ML20076L749: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:. _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ . - . - - . -
{{#Wiki_filter:__ _
2 e_ ,
, = Melung Address e_
          , = Melung Address
2 Alabama Power Company
  +-          Alabama Power Company 800 North 18th Street Post Offic] Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Cisyton, Jr.
+-
              %2's*Tia"s*"'                                                                                     AlabamaPbwer the southern electrC System September 8,1983 Docket No. 348 Docket No. 364 m
800 North 18th Street Post Offic] Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Cisyton, Jr.
U. S. Nuclear Regulatory Commission
%2's*Tia"s*"'
,                Office of Inspection and Enforcement                                                                                     G Region II N
AlabamaPbwer the southern electrC System September 8,1983 Docket No. 348 Docket No. 364 m
101 Marietta Street, N.W.                                                                                                   3 Suite 3100                                                                                                               ::
U. S. Nuclear Regulatory Commission G
Atlanta, Georgia 30303                                                                                                     ..
Office of Inspection and Enforcement Region II N
k
101 Marietta Street, N.W.
3 Suite 3100 Atlanta, Georgia 30303 k


==Dear Sir:==
==Dear Sir:==
Line 32: Line 33:
LER 83-046/03L-0 and Unit 2 Licensee Event Report No. LER 83-033/03L-0 are forwarded with three (3) copies of each in accordance with FNP Technical Specification 6.9.1.13 to provide thirty (30) days written nottfication of the occurrences.
LER 83-046/03L-0 and Unit 2 Licensee Event Report No. LER 83-033/03L-0 are forwarded with three (3) copies of each in accordance with FNP Technical Specification 6.9.1.13 to provide thirty (30) days written nottfication of the occurrences.
If-you have any questions, please advise.
If-you have any questions, please advise.
;                                                                Yours very tri
Yours very tri
: g. L. Clayton, J r.
: g. L. Clayton, J r.
FLCJ r/KWM:nac
FLCJ r/KWM:nac Enclosures xc: Director, IE- (30 copies)
;                Enclosures xc: Director, IE- (30 copies)
Director, MIPC (3 copies)
Director, MIPC (3 copies)
OFlilc1AL COPY 8309190066 830908 PDRADOCK05000g S
OFlilc1AL COPY 8309190066 830908 PDRADOCK05000g
[gy K.
[gy K.
!.}}
S
-}}

Latest revision as of 02:15, 15 December 2024

Forwards LERs 83-046/03L-0 & 83-033/03L-0
ML20076L749
Person / Time
Site: Farley  
Issue date: 09/08/1983
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20076L753 List:
References
NUDOCS 8309190066
Download: ML20076L749 (1)


Text

__ _

, = Melung Address e_

2 Alabama Power Company

+-

800 North 18th Street Post Offic] Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Cisyton, Jr.

%2's*Tia"s*"'

AlabamaPbwer the southern electrC System September 8,1983 Docket No. 348 Docket No. 364 m

U. S. Nuclear Regulatory Commission G

Office of Inspection and Enforcement Region II N

101 Marietta Street, N.W.

3 Suite 3100 Atlanta, Georgia 30303 k

Dear Sir:

N Joseph M. Farley Nuclear Plant Unit 1 Licensee Event Report No.

LER 83-046/03L-0 and Unit 2 Licensee Event Report No. LER 83-033/03L-0 are forwarded with three (3) copies of each in accordance with FNP Technical Specification 6.9.1.13 to provide thirty (30) days written nottfication of the occurrences.

If-you have any questions, please advise.

Yours very tri

g. L. Clayton, J r.

FLCJ r/KWM:nac Enclosures xc: Director, IE- (30 copies)

Director, MIPC (3 copies)

OFlilc1AL COPY 8309190066 830908 PDRADOCK05000g

[gy K.

S

-