JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS MAY, 1983 During the month of May there were no unit shutdowns. The unit was reduced to thirty-five percent power on May 25, 1983 during resolution of RCS unidentified leakage in excess of 1 gpm.

In addition to items previously_ reported, the following safety-related maintenance was performed in the month of April.

1. Performed preventive maintenance (MP-28.114) on reactor trip breakers.
2. Reactor trip breaker undervoltage devices were replaced.
3. Critical dimensions were measured on both new and old under-i voltage devices.

The following safety-related maintenance was performed in the month of

_j 1. Performed safety-related maintenance on diesel generators.

! 2. Replacement of HFA' relays.

3. Repaired body-bonnet steam leak on TDAFW pump steam admission valve Q1N12HV3234B.
4. Repaired-leak on liquid waste disposal system valve Q1G21V306.
5. Repacked #5, #7 and #9 river water pumps.

!- 6. Adjusted packing on seal injection flow throttle valve Q1E21V116C.

l l

l I

8306160327 830602 PDR ADOCK 05000348 R

j PDR I

i

OPERATING DATA REPORT O

V DOC E NO.

50-348 DATE 6/02/83 COMPLETED BY W. G. Hairston, III TELEPHONE (205) 899-5156 OPERATING STATUS j

l seph M. Farley - Unit 1 Notes -

!* Unit Na**: 1) Cumulative data since

2. Reporting Period: my toA' 12/01/77, date of 2652 commercial operation.
3. Licensed Thermal Power (MWt):

860

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe): MO
6. Maximum Dependable Capacity (Gross MWe): 844.6
7. Maximum Dependable Capacity (Net MWe): 803.6
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted If Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: M/^

This Month Yr..to.Date Cur'nulative 744 3623 48,191

11. Hours in Reporting Period 744 1860.2 30,007.7
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0 25.1 3.639.6
14. Hours Generator On Line 744 1787.6 29.055.8 0 0 0
15. Unit Reserve Shutdown Hours 1 m 77m .4,274,515 72,764,564
16. Gross Thermal Energy Generated (MWH)

' 621,152 1,355,606 23,129,154

17. Gross Electrical Energy Generated (MWH) 590,634 1,260,594 21,700,814 i 18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor inn n Ao a An 1
20. Unit Availability Factor 100.0 49.3 60.3
21. Unit Capacity Factor (Using MDC Net) 98.8 43.3 56.0 54.3 l 22. Unit Capacity Factor (Using DER Net) 95.8 42.0 0.0 0.0 17.3 l 23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

n/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved O 8/06/77 8/09/77 INITIAL CRITICALITY INITIAL ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 W/77)

~

DOCKET NO. 50-348  ;

UNIT 1 DATE 6/02/83 W. G. Hairston, III COMPLET2D SY .

TT' " HON E May 310NTl!

DAY AVERACE DAILY F0WER LEVEL DAY' AVERAGE DAILY POWER LEVEL OlWe Net) OtWe-Net) 805 g7 803 g _

806 }g 798 2

nnn 19 794 3 _

808 795 4' 3

,3 812 21 796 R11 2 7Q6 j 6 807 793 7 23 807 24

  • 797 3

808 23 57j 9

802 26 nrn 10 799 n 804 j!

3 Ro?

[2 _

re, i 800 799 13 29 798 30 797 14 31 796 IS 16 798 (I M t G ONS On this form:t. list the svenp d:ily unit ;uwer levelin AtWe Net for e:ch d:y in the reporting month. Compute to l , the ne:re:t whule mepwatt.

C O UNITSiluTDOWNS AND POWER REDUCTIONS DOCKET NO.

o=-

$0-348 .

UNIT NAME t u ve,-i '-_tinte 1 DATE 6/02/83 COMPl.ETEp itY W. G. Hairston, III REPORT MONTil MAy TELEPil0NE (205) 899-5156

. "E -

c r.

~. 2 _e 8 g3 =E ='j Licensec [v, g*L g Cause & Cusiccaive No. Date g; gg g ,gg Eyep g9 a.g gy,gg, ,,

5'0 0 Qb M fi$ Report # _

PCvent Recusacnce t5 ....

014 830525 F 0 B 4 83-024/03L'0 CB VALVEX Unit was' reduced to 35% during a resolution of RCS uni d*entified leakage in excess of 1 GPM.

i l

I

!  ! 2 3 4 F: Forced Reason; o Method: Exhibit G Insieuctions S: Stheduled A Equipenens Failure (Explain) 1 -Manual for Pacparation of Data ll Maintenance of Test 2-Manual Scrain. Entry Sheets for 1.icensee C Hefueling 3 Automatic Scram. Event Report (l ER) File (NUREG.

D-Ilegulasiny Resisiccion 4 Othes (Explaio) 0161)

E Ope atos Training & license Exandnasion F Administrasive 5 G Ope ational Esson (Explain) Exhibit 1 Same Sousee (9/77) 11 Othes (Explain)

.o

^4 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS MAY, 1983 During the month of May there were no unit shutdowns. The unit was reduced to thirty-five percent power on May 25, 1983 during resolution of RCS unidentified leakage in excess of I gpm.

In addition to items previously reported, the following safety-related maintenance was performed in the month of April.

1. Performedpreventivemaintenance(MP-28.114)onreactortrip breakers.

~2. Reactor trip breaker undervoltage devices were replaced.

3. Critical dimensions were measured on both new and old under-voltage devices.

The following safety-related maintenance was performed in the month of May:

, 1. Performed safety-related maintenance on diesel generators.

2. Replacement of HFA relays.
3. Repaired body-bonnet steam leak on TDAFW pump steam admission valve Q1N12HV3234B.
4. Repaired leak on liquid waste disposal system valve Q1G21V306.
5. Repacked #5, #7 and #9 river water pumps.
6. Adjusted packing on seal injection flow throttle valve Q1E21V116C.

! i i

l

\

I l l s l CPERATING DATA REPORT  ;

i 50-348 DOCKET NO.

DATE 6/02/83 l COMPLETED BY W. G. Hairston, III

=

TELEPHONE (205) 899-5156 OPERATING STATUS l Joseph M. Farley - Unit 1 Notes r

I. Unit Name: 1) Cumulative data since

2. Reporting Period: my toa' 12/01/77, date of i

2652 MM eMom

3. Licensed Thermal Power (MWt):

860

4. Nameplate Rating (Gross MWe):

R?O

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 844.6
7. Maximum Dependable Capacity (Net MWe):

803.6

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

.' . Power Level To Which Restricted,If Any (Net MWe):

N/A

10. Reasons For Restrictions.If Any: M/^

This Month Yr to-Date Cumulative 744 3623 48,191

11. Hours In Reporting Period 744 1860.2 30,007.7
12. Number Of Hours Reactor Was Critical 0 2L1 3.639.6
13. Reactor Reserve Shutdown Hours 744 1787.6 29.055.8
14. Hours Generator On.Line 0 0 0
15. Unit Reserve Shutdown Hours 72,764,564

.4,274,515

16. Gross Thermal Energy Generated (MWH) 1' m 3,n 621,152 1,355,606 23,129,154
17. Gross Electrical Energy Generated (MWH) 21,700,814 590,634 1,260,594
18. Net Electrical Energy Generated (MWH) inn n Ao 2 An 1
19. Unit Service Factor 100.0 49.3 60.3
20. Unit Availability Factor 98.8 43.3 56.0
21. Unit Capacity Factor (Using MDC Net) 54.3 95.8 42.0
22. Unit Capacity Factor (Using DER Net) 0.0 HJ 0.0
23. Unit Forced Outsge Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Esch):

n/A

25. If Shut Down At End Of Report Perio/. Estimated Date of Startup: N/A
26. Units in Test Status t Prior to Commercial Operation): Forecast Achieved f

" 06/77 8/09/77 INITIAL CRITICALITY 8/20/77 8/18/77 INITIAL ELECTRICITY 12/01/77 12/01/77 COMMERCIAL OPERATION (o/77 )

o - - - .__. . . _ . _ . _ _ _ .

pocgg7 3g, 50-348 UNIT 1 DATE 6/02/83 W. G. Hairston, III COMPLETED SY (205) 899-5156 TT' " HONE l

MONTl! DY DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

. (Mwe.Neg)

(AlWe-Net) 805 803 .

g, _ 37 806 ja 798 2

RA R 19 794 3 -

808 795 4' 20 812 21 796

,3 S11 3 70A 6

807 793 7 23 80 7 24

  • 797 3

808 2s, q71 9

10 802 26 an2 799 27 804 11 ant 23 Rn?

12 800 799

3 13 79 8 30 797 14 799 33 796 15 16 798 (WSTRUCTIONS On this form
t. list the aversge daily unit power levelin MWe-Net for esch dsy in the reporting month. Compute o

, the neare:r whule mepwust.

(9(/7)

'o i

DOCKET NO. $0-348 UNIT SiluTDOWNS AND POWER REDUCTIONS '

! UNIT NAME T M hhv-Wit 1 '

pryg; 6/02/83

, COMPT.ETED ilY W. G. llairston, III REPORT MONTil MAY TELEPilONE (205) 899-5156

"t.

c_ rs Y so E h No. Daic 1p ' I  ! 3 Sb g H8 y,?

N g3

'"'""""*I'*

Action iu

, 3j 0- } -5 3 Ex:

y Di y Reguni # ,

mo g PMvent Hecursence

6 ~

l Unit was' reduced to 35% during

  • j 014 830525 F 0 B 4 83-024/0311-0 CB VALVEX i

' resolution of RCS uni'entified d leakage in excess of 1 GPM.

i i

j l

l 2 3 4 F: Forced Reason: Meshext: Exhibit G - lasieuctions i S: Scheduled A Eiguipment Failure (Explain) 1-Manual for Psepasation of Data j lt-Maintenance of Test 2 Manual Scram. Entry Sheets for 1.icensee

C Refueling 3 Automatic Scram. Event Repius (l.ER) File INUREG-l D-Regulatosy Resisiction 4 Other (Explaisi) 0161) i E-Operator Tsaining & Ucense Examination

{ F Administsalive 5 i G Opesational Essur (limplain) Exhibit ! - Same Sousee l (9/U) 11 Oshcs (!!xplain) l

~

I

.Malling Address

  1. Allb1ma Power Company 600 North 18th Stre:t Post Offica Box 2641 Birrn;ngham Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr. b Zlig*7;ld'"'

, AlabamaPower the southem electrc system June 10, 1983 Docket No. 50-348 Di rector, Of fice of Management Information and Program Control V. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the May, 1983 Monthly

' Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of the Appendix A Technical Specifications. As requested by letter from Mr. John F.

Stolz to M r. Alan R. Barton, dated October 21, 1977, a

" Narrative Summary of Operating Experience" is included in the attached report.

! If you have any questions, please advise.

Yours very t uly, d'

lff F. L. Clayton, J r.

FLCJ r/KWM : na c Enclosures xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Di rector, RII (1 copy) d 4G"1, i l

-