ML20078S353: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
Line 1: Line 1:
{{Adams
#REDIRECT [[L-95-004, Forwards Owners Inservice Insp Summary,Reflecting Inservice Insp Activities During Second Outage of First Period of Third 10-yr Interval]]
| number = ML20078S353
| issue date = 02/17/1995
| title = Forwards Owners Inservice Insp Summary,Reflecting Inservice Insp Activities During Second Outage of First Period of Third 10-yr Interval
| author name = Maxfield G
| author affiliation = WISCONSIN ELECTRIC POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000301
| license number =
| contact person =
| document report number = PBL-95-0043, PBL-95-43, NUDOCS 9502240099
| package number = ML20078S354
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 1
}}
 
=Text=
{{#Wiki_filter:_-
r i
Wisconsin                                                                                l l Electnc                                                                                ;
POWER COMPANY I
Point Beoch Nuclear Plant                                                                                l o610 Nuclear Rd., two Rm WI $4241                                                  (414) 755 2321 l
l PBL 95-0043 February 17, 1995 i
Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, D.C. 20555                            ,                                                    !
Gentlemen:
Docket 50-301                                                                                            j FILING OF OWNER;S INSERVICE INSPECTION
 
==SUMMARY==
REPORT                                                    '
POINT DEACH NUCLEAR PLANT, UNIT 2 Attached in the Owner's Inservice Inspection Summary which is submitted in accordance with ASME Section XI, IWA-6230.            Included in this submittal is the Innervice Inspection Summary Report for Form NIS-1 and the Repair / Replacement Summary Report for NIS-2.
This information contained in the report reflects the inservice inspection activities during the second outage of the first period of the third 10-year                            ,
interval, of Wisconsin Electric Power Company's Point Beach Nuclear Plant,                            ;
Unit 2.
Sincerely,                                                                                            ,
m                                                                                    !
G. J,      iaxfield                                                                                    f Plant Manager 1
S rift l
Attachment 9502240099 950217 PDR    ADOCK 05000301 G                      r;q g
                                                                                              %k '1t'T Cl
                                                                                                    \
                                    .4 sakfagaf htvwn Eneas Gpnuw                          +
                                                                                                            -}}

Revision as of 00:08, 15 December 2024