{{#Wiki_filter:.g-     t.
{{#Wiki_filter:t.
TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374ot 400 Chestnut Street Tower II February 25, 1983 Director of Nuclear Reactor Regulation Attention: Ms. E. Adensam, Chief Licensing Branch No. 4 Division of
.g-TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374ot 400 Chestnut Street Tower II February 25, 1983 Director of Nuclear Reactor Regulation Attention:
* icensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Ms. E. Adensam, Chief Licensing Branch No. 4 Division of
* icensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555


==Dear Ms. Adensam:==
==Dear Ms. Adensam:==
 
In the Matter of
In the Matter of                               )           Docket No.                             50-327 Tennessee Valley Authority                     )                                                   50-328
)
Docket No.
50-327 Tennessee Valley Authority
)
50-328


==References:==
==References:==
: 1. D. G. Eisenhut's {{letter dated|date=December 22, 1980|text=letter dated December 22, 1980}} regarding NUREG-0612, Control of lieavy Loads at Nuclear Plants
1.
: 2. D. G. Eisenhut's {{letter dated|date=February 3, 1981|text=letter dated February 3, 1981}} regarding Control of Heavy Loads (Generic Letter 81-07)
D. G. Eisenhut's {{letter dated|date=December 22, 1980|text=letter dated December 22, 1980}} regarding NUREG-0612, Control of lieavy Loads at Nuclear Plants 2.
TVA's response to Section 2.1 of Enclosure 3 to references 1 and 2 was
D. G. Eisenhut's {{letter dated|date=February 3, 1981|text=letter dated February 3, 1981}} regarding Control of Heavy Loads (Generic Letter 81-07)
,                submitted to you for our Sequoyah Nuclear Plant by my {{letter dated|date=March 1, 1982|text=March 1, 1982 letter}}.
TVA's response to Section 2.1 of Enclosure 3 to references 1 and 2 was submitted to you for our Sequoyah Nuclear Plant by my {{letter dated|date=March 1, 1982|text=March 1, 1982 letter}}.
A draft technical evaluation report on the control of heavy loads for our Sequoyah Nuclear Plant was transmitted to TVA by your {{letter dated|date=June 30, 1982|text=June 30, 1982 letter}} to H. G. Parris. A subsequent telephone conversation was held with NRC staff members on December 3, 1982 to discuss TVA comments on the draft technical evaluation report. Enclosed is a supplemental response, which provides additional information and comitments, as requested by the NRC in the December 3, 1982 telephone conversation.
A draft technical evaluation report on the control of heavy loads for our Sequoyah Nuclear Plant was transmitted to TVA by your {{letter dated|date=June 30, 1982|text=June 30, 1982 letter}} to H. G. Parris. A subsequent telephone conversation was held with NRC staff members on December 3, 1982 to discuss TVA comments on the draft technical evaluation report. Enclosed is a supplemental response, which provides additional information and comitments, as requested by the NRC in the December 3, 1982 telephone conversation.
BD30 8303040628 830225 PDR ADOCK 05000327 PDR p
BD30 8303040628 830225 PDR ADOCK 05000327 p
An Equal Opportunity Employer
PDR An Equal Opportunity Employer


i         ,    ..
i l
l l
l U.S. Nuclear Regulatory Comission February 25, 1983 1
U.S. Nuclear Regulatory Comission                                                 February 25, 1983 1
If you have any questions concerning this matter, please get in touch with J. E. Wills at FTS 858-2683 Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Licensj.ng Sworn o d subsc e before me this day of 1983 Notary Public My Comission Expires Enclosure U.S. Nuclear Regulatory Comission (Enclosure) cc:
If you have any questions concerning this matter, please get in touch with J. E. Wills at FTS 858-2683 Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Licensj.ng Sworn o     d subsc   e before me this       day of         .
1 Region II Attn:
1983 Notary Public My Comission Expires                         -
Mr. James P. O'Reilly Administrator 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
Enclosure cc: U.S. Nuclear Regulatory Comission (Enclosure) 1 Region II Attn: Mr. James P. O'Reilly Administrator 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
,-,-,-,,-,-r n---
      -                                    - , - - - , . , , , -        , , . , , , - - . - ,              ,-,-,-,,-,-r - - . , - - - ---,- - n--- --. .- . - - , ---


t l
t ENCLOSURE TVA CONG!NTS ON CONTROL OF HEAVY LOADS (C-10)
ENCLOSURE                                                                         l TVA CONG!NTS ON CONTROL OF HEAVY LOADS (C-10)
TECHNICAL EVALUATION REPORT TER-C5257-449 SEQUOYAH NUCLEAR PLANT NUREG-0612 NRC' TER Guideline Recommendation Page No.
TECHNICAL EVALUATION REPORT TER-C5257-449 SEQUOYAH NUCLEAR PLANT NUREG-0612                                                 NRC'                                         TER Guideline                                         Recommendation                                     Page No.           TVA Response
TVA Response
                                                                                                                                    ~
~
                                                      ^
^
Review systems out of service                                               5       TVA will review these and verify administrative                                                           systems and verify admini- l control of interlocks where                                                         strative controls by                         l applicable.                                                                         September 1, 1983                           l 1.a.                     Determine safe load paths for                                     .        8       TVA will reevaluate the major loads.                                                                       load paths given in SQM-56 and make necessary revisions by September 1,
Review systems out of service 5
                                                                                                                                                      ,          1983 1.b.                     Provide visual aids for crane
TVA will review these and verify administrative systems and verify admini-l control of interlocks where strative controls by applicable.
                                                                                                                                              ~~
September 1, 1983 1.a.
                                                                                                                                                        -8   ~
Determine safe load paths for 8
TVA will reevaluate the major loads.
load paths given in SQM-56 and make necessary revisions by September 1, 1983 1.b.
Provide visual aids for crane
~~
-8
~
SQM-56 will be revised by-
SQM-56 will be revised by-
                                                                      . _ _ .- . . operator. . - - - - ._... - _
. _ _.-.. operator.. - - - -._... - _
September 1, 1983, requir-of this procedure to be performed under the super-vision of a designated person. Prior to any lifts, this designated person will walk the route of'the safe load path
September 1, 1983, requir-of this procedure to be performed under the super-vision of a designated person. Prior to any lifts, this designated person will walk the route of'the safe load path
_ _ _ ._given.in,SQM-56 for...the._...
_ _ _._given.in,SQM-56 for...the._...
benefit of the crane operator and the flagman.
benefit of the crane operator and the flagman.
1.c.                     Require written alternatives                                               8       SQM-56 will be revised by for deviations from load                                                           September 1, 1983, to paths.                                                                             address deviations.
1.c.
2.a.                     Improve handling proceduree                                                 9       TVA will review the maintenance instructions involving " heavy load" lifts and revise, if necessary, to reference SQM-56 by September 1, 1983     Any " heavy load" lift not included in maintenance instructions will be referenced in SQM-56.
Require written alternatives 8
2.b.                     Develop load handling                                                       9       This will be performed by procedures for monorails                                                           implementing the Interim I _ __ _ _ ..___..._._._ _ ._ _ subject to NUREG-0612__                                                                               __
SQM-56 will be revised by for deviations from load September 1, 1983, to paths.
                                                                                                                                                      ._ __ _ _ . Guidelines as listed on__
address deviations.
compliance.                                                                         following page.
2.a.
3                       Crane Operator Training                                                   10       SQN complies with this guideline.
Improve handling proceduree 9
                                        ' ^ -
TVA will review the maintenance instructions involving " heavy load" lifts and revise, if necessary, to reference SQM-56 by September 1, 1983 Any " heavy load" lift not included in maintenance instructions will be referenced in SQM-56.
4 O t .ll% ;
2.b.
          . *
Develop load handling 9
* 2, ,
This will be performed by procedures for monorails implementing the Interim I _ __ _ _..___..._._._ _._ _ subject to NUREG-0612__
                                                                                ,- - ~ -":
._ __ _ _. Guidelines as listed on__
compliance.
following page.
3 Crane Operator Training 10 SQN complies with this guideline.
' ^ -
4 O t.ll% ;
2,,
v
v
  ,4                       u-             , s     a   n,               . .                  . u.p_    ~ . . . .
. u.p_
  ' d ,        .e   [L I         4 ed     e   e i.w a
,- - ~ -":
{kv           -
,4 u-
                                                                                                                                                            .                4    44+.- a*--
, s a
se 4   e
n,
~....
' d
.e
[L I 4 ed e
e i.w a
{kv 4
44+.-
a*-
se 4 e


    . m           u 2-NRC                                         NRC                                                         TER Guide 14.c3                             Recommendation                                                   Page No.                   .TVA Response
. m u
: 4.                 Analysis of special lifting                                                           10                 TVA is negotiating with devices                                                                                                   Westinghouse to have this analysis performed.                     ,
2-NRC NRC TER Guide 14.c3 Recommendation Page No.
TVA will implement inspection requirements in accordance with Section 5               t of ANSI N14.6-1978 by                   ;
.TVA Response 4.
September 1, 1983                       !
Analysis of special lifting 10 TVA is negotiating with devices Westinghouse to have this analysis performed.
5.a.               Select and mark slings on                                                             14                 TVA will evaluate basis of maximum static and                                                                               NUREG-0612 cranes to dynamic loads,                                                                                           verify the dynamic loading             '
TVA will implement inspection requirements in accordance with Section 5 t
is less than 10 percent
of ANSI N14.6-1978 by September 1, 1983 5.a.
                                                                                                                                                                ~ of total static load
Select and mark slings on 14 TVA will evaluate basis of maximum static and NUREG-0612 cranes to dynamic loads, verify the dynamic loading is less than 10 percent
                                                                                                                                                                      -in lieu of rerating - - -
~ of total static load
-in lieu of rerating - - -
all the affected slings.
all the affected slings.
5.b.               Clearly mark slings restricted                                                       14'                 TVA will complete this to use with only certain cranes,                                                                         recommendation by September 1, 1983.'~
5.b.
: 6.                 Crane inspection, testing, and                                                                           SQN complies with this maintenance.                                                                                             guideline.
Clearly mark slings restricted 14' TVA will complete this to use with only certain cranes, recommendation by September 1, 1983.'~
              ~     ~~
6.
7.a.               Evaluate design of reactor                         '~~~
Crane inspection, testing, and SQN complies with this maintenance.
17              _This evaluation is expecte >
guideline.
                                                                                                                                                ~
~
                                                    ~ 'b'uilding polar crane.                                                                                           to be completed by
~ ~
                                                                                              .                                                                          October 1, 1983                         ,
7.a.
7.b.               Determine whether other handling                                                     17                 This evaluation is expecte systems were designed in                                                                                 to be completed by accordance with acceptable                                                                               October 1, 1983                         .
Evaluate design of reactor 17
ANSI standards.
_This evaluation is expecte >
Interim Guidelines                                                                   23                 TVA will impicment interim protection requirements provided in Section 5 3 of NUREG-0612
~ 'b'uilding polar crane.
                                                                                                                                                                      .for the following " heavy                 ;
'~~~
load" handling systems by               :
~
,                                                                                                                                                                        December 1, 1983:
to be completed by October 1, 1983 7.b.
: 1. ERCW hydraulic                   !
Determine whether other handling 17 This evaluation is expecte systems were designed in to be completed by accordance with acceptable October 1, 1983 ANSI standards.
pedestal crane.
Interim Guidelines 23 TVA will impicment interim protection requirements provided in Section 5 3 of NUREG-0612
: 2. Auxiliary building               ,
.for the following " heavy load" handling systems by December 1, 1983:
5-ton electric monorail.
1.
t
ERCW hydraulic pedestal crane.
                                          .                                                                                                                                                                      t i
2.
I n.a.-~~,-                      -
Auxiliary building 5-ton electric monorail.
i u n. . G.- ~r .- -- m             .m.... w~.       m w.   .. .~               --                          -
t t
_ _                    m         -  ,-_w   -              +   ------e     =                 . -- - - -,.          -            --,. - - -                -- + y s-      -- -- e
i I
n.a.-~~,-
i u n.. G.- ~r.- -- m
.m....
w~.
m w.
...~
m
,-_w
+
------e
=
+
y s-e


  . , , .t .
.,,.t.
            - .                ~
~
                                                                                                                                                                                                                                                                                                                                                                                                            \
\\ 1 l
1 l
NRC NRC TER Guideline Recommendation Page No.
NRC                                             NRC                                                                           TER                                                                         I Guideline                             Recommendation                                                                             Page No.                                 TVA Response l
TVA Response 4
4 7.b (cont'd)                                               ,                                                                                            3.             Component cooling water pump monorail.
7.b (cont'd) 3.
: 4.             Reactor building jib crane.
Component cooling water pump monorail.
4.
Reactor building jib crane.
m 5
m 5
i
i
                                                        ~' " ---           -      -            _        ~s   -.,_ .- . ___ _ ._ . _ , _ , . __ _ , _ , _ _ , , , , ,                                        _ , _        __
~' " ---
i i
~s i
1 1
i 1
i l
1 i
4 l
4 l
\
\\
l l
--d A
                  --d A
N he-w-**_
N he-   w-**_   _      48h+                           ..g. , ,           ,_g     _
48h+
4,
..g.,,
                                                                                                                                                            . , - -      -    _ _ _ . . _ _ _ _ . _ _ _ _ _ _ _ _ . _ _        ,-,_-._,m.._.--     ,}}
,_g 4,
,-,_-._,m.._.--
,}}

Latest revision as of 22:55, 14 December 2024

Forwards Supplemental Response to NUREG-0612 & Generic Ltr 81-07 Re Control of Heavy Loads,Consisting of Comments on Technical Evaluation Rept TER-C5257-449
ML20079P480
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/25/1983
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Adensam E
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR GL-81-07, GL-81-7, NUDOCS 8303040628
Download: ML20079P480 (5)


Text

t.

.g-TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374ot 400 Chestnut Street Tower II February 25, 1983 Director of Nuclear Reactor Regulation Attention:

Ms. E. Adensam, Chief Licensing Branch No. 4 Division of

  • icensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Ms. Adensam:

In the Matter of

)

Docket No.

50-327 Tennessee Valley Authority

)

50-328

References:

1.

D. G. Eisenhut's letter dated December 22, 1980 regarding NUREG-0612, Control of lieavy Loads at Nuclear Plants 2.

D. G. Eisenhut's letter dated February 3, 1981 regarding Control of Heavy Loads (Generic Letter 81-07)

TVA's response to Section 2.1 of Enclosure 3 to references 1 and 2 was submitted to you for our Sequoyah Nuclear Plant by my March 1, 1982 letter.

A draft technical evaluation report on the control of heavy loads for our Sequoyah Nuclear Plant was transmitted to TVA by your June 30, 1982 letter to H. G. Parris. A subsequent telephone conversation was held with NRC staff members on December 3, 1982 to discuss TVA comments on the draft technical evaluation report. Enclosed is a supplemental response, which provides additional information and comitments, as requested by the NRC in the December 3, 1982 telephone conversation.

BD30 8303040628 830225 PDR ADOCK 05000327 p

PDR An Equal Opportunity Employer

i l

l U.S. Nuclear Regulatory Comission February 25, 1983 1

If you have any questions concerning this matter, please get in touch with J. E. Wills at FTS 858-2683 Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Licensj.ng Sworn o d subsc e before me this day of 1983 Notary Public My Comission Expires Enclosure U.S. Nuclear Regulatory Comission (Enclosure) cc:

1 Region II Attn:

Mr. James P. O'Reilly Administrator 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

,-,-,-,,-,-r n---

t ENCLOSURE TVA CONG!NTS ON CONTROL OF HEAVY LOADS (C-10)

TECHNICAL EVALUATION REPORT TER-C5257-449 SEQUOYAH NUCLEAR PLANT NUREG-0612 NRC' TER Guideline Recommendation Page No.

TVA Response

~

^

Review systems out of service 5

TVA will review these and verify administrative systems and verify admini-l control of interlocks where strative controls by applicable.

September 1, 1983 1.a.

Determine safe load paths for 8

TVA will reevaluate the major loads.

load paths given in SQM-56 and make necessary revisions by September 1, 1983 1.b.

Provide visual aids for crane

~~

-8

~

SQM-56 will be revised by-

. _ _.-.. operator.. - - - -._... - _

September 1, 1983, requir-of this procedure to be performed under the super-vision of a designated person. Prior to any lifts, this designated person will walk the route of'the safe load path

_ _ _._given.in,SQM-56 for...the._...

benefit of the crane operator and the flagman.

1.c.

Require written alternatives 8

SQM-56 will be revised by for deviations from load September 1, 1983, to paths.

address deviations.

2.a.

Improve handling proceduree 9

TVA will review the maintenance instructions involving " heavy load" lifts and revise, if necessary, to reference SQM-56 by September 1, 1983 Any " heavy load" lift not included in maintenance instructions will be referenced in SQM-56.

2.b.

Develop load handling 9

This will be performed by procedures for monorails implementing the Interim I _ __ _ _..___..._._._ _._ _ subject to NUREG-0612__

._ __ _ _. Guidelines as listed on__

compliance.

following page.

3 Crane Operator Training 10 SQN complies with this guideline.

' ^ -

4 O t.ll% ;

2,,

v

. u.p_

,- - ~ -":

,4 u-

, s a

n,

~....

' d

.e

[L I 4 ed e

e i.w a

{kv 4

44+.-

a*-

se 4 e

. m u

2-NRC NRC TER Guide 14.c3 Recommendation Page No.

.TVA Response 4.

Analysis of special lifting 10 TVA is negotiating with devices Westinghouse to have this analysis performed.

TVA will implement inspection requirements in accordance with Section 5 t

of ANSI N14.6-1978 by September 1, 1983 5.a.

Select and mark slings on 14 TVA will evaluate basis of maximum static and NUREG-0612 cranes to dynamic loads, verify the dynamic loading is less than 10 percent

~ of total static load

-in lieu of rerating - - -

all the affected slings.

5.b.

Clearly mark slings restricted 14' TVA will complete this to use with only certain cranes, recommendation by September 1, 1983.'~

6.

Crane inspection, testing, and SQN complies with this maintenance.

guideline.

~

~ ~

7.a.

Evaluate design of reactor 17

_This evaluation is expecte >

~ 'b'uilding polar crane.

'~~~

~

to be completed by October 1, 1983 7.b.

Determine whether other handling 17 This evaluation is expecte systems were designed in to be completed by accordance with acceptable October 1, 1983 ANSI standards.

Interim Guidelines 23 TVA will impicment interim protection requirements provided in Section 5 3 of NUREG-0612

.for the following " heavy load" handling systems by December 1, 1983:

1.

ERCW hydraulic pedestal crane.

2.

Auxiliary building 5-ton electric monorail.

t t

i I

n.a.-~~,-

i u n.. G.- ~r.- -- m

.m....

w~.

m w.

...~

m

,-_w

+


e

=

+

y s-e

.,,.t.

~

\\ 1 l

NRC NRC TER Guideline Recommendation Page No.

TVA Response 4

7.b (cont'd) 3.

Component cooling water pump monorail.

4.

Reactor building jib crane.

m 5

i

~' " ---

~s i

i 1

1 i

4 l

\\

--d A

N he-w-**_

48h+

..g.,,

,_g 4,