays.
3.
Repaired body-bonnet steam leak on TDAFW pump steam admission valve Q1N12HV3234B.
4.
Repaired leak on liquid waste disposal system valve Q1G21V306.
5.
Repacked #5, #7 and #9 river water pumps.
6.
Adjusted packing on seal injection flow throttle valve Q1E21V116C.
i i
l
\\
I l
l s l
CPERATING DATA REPORT i
50-348 DOCKET NO.
DATE 6/02/83 l
COMPLETED BY W. G. Hairston, III
=
TELEPHONE (205) 899-5156 OPERATING STATUS l
Joseph M. Farley - Unit 1 Notes I. Unit Name:
- 1) Cumulative data since r
i
- 2. Reporting Period: my toa' 12/01/77, date of 2652
- 3. Licensed Thermal Power (MWt):
MM eMom 860
- 4. Nameplate Rating (Gross MWe):
R?O
- 5. Design Electrical Rating (Net MWe):
844.6
- 6. Maximum Dependable Capacity (Gross MWe):
803.6
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A N/A
.. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
M/^
This Month Yr to-Date Cumulative 744 3623 48,191
- 11. Hours In Reporting Period 744 1860.2 30,007.7
- 12. Number Of Hours Reactor Was Critical 0
2L1 3.639.6
- 13. Reactor Reserve Shutdown Hours 744 1787.6 29.055.8
- 14. Hours Generator On.Line 0
0 0
- 15. Unit Reserve Shutdown Hours
.4,274,515 72,764,564
- 16. Gross Thermal Energy Generated (MWH) 1' m 3,n 621,152 1,355,606 23,129,154
- 17. Gross Electrical Energy Generated (MWH) 590,634 1,260,594 21,700,814
- 18. Net Electrical Energy Generated (MWH) inn n Ao 2 An 1
- 19. Unit Service Factor 100.0 49.3 60.3
- 20. Unit Availability Factor 98.8 43.3 56.0
- 21. Unit Capacity Factor (Using MDC Net) 95.8 42.0 54.3
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 HJ
- 23. Unit Forced Outsge Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Esch):
n/A N/A
- 25. If Shut Down At End Of Report Perio/. Estimated Date of Startup:
- 26. Units in Test Status t Prior to Commercial Operation):
Forecast Achieved f
06/77 8/09/77 INITIAL CRITICALITY 8/20/77 8/18/77 INITIAL ELECTRICITY 12/01/77 12/01/77 COMMERCIAL OPERATION (o/77 )
o - - -
50-348 pocgg7 3g, UNIT 1
6/02/83 DATE COMPLETED SY W. G. Hairston, III (205) 899-5156 TT' " HONE l
DY MONTl!
DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (AlWe-Net)
(Mwe.Neg) 803 805 g,
37 806 ja 798 2
RA R 19 794 3
795 4'
808 20 796
,3 812 21 6
S11 3
70A 793 807 7
23 3
80 7 24
- 797 808 9
2s, q71 802 26 an2 10 804 11 799 27 Rn?
12 ant 23 799 800 13
- 3 797 14 79 8 30 799 15 33 796 798 16 (WSTRUCTIONS On this form
- t. list the aversge daily unit power levelin MWe-Net for esch dsy in the reporting month. Compute o
, the neare:r whule mepwust.
(9(/7)
'o i
$0-348 UNIT SiluTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME T M hhv-Wit 1 pryg; 6/02/83
, COMPT.ETED ilY W. G. llairston, III REPORT MONTil MAY TELEPilONE (205) 899-5156 "t.
Y so E h
c_
rs 1
' I 3 Sb N
'"'""""*I'*
No.
Daic g H8 y,?
g3 Action iu p
3j
}
-5 3 Ex:
mo PMvent Hecursence y Di y Reguni #
g 0-6
~
l j
014 830525 F
0 B
4 83-024/0311-0 CB VALVEX Unit was' reduced to 35% during i
d resolution of RCS uni'entified leakage in excess of 1 GPM.
i i
j l
l 2
3 4
F: Forced Reason:
Meshext:
Exhibit G - lasieuctions S: Scheduled A Eiguipment Failure (Explain) 1-Manual for Psepasation of Data i
j lt-Maintenance of Test 2 Manual Scram.
Entry Sheets for 1.icensee C Refueling 3 Automatic Scram.
Event Repius (l.ER) File INUREG-l D-Regulatosy Resisiction 4 Other (Explaisi) 0161) i E-Operator Tsaining & Ucense Examination
{
F Administsalive 5
i G Opesational Essur (limplain)
Exhibit ! - Same Sousee l
(9/U) 11 Oshcs (!!xplain) l I
~
.Malling Address Allb1ma Power Company 600 North 18th Stre:t Post Offica Box 2641 Birrn;ngham Alabama 35291 Telephone 205 783-6081 b
F. L Clayton, Jr.
Zlig*7;ld'"'
AlabamaPower the southem electrc system June 10, 1983 Docket No. 50-348 Di rector, Of fice of Management Information and Program Control V. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the May, 1983 Monthly
' Operating Report for Joseph M.
Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of the Appendix A Technical Specifications.
As requested by letter from Mr. John F.
Stolz to M r.
Alan R.
- Barton, dated October 21,
- 1977, a
" Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise.