{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _ _ _ _
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _ _ _ _
I l
I l
UNITED STATES OF AMERICA                                                             -
UNITED STATES OF AMERICA l
l                                    NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC' SAFETY AND LICENSING BOARD t
NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC' SAFETY AND LICENSING BOARD t
In the Matter of APPLICATION OF TEXAS UTILITIES                                                       I l           GENERATING COMPANY, ET AL. FOR                                                       I                                  Docket Nos. 50-445 l                                                                                                  I                                          and 50-446 AN OPERATING LICENSE FOR COMANCHE PEAK STEAM ELECTRIC                                                         I STATION UNITS #1 AND #2                                                               I (CPSES)
In the Matter of APPLICATION OF TEXAS UTILITIES I
TESTIMONY OF CASE WITNESS f                                                                                           JACK D0YLE i
I Docket Nos. 50-445 l
1 Q:   Mr. Doyle, have you read the CYGNA Report?
GENERATING COMPANY, ET AL. FOR and 50-446 l
2     A:   Yes, I have.
AN OPERATING LICENSE FOR I
3           What is your opinion of this document?
COMANCHE PEAK STEAM ELECTRIC I
Q:
STATION UNITS #1 AND #2 I
4       A:   I have several objections to this document:
(CPSES)
5 (1)   It represents one of the simpler areas in' the plant containing 6
TESTIMONY OF CASE WITNESS f
pipes and pipe supports, which is all that I am addressing 7                 in this testimony; 8           (2)   It is not an independent assessment of the systems being 9                 reviewed; 10           (3) The section devoted to the pipe support criteria lacks a                                                                           -
JACK D0YLE i
11                 number of criteria which are critical to any assesscent of 12                 supports; i
1 Q:
13           (4) The document lacks the information required for a proper 14 assessment of its; accuracy; 15           (5) The bare minimum of information contained in this document 16                 is still sufficient to lead an independent reviewer to come
Mr. Doyle, have you read the CYGNA Report?
2 A:
Yes, I have.
3 Q:
What is your opinion of this document?
4 A:
I have several objections to this document:
5 (1)
It represents one of the simpler areas in' the plant containing 6
pipes and pipe supports, which is all that I am addressing 7
in this testimony; 8
(2)
It is not an independent assessment of the systems being 9
reviewed; 10 (3) The section devoted to the pipe support criteria lacks a 11 number of criteria which are critical to any assesscent of 12 supports; 13 (4) The document lacks the information required for a proper i
14 assessment of its; accuracy; 15 (5) The bare minimum of information contained in this document 16 is still sufficient to lead an independent reviewer to come
(
(
                                                                                                                                                              'l 8402100072 840207                                                               '
8402100072 840207
{DRADOCM 05000445                                               PDR
' l
_        _ _ _ _ _ _ _ _ _ _ - - - - - - - - - - - - - _ _                  _                            _    _          _ _  __J
{DRADOCM 05000445 PDR
__J


1                         to conclusions which are not reflected by this doctanent.
. 1 to conclusions which are not reflected by this doctanent.
2                         In fact, the conclusions by CYGNA are the opposite of those 3                       which should have been assessed.
2 In fact, the conclusions by CYGNA are the opposite of those 3
4             Q:   Taking these itans in order, what do you mean by "one of the simpler 5         areas"?
which should have been assessed.
6             A:   To start with, the basic area is not cluttered as is the case 7       at, say, azimuth 270 on elevation 808. Beyond that, the individual supports 8       are basically one=way supports as opposed to the more complex frames used 9       as one , two , three , and even six-way restraints. There is practically 10       no friction conisderation for these supports. This may be noted from the 11       fact that of the 91 supports covered in the walk-down section of the report, 12       more than half are springs or snubbers. Of the remaining 43 or so, many are 13       struts. Therefore, this sample covers a far simpler segment than is the 14       norm for the plant. Beyond this, there were, to the best of my knowledge, 15       no A307 bolt problems, no instability problems, no local diaphram problems, 16       no cinched-up U-bolt problems, etc., present because of the nature of the 17       supports. Also, this area was a showcase area used to prove that the iterative 18       process was without problem.
4 Q:
19             Q:   You say this is not an independent review. How do you arrive at 20       this conclusion?
Taking these itans in order, what do you mean by "one of the simpler 5
21             A:   Many factors lead to this conclusion. One example may be found in 22       . note No.1, attachment to PS-01, Appendix H, Pipe Support Check List. The 23       note effectively concurs with the vendors,the utility and Region IV NRC that 24       the stress contribution caused by the effects of seismic . events on the structure 25       comprising the support is negligible. I don't recall anyone on either. side
areas"?
6 A:
To start with, the basic area is not cluttered as is the case 7
at, say, azimuth 270 on elevation 808. Beyond that, the individual supports 8
are basically one=way supports as opposed to the more complex frames used 9
as one, two, three, and even six-way restraints. There is practically 10 no friction conisderation for these supports. This may be noted from the 11 fact that of the 91 supports covered in the walk-down section of the report, 12 more than half are springs or snubbers. Of the remaining 43 or so, many are 13 struts. Therefore, this sample covers a far simpler segment than is the 14 norm for the plant. Beyond this, there were, to the best of my knowledge, 15 no A307 bolt problems, no instability problems, no local diaphram problems, 16 no cinched-up U-bolt problems, etc., present because of the nature of the 17 supports. Also, this area was a showcase area used to prove that the iterative 18 process was without problem.
19 Q:
You say this is not an independent review. How do you arrive at 20 this conclusion?
21 A:
Many factors lead to this conclusion. One example may be found in 22
. note No.1, attachment to PS-01, Appendix H, Pipe Support Check List. The 23 note effectively concurs with the vendors,the utility and Region IV NRC that 24 the stress contribution caused by the effects of seismic. events on the structure 25 comprising the support is negligible.
I don't recall anyone on either. side


1       of the question claiming that the self-weight excitation segment of cont'ri-2       bution was a major contributor to the stress of the support. All I have 3       ever stated is that this loading elenent was one of the cumulative contri-4       butors which must be considered. So long as the engineer is permitted to 5       design structures to the limits of the code allowables, the deletion of any
. 1 of the question claiming that the self-weight excitation segment of cont'ri-2 bution was a major contributor to the stress of the support. All I have 3
,  6        customarily included stress contributor on the basis that, by itself, it 7         induces a stress that is minor, is irrational. This premise is true because 8       the closer the design stress is to the code allowable, the more critical 9       minor contributors become. CYGNA is relying on item 3h of the SIT Report 10       #50-445/82-26 and 50-446/82-14 as if it were the position of the Nuclear 11       Regulatory Commission, rather than only one side of an argument which has 12     yet to be adjudicated. Beyond this, the code is specific as to what "shall" 13       be included in the design of supports. And this includes seismic for the 14       support dead load. See NF 3111(e) and NF 3112.2 of ASME Section III, also 15       NB, NC, and ND 3622.2, and 10 CFR Part 50, Appendix A, Criterion 2.
ever stated is that this loading elenent was one of the cumulative contri-4 butors which must be considered. So long as the engineer is permitted to 5
16             A second feature of this non-independent posture may be found in note 17       2 of the same source as note 1. In this case, CYGNA has not only deviated 18       from fundamentals, they are deviating from their own criteria. See Appendix 19       E " Pipe Support Design Review Criteria," page 4 of 11, 4.1.1. Stiffness, and 20       page 1, Exhibit 4.1-1. CYGNA, which by its own admission, not only did not f 21         review the NRC conclusions in regard to the generic stiffness study, but the i
design structures to the limits of the code allowables, the deletion of any 6
22       review report was not even available at the time of their review. Therefore, 23       a rational man may only conclude that CYGNA deviated from their own criteria 24       as a result of rumors that variations in the loads due to alterations in the l 25       suppcrt stiffness are negligible.
customarily included stress contributor on the basis that, by itself, it 7
induces a stress that is minor, is irrational. This premise is true because 8
the closer the design stress is to the code allowable, the more critical 9
minor contributors become. CYGNA is relying on item 3h of the SIT Report 10
#50-445/82-26 and 50-446/82-14 as if it were the position of the Nuclear 11 Regulatory Commission, rather than only one side of an argument which has 12 yet to be adjudicated. Beyond this, the code is specific as to what "shall" 13 be included in the design of supports. And this includes seismic for the 14 support dead load. See NF 3111(e) and NF 3112.2 of ASME Section III, also 15 NB, NC, and ND 3622.2, and 10 CFR Part 50, Appendix A, Criterion 2.
16 A second feature of this non-independent posture may be found in note 17 2 of the same source as note 1.
In this case, CYGNA has not only deviated 18 from fundamentals, they are deviating from their own criteria.
See Appendix 19 E " Pipe Support Design Review Criteria," page 4 of 11, 4.1.1. Stiffness, and 20 page 1, Exhibit 4.1-1.
CYGNA, which by its own admission, not only did not f 21 review the NRC conclusions in regard to the generic stiffness study, but the i
22 review report was not even available at the time of their review. Therefore, 23 a rational man may only conclude that CYGNA deviated from their own criteria 24 as a result of rumors that variations in the loads due to alterations in the l 25 suppcrt stiffness are negligible.
8
8


1           Having had access to this generic stiffness study, it is obvious that 2   200% increases in loads and in one case a 600% + change can hardly qualify 3   as negligible. Beyond this, the generic stiffness study did not include 4   all of the contributors to stiffness degradation such as effects of bolts, 5   hardware including U-bolts, local flexibilities, etc.     It is obvious that 6   if the actual stiffness values from node point to hard point were used, the 7   increase in loads on the supports would fall somewhere between severe and 8   catastrophic. To inspect the supports as CYGNA did without reference to 9   stiffness because someone told them it was no problem t totally irrational 10   and indicates a total lack of independence. An independent assessment would 11   have, as a minimum, proceeded with the-inspection to the criteria established 12   and as a caveat left the optimistic input for stiffness in the pipe stress 13   analysis as an open item pending the decision of the Board, which after 14   all in this instance will make the ruling.
. 1 Having had access to this generic stiffness study, it is obvious that 2
15           A third factor which might lead some to believe that CYGNA was either   .
200% increases in loads and in one case a 600% + change can hardly qualify 3
16     "somewhat knowledgeable" or not independent involves the problem of zero 17     inch gap on support No. SF-X-033-007; see WD03-01, Appendix F, " Observation 18     Record," 2.0 " Resolution." CYGNA identified a problem wherein a minimum 19     1/2" clearance required in the unrestrained direction was vielated. Their 20     solution to the problem was to ask for an explanation from the utility.
as negligible. Beyond this, the generic stiffness study did not include 4
21     Mr. Finneran explained that this problem was noted by CPSES and was recorded 22     on as-built reverification form 1267. Engineering solved this problem by 23     " accept as is," on 4/20/83.                                                   !
all of the contributors to stiffness degradation such as effects of bolts, 5
24           Not only did this suffice to close out this item as far as CYGNA is 1
hardware including U-bolts, local flexibilities, etc.
25     concerned, but they had to extend the following " independent" observation:
It is obvious that 6
if the actual stiffness values from node point to hard point were used, the 7
increase in loads on the supports would fall somewhere between severe and 8
catastrophic. To inspect the supports as CYGNA did without reference to 9
stiffness because someone told them it was no problem t totally irrational 10 and indicates a total lack of independence. An independent assessment would 11 have, as a minimum, proceeded with the-inspection to the criteria established 12 and as a caveat left the optimistic input for stiffness in the pipe stress 13 analysis as an open item pending the decision of the Board, which after 14 all in this instance will make the ruling.
15 A third factor which might lead some to believe that CYGNA was either 16 "somewhat knowledgeable" or not independent involves the problem of zero 17 inch gap on support No. SF-X-033-007; see WD03-01, Appendix F, " Observation 18 Record," 2.0 " Resolution." CYGNA identified a problem wherein a minimum 19 1/2" clearance required in the unrestrained direction was vielated. Their 20 solution to the problem was to ask for an explanation from the utility.
21 Mr. Finneran explained that this problem was noted by CPSES and was recorded 22 on as-built reverification form 1267.
Engineering solved this problem by 23
" accept as is," on 4/20/83.
24 Not only did this suffice to close out this item as far as CYGNA is 25 concerned, but they had to extend the following " independent" observation:


5-I   "This documentation indicates that the Comanche Peak as-built verification 2   is working effectively."
5-I "This documentation indicates that the Comanche Peak as-built verification 2
3           The problem, however, still exists. Nothing was accomplished which 4   would resolve the situation which obviously escaped detection by CPSES and 5   CYGNA. The purpose of the large gap requirement in the unrestrained direction 6   is to allow the pipe to _ move without restraint due to thennal expansion 7   or seismic event.     Since seismic is either way or either direction, I will 8   only address this occurrence.     If the pipe is free to move (unrestrainad),
is working effectively."
9   it will deflect first one way and then the other a number of times dependent 10   on the zero crossings for the specific event.       In this case, however, it 11   is restrained in one direction. This restraint will therefore react a force 12   in lieu of displacement. In short, this is no longer a one-way restraint, l
3 The problem, however, still exists. Nothing was accomplished which 4
13   but is now a two-way restraint. Additionally, since it is free in one un-14   restrained direction, the load is not simply the constraining effort in 16   one direction but now shock is present. Since this problem has been written 16   off, the magnitude of the shock load is unknowr., but still will contribute 17   to the stress in the supports which, as a result.of a lack 'of one element j   18   inducing stress, is also unknown.                          .
would resolve the situation which obviously escaped detection by CPSES and 5
19          The issuance of "use-as-is" does not necessarily eliminate problems, l
CYGNA. The purpose of the large gap requirement in the unrestrained direction 6
20   but as shown above may merely be burying them.
is to allow the pipe to _ move without restraint due to thennal expansion 7
21           A fourth area of concern involves the checkingsof calculations. See 22   Appendix H, " Pipe Support Check List," sheet 1 of'4, PS-14, support No.
or seismic event.
23   SI-1-073-0700-S32R. The reviewer made the following coment at item 1, 24   Coments, No. 3:       "The design calculation includes a pipe bearing stress 25   calculation although this is not required for general pipe design." (Emphasis 4
Since seismic is either way or either direction, I will 8
l
only address this occurrence.
If the pipe is free to move (unrestrainad),
9 it will deflect first one way and then the other a number of times dependent 10 on the zero crossings for the specific event.
In this case, however, it 11 is restrained in one direction. This restraint will therefore react a force 12 in lieu of displacement.
In short, this is no longer a one-way restraint, l
13 but is now a two-way restraint. Additionally, since it is free in one un-14 restrained direction, the load is not simply the constraining effort in 16 one direction but now shock is present. Since this problem has been written 16 off, the magnitude of the shock load is unknowr., but still will contribute 17 to the stress in the supports which, as a result.of a lack 'of one element j
18 inducing stress, is also unknown.
The issuance of "use-as-is" does not necessarily eliminate problems, 19 l
20 but as shown above may merely be burying them.
21 A fourth area of concern involves the checkingsof calculations. See 22 Appendix H, " Pipe Support Check List," sheet 1 of'4, PS-14, support No.
23 SI-1-073-0700-S32R. The reviewer made the following coment at item 1, 24 Coments, No. 3:
"The design calculation includes a pipe bearing stress 25 calculation although this is not required for general pipe design." (Emphasis l
4


6-I           added.) This reviewer would do well to look at the ASME Code, Section III, 2             Sub-Sections, NB, NC, and ND 3645 which states:                                                           " Attachments" which require l     3             the design of external attachments to pipe in a way that will avoid a flattening l
6-I added.) This reviewer would do well to look at the ASME Code, Section III, 2
4             of the pipe, excessive localized bending stresses or harmful gradients in 5             the pipe wall.
Sub-Sections, NB, NC, and ND 3645 which states:
6                   A fifth example of non-independent disposition of problems involves                                                                                             ,
" Attachments" which require l
7              support No.- SF-X-003-003-F43K, a snubber which passes close to the clamp                                                                                             {
3 the design of external attachments to pipe in a way that will avoid a flattening l
1 8             of another snubber, No. SF-X-007-014-F43K; see WD02-01, Appendix F, Observation 9             Record. In this case, the minimum clearance between the snubber (extension) 10             and the clamp is 1/4". This is not during plant operation nor utilization 11             of the spent fuel pool; therefore, we must assune the pipes are at plant l                                                                                                                                                                                           l 12             ambient.                                                                                                                                                             l 13                   While I lack sufficient information to pursue this problem, I find that 14             the maximum relative seismic movemer.t between these two points is only .0009 1.5           according to Texas Utilities.                                             I have, by calculation.on a number of snubbers 16             and struts, found the displacement of the hardware itself to be beyond thi:
4 of the pipe, excessive localized bending stresses or harmful gradients in 5
17               value. For example, for a 2" diameter standard pipe 4' long and simply sup-18               ported at each end, subjected to a 1 G seismic load, horizontal and per-19               pendicular to the axis of the pipe, the seismic displacement would be Sw1 4/384EI 20             where w = .304 lbs. per inch,1 = 48 inches, E = 29,000,000, and I = .666 in. .
the pipe wall.
21               or 5 X .304 X 48 4                          384EI = .0011 in. , which is 20% more than the total dif-22               ferential indicated by Texas Utilities.                                                     If the pipe were in a horizontal 23               plane, and were twice as long, and subjected to 1 G vertical, the deflection 24             would be .035 and 'the stress in the pipe would be 10% of the' allowable, and 25               this from dead load and seismic only. And this is without considering the                                                                                       -
6 A fifth example of non-independent disposition of problems involves 7
fN****='-w****=*=               ,MW*-a
support No.- SF-X-003-003-F43K, a snubber which passes close to the clamp
                                                                                    ]= =_=]*] _
{
__=e_g_=-_ -=~~=='=y   , -      ***---*-i-/m- -==*=-m -s: ee- =-we- *==$r*-= m---~^
1 8
of another snubber, No. SF-X-007-014-F43K; see WD02-01, Appendix F, Observation 9
Record.
In this case, the minimum clearance between the snubber (extension) 10 and the clamp is 1/4". This is not during plant operation nor utilization 11 of the spent fuel pool; therefore, we must assune the pipes are at plant l
l 12 ambient.
l 13 While I lack sufficient information to pursue this problem, I find that 14 the maximum relative seismic movemer.t between these two points is only.0009 1.5 according to Texas Utilities.
I have, by calculation.on a number of snubbers 16 and struts, found the displacement of the hardware itself to be beyond thi:
17 value. For example, for a 2" diameter standard pipe 4' long and simply sup-18 ported at each end, subjected to a 1 G seismic load, horizontal and per-4 19 pendicular to the axis of the pipe, the seismic displacement would be Sw1 /384EI 20 where w =.304 lbs. per inch,1 = 48 inches, E = 29,000,000, and I =.666 in..
4 21 or 5 X.304 X 48 384EI =.0011 in., which is 20% more than the total dif-22 ferential indicated by Texas Utilities.
If the pipe were in a horizontal 23 plane, and were twice as long, and subjected to 1 G vertical, the deflection 24 would be.035 and 'the stress in the pipe would be 10% of the' allowable, and 25 this from dead load and seismic only. And this is without considering the fN****='-w****=*=
,MW*-a
]=
=_=]*]
__=e_g_=-_
-=~~=='=y
***---*-i-/m-
-==*=-m
-s:
ee-
=-we-
*==$r*-=
m---~^


1         pipe node poiat movement or the differential movement of two run pipes which 2         may be seismically out of phase. Also, I must point out that after years 3           of operational cycling, the node point will not maintain the as-constructed 4           loca tion.
. 1 pipe node poiat movement or the differential movement of two run pipes which 2
5                 Beyond this, it is amusing to note that the following note appears on 6           the page:                 "
may be seismically out of phase. Also, I must point out that after years 3
Texas Utilities has determined that the maximum relative move-7         ment at these two points are as follows:" This would hardly seem to be an i 8           independent assessment, when CYGNA finds a problem but Texas Utilities writes 9         it off.
of operational cycling, the node point will not maintain the as-constructed 4
10                   Q:           What do you mean by "the section devoted to design criteria lacks il         a number of criteria"?
loca tion.
2                 A:           We must assume tnat the criteria was outlined prior to the review
5 Beyond this, it is amusing to note that the following note appears on 6
:3         and therefore the review team was unaware of the support configuration with 16         which they would be involved.                                   If this was the case, the criteria must contain 15         a sufficient check list to review whatever type of support exists and flag 16         the items to be checked.                                   In this case, the reviewer should be looking for 17         the following, which were not included in his check list except in such 18         broad terms that from the review it is not possible to decipher what features 9         were reviewed.
the page:
20                                 a.           Ins tabili ty; 21                                 b.         Approved hardware (with load data sheets);
Texas Utilities has determined that the maximum relative move-7 ment at these two points are as follows:" This would hardly seem to be an i 8 independent assessment, when CYGNA finds a problem but Texas Utilities writes 9
22                                 c.         Prying action; 23                                 d.         Summation of torsional effects to nonnal stress; 24                                 e.         Local diaphram action; 25                                 f.       Worst-case, additive signs for load input; 1
it off.
I l
10 Q:
        .w,     agw .c   .a4-,w.,+n       y av s   *v'wv '"w-== " "*"-
What do you mean by "the section devoted to design criteria lacks il a number of criteria"?
2 A:
We must assume tnat the criteria was outlined prior to the review
:3 and therefore the review team was unaware of the support configuration with 16 which they would be involved.
If this was the case, the criteria must contain 15 a sufficient check list to review whatever type of support exists and flag 16 the items to be checked.
In this case, the reviewer should be looking for 17 the following, which were not included in his check list except in such 18 broad terms that from the review it is not possible to decipher what features 9
were reviewed.
20 a.
Ins tabili ty; 21 b.
Approved hardware (with load data sheets);
22 c.
Prying action; 23 d.
Summation of torsional effects to nonnal stress; 24 e.
Local diaphram action; 25 f.
Worst-case, additive signs for load input;
.w, agw
.c
.a4-,w.,+n y av s
*v'wv
'"w-==
. 1 g.
Massive hardware and structure included in calculations; 2
h.
Weld transition for tubes (Beta angle);
3 1.
Shear distribution for bolts in bearing; 4
j.
Loads induced into piping; 5
k.
Constraint to thermal growth of pipe; 6
1.
Minimum weld and single pass requirements; 7
m.
Thennal constraint of supports (wall-to-wall, etc.);
8 n.
A-307 bolts used in fricidon connections; 9
o.
Stress ratio based on sum of contributors; 10 p.
Web crippling; jj q.
Shear lag (wide flanges loaded on single flange);
12 r.
Flange rotation (wide flanges);
13 s.
Web bending (wide flanges, channels, etc.);
14 t.
Use of principal axis for unsemetrical bending; i
15 u.
Loading off shear center; 16 v.
Bending allowable reductions for unbraced length; 17 w.
Bending allowable reduction when compression ratio in bending 18 members exceeds stress ratio of.15; jg x.
Differential spring rates (double struts of unequal length 20 reacting single' load, for example);
21 y.
Friction or displacement equivalent load for all supports;-
l z.
Effective length of intennittent welds; l
22 23 aa. Support resisting. seismic movement or dead load of buildings; I
bb.
Check for loading induced by supports which must be picked l
24 25 up by other up or down stream supports'.
l


1    g. Massive hardware and structure included in calculations; 2    h. Weld transition for tubes (Beta angle);
9-1 There are other features which require checking; however, this should 2
3    1. Shear distribution for bolts in bearing; 4    j. Loads induced into piping; 5    k. Constraint to thermal growth of pipe; 6    1. Minimum weld and single pass requirements; 7    m. Thennal constraint of supports (wall-to-wall, etc.);
suffice to indicate the failure of the CYGNA check lists to adequately address i
8    n. A-307 bolts used in fricidon connections; 9     o. Stress ratio based on sum of contributors; 10    p. Web crippling; jj    q. Shear lag (wide flanges loaded on single flange);
3 the review as required.
12    r. Flange rotation (wide flanges);
4 Q:
13    s. Web bending (wide flanges, channels, etc.);
What do you mean by "the document lacks the information required 5
14    t. Use of principal axis for unsemetrical bending; i    15  u. Loading off shear center; 16  v. Bending allowable reductions for unbraced length; 17    w. Bending allowable reduction when compression ratio in bending 18        members exceeds stress ratio of .15; jg    x. Differential spring rates (double struts of unequal length 20        reacting single' load, for example);
for a proper assessment of its accuracy"?
!  21    y. Friction or displacement equivalent load for all supports;-
6 A:
l l  22    z. Effective length of intennittent welds; 23    aa. Support resisting. seismic movement or dead load of buildings; I
For example, among the items not included:
24    bb. Check for loading induced by supports which must be picked l
7 a.
25        up by other up or down stream supports'.
The stress ratio; 8
l                                          .
b.
 
The configuration of the support; and 9
9-                                      .
c.
1                   There are other features which require checking; however, this should 2             suffice to indicate the failure of the CYGNA check lists to adequately address i     3             the review as required.
The loads and deflection.
4                   Q:   What do you mean by "the document lacks the information required 5             for a proper assessment of its accuracy"?
10 The report is written as if the infallibility of the reviewer was un-11 contested end only those observations made by the reviewer are open to question.
6                   A:   For example, among the items not included:
12 There is really no way for one reading the report to assess the value of 13 the exercise except to analyze the write-off procedures utilized by the 14 reviewer.
7                         a. The stress ratio; 8                         b. The configuration of the support; and 9                         c. The loads and deflection.
15 Q:
10                   The report is written as if the infallibility of the reviewer was un-11           contested end only those observations made by the reviewer are open to question.
What do you mean bv "in fact the conclusions by CYGNA are the 16 opposite of those which should have been assessed"?
12           There is really no way for one reading the report to assess the value of 13             the exercise except to analyze the write-off procedures utilized by the 14             reviewer.
! 17 A:
15                   Q:   What do you mean bv "in fact the conclusions by CYGNA are the 16             opposite of those which should have been assessed"?
Before getting into specifics, it is well to note two statements 18 made by CYGNA in Section 4 of their report.
  ! 17                   A:   Before getting into specifics, it is well to note two statements 18             made by CYGNA in Section 4 of their report.       First, on page 4-10, 4.3.2.
First, on page 4-10, 4.3.2.
19             " Pipe Supports Review," last paragraph:     "In general the supports calculations 20             are well done." The second statement appears on 4-17 and 4-18 " Mechanical 21             Walkdown (Piping and Supports)":"The purpose of the walkdown was to verify 22             the as-built location of pertinent features of the piping system such as 23             valves, branch connections, elbows and supports and to verify the as-built t 24                 condition of the supports."     (Emphasis added.)
19
25                   "Except in the few places where any form of measurement (either accurate i
" Pipe Supports Review," last paragraph:
I
"In general the supports calculations 20 are well done." The second statement appears on 4-17 and 4-18 " Mechanical 21 Walkdown (Piping and Supports)":"The purpose of the walkdown was to verify 22 the as-built location of pertinent features of the piping system such as 23 valves, branch connections, elbows and supports and to verify the as-built t 24 condition of the supports."
          . _ - --. - -                      -      :. s               -
(Emphasis added.)
25 "Except in the few places where any form of measurement (either accurate i
I s


4 l
4 l
)         1     or approximate) was not possible the- lodation of all piping elements was i         2     verified to be in conformarme with the relevant drawings." It is these two i
)
!          3       statements that I find I must challenge.
1 or approximate) was not possible the-lodation of all piping elements was i
2 verified to be in conformarme with the relevant drawings." It is these two i
3 statements that I find I must challenge.
i
i
}         4               In reference to the first statement, the first paint of consequence 5       is to keep in mind that only 31 calculations were reviewed, and these as l,
}
l 6                                                                                                             '
4 In reference to the first statement, the first paint of consequence 5
q                 were stated above were among the simplest at CPSES.
is to keep in mind that only 31 calculations were reviewed, and these as l,
!          7               Among those items noted by the reviewer in Appendix H that were written j         8       off are the following which also include drawing errors in addition to calcu-9       lational errors:
l 6
10               a. PS-02 Super Hilti shown on drawing with 6 " embedment; required 11                     embedment is 8-1/8";
q were stated above were among the simplest at CPSES.
12               b. PS-03, enbednent length'for anchor bolt is shown on drawing as 13                     3-1/2"; the require'd length is 5".
7 Among those items noted by the reviewer in Appendix H that were written j
!        14               The above two were considered as drawing errors.
8 off are the following which also include drawing errors in addition to calcu-9 lational errors:
15               c. PS-05, weld length is actually 9" but 6" was used in the calculation.
10 a.
16                     Strut allowable is 14,200 lbs.but calculations used allowable of 17                       15,700 lbs. The actual load on the support is 7,974 lbs. Bolt 18                     locations used were incorrect.
PS-02 Super Hilti shown on drawing with 6 " embedment; required 11 embedment is 8-1/8";
19               d. PS-06, take out for hardware is 9"; 10" was used in calculation.
12 b.
20                     Anchor bolt allowable was reduced, althought no space violation 21                     existed.
PS-03, enbednent length'for anchor bolt is shown on drawing as 13 3-1/2"; the require'd length is 5".
22               e. PS-07, moment X should be 52,824 lbs.; in the calculation moment 23                     X used was 28,858 lbs.
14 The above two were considered as drawing errors.
24               f. PS-09, seismic movement was not considered in spring design.
15 c.
c                                                                   .
PS-05, weld length is actually 9" but 6" was used in the calculation.
i        25               g. PS-11, forces used to qualify welds were incorrect.
16 Strut allowable is 14,200 lbs.but calculations used allowable of 17 15,700 lbs. The actual load on the support is 7,974 lbs. Bolt 18 locations used were incorrect.
i                                                                                                                         l 4
19 d.
PS-06, take out for hardware is 9"; 10" was used in calculation.
20 Anchor bolt allowable was reduced, althought no space violation 21 existed.
22 e.
PS-07, moment X should be 52,824 lbs.; in the calculation moment 23 X used was 28,858 lbs.
24 f.
PS-09, seismic movement was not considered in spring design.
c i
25 g.
PS-11, forces used to qualify welds were incorrect.
i 4
e
e
_                        -,        +   .-          -  _, ,,          ,- ,- _ - - _ __ -    -- ..      - e +
+
e
+


I             h. A ' PUS U-bolt was used instead'of a PUH U-bolt, but it was the 2                   PUH allowable whic'h was used in the calculation.
I h.
3                 The res ' ewer rechecked against the PUS allowable. The load on 4                 the bolt was 3915 lbs. and the allowable (per the reviewer) is 5                 3,620 X 1.3 = 4706 lbs. (In reference to the stiffness importance, 6                 if the load on this support increases by less than 25%, the allowable 7                 for the U-bolt is exceeded. By Ed.)
A ' PUS U-bolt was used instead'of a PUH U-bolt, but it was the 2
8             1. PS-10, the pipe displacement supplied to support design was shown 9                 to be .395 inches, whereas it should have been +.395 inches.
PUH allowable whic'h was used in the calculation.
10           j. PS-25, stiffener ignored in base plate calculation (reviewer states 11                 that this is 0.K. because it is conservative).
3 The res ' ewer rechecked against the PUS allowable. The load on 4
12                 This caveat by the reviewer may or may not be true, but in any 13                 event, the reviewer obviously did not check the problem correctly.
the bolt was 3915 lbs. and the allowable (per the reviewer) is 5
14                 That is, the stiffener may be inadequate; it has not been qualified.
3,620 X 1.3 = 4706 lbs. (In reference to the stiffness importance, 6
15                 Base plate analyzed by FUB II base plate calculator program with 16                 load centered on plate but actually the load is eccentric by one 17                 inch..
if the load on this support increases by less than 25%, the allowable 7
18           k. PS-30, SA193-B7 rods were used to replace normal Hilti bolts 19                   (bolt naterial made of SA4140 steel similar td the situation 20                 with A307 bolts made of SA36 steel).
for the U-bolt is exceeded. By Ed.)
l 21             Also, four calculations stated that " loads used were from a previous 22     run which were higher than the new as-built loads." From this, one cannot 23     tell if. the calculation was checked to the loads used or written.off because 24     the new loads are l'ower.
8 1.
25             In any event, checking the above citations, it does not take much of i
PS-10, the pipe displacement supplied to support design was shown 9
26     a brain to note that of the 31 drcwings involved, at least two drawings 'had         '
to be.395 inches, whereas it should have been +.395 inches.
l 27     errors. This was about 7% of the drawings. Of the 31 calculations, at least I                 -
10 j.
PS-25, stiffener ignored in base plate calculation (reviewer states 11 that this is 0.K. because it is conservative).
12 This caveat by the reviewer may or may not be true, but in any 13 event, the reviewer obviously did not check the problem correctly.
14 That is, the stiffener may be inadequate; it has not been qualified.
15 Base plate analyzed by FUB II base plate calculator program with 16 load centered on plate but actually the load is eccentric by one 17 inch..
18 k.
PS-30, SA193-B7 rods were used to replace normal Hilti bolts 19 (bolt naterial made of SA4140 steel similar td the situation 20 with A307 bolts made of SA36 steel).
l 21 Also, four calculations stated that " loads used were from a previous 22 run which were higher than the new as-built loads." From this, one cannot 23 tell if. the calculation was checked to the loads used or written.off because 24 the new loads are l'ower.
25 In any event, checking the above citations, it does not take much of i
26 a brain to note that of the 31 drcwings involved, at least two drawings 'had l
27 errors. This was about 7% of the drawings. Of the 31 calculations, at least I


1 8 had one error (one had three errors). This is about 25% of the package.
. 1 8 had one error (one had three errors). This is about 25% of the package.
t l   2   Six of these errors, or about 20% of the package, were non-conservative errors.
t l
i
2 Six of these errors, or about 20% of the package, were non-conservative errors.
,    3    If one out of 5 calculations contains a non-conservative error, the renainder 4   of the plant is in doubt. Beyond this, we might recall that the actual stiff-5   ness and seismic acceleration of support ' steel was neglected. From the preceding, 6   therefore, I am hard put to understand the first quotation "well done."
i 3
7   In reference to the walk-down as-built assessment check list, the information 8   to be gleaned from the limited documentation is equally interesting.
If one out of 5 calculations contains a non-conservative error, the renainder 4
9         To start with, at Section 4.0, page 4-19, first item (in reference to 10 the walkdown effort) states that four snubberr have been inverted 1800 but 11 does not state whether an investigation had been made to determine if boots 12 were required (for the condition before or after). Also, there is no state-13 ment which indicates if the mechanism has been converted into proximity 14 with a hot line or the other way around. All that is mentioned is that 15 CP-CPM 9.17 dated 5/31/83 permits this inversion without including the 16 document. Of more interest is the numbers game introduced in this section 17 and to determine the numbers of actual supports which were reviewed per 18   the CYGNA criteria " verify the as-built condition of the supports." We 19   must first eliminate those supports which were not verified other than visually 20   (which means that someone saw the support) or ground projection (which means 21   much the same as visual observation from a substantial distance). These sup-22   ports were obviously out of range of a 12,14,, or 16 foot ladder or even
of the plant is in doubt. Beyond this, we might recall that the actual stiff-5 ness and seismic acceleration of support ' steel was neglected.
  '23   an extension ladder; therefore, visual observation has no meaning.
From the preceding, 6
Further, 24   I note that a transit has not been mentiored, although it would have proved 25   rather useful. The fact that some dimensions were taken on seven supports
therefore, I am hard put to understand the first quotation "well done."
7 In reference to the walk-down as-built assessment check list, the information 8
to be gleaned from the limited documentation is equally interesting.
9 To start with, at Section 4.0, page 4-19, first item (in reference to 10 the walkdown effort) states that four snubberr have been inverted 1800 but 11 does not state whether an investigation had been made to determine if boots 12 were required (for the condition before or after). Also, there is no state-13 ment which indicates if the mechanism has been converted into proximity 14 with a hot line or the other way around. All that is mentioned is that 15 CP-CPM 9.17 dated 5/31/83 permits this inversion without including the 16 document. Of more interest is the numbers game introduced in this section 17 and to determine the numbers of actual supports which were reviewed per 18 the CYGNA criteria " verify the as-built condition of the supports." We 19 must first eliminate those supports which were not verified other than visually 20 (which means that someone saw the support) or ground projection (which means 21 much the same as visual observation from a substantial distance). These sup-22 ports were obviously out of range of a 12,14,, or 16 foot ladder or even
'23 an extension ladder; therefore, visual observation has no meaning.
: Further, 24 I note that a transit has not been mentiored, although it would have proved 25 rather useful. The fact that some dimensions were taken on seven supports


13 -
13 -
1                 also means that some dimensions were' not' taken. Therefore, of the 91 supports 2                 that made up the review, only 48 were actually reviewed.                           Of this number, 3               4 contained drawing errors; they were WD-01 on page 9 of 11, branch dimension 4                 is wrong; WD-02, page 4 of 10, drawing incorrectly shows square tube, filler 5               material shows a round tube, also this drawing has an incorrect centerline 6                 dimension; WD-02, page 8 of 10, drawing shows wrong pipe centerline elevation; 7               WD-03, page 9 of 12, sway strut length is incorrect. From this we find that 8                 about 1/12, or about 8%, of the drawings have errors.                           In summation, of the 9                 31 calculations and 48 reviewed supports (79 total supports),12 have drawing 10               errors and 8 have calculation errors.                         In addition, two others have post-11               construction errors'(1) clearance between two different supports and (1) 12               no clearance in the unrestrained direction. Thus, for 79 supports, there 13               are 22 discrepancies, or 25% of the supports have an error. And this is 14               for a system which was to showcase the iterative process and has been sub-15               jected to more checks than Chase Manhattan Bank.                         If I were reviewing any 16               system and found that 25% of it contained errors, I would have to say that 17                 if this system were even remotely indicative of the remainder of the plant, 18                 then the plant is in trouble. There is no way that I'could write off the 19                 rest of the plant as being safe based on the findings as they exist in the 20 CYGNA Report. The fact that CYGNA could justify some of the errors on the 21                 basis that the stress ratio was low enough to absorb the error is without 22                 merit except on a case-by-case basis. Since it is probable that on another 23                 support the stress ratio may be too close to the allowable limit to absorb 24                 any increase in stress, whether such stress results from an error or an 25                 increase in load due to use of the actual stiffness factor which is less                                                   !
1 also means that some dimensions were' not' taken. Therefore, of the 91 supports 2
m y
that made up the review, only 48 were actually reviewed.
4<4-     +--,--wem-4               ,-w-       =w-ww     =, , -m w me ,e-.
Of this number, 3
                                                                                %. w 9 g     y
4 contained drawing errors; they were WD-01 on page 9 of 11, branch dimension 4
is wrong; WD-02, page 4 of 10, drawing incorrectly shows square tube, filler 5
material shows a round tube, also this drawing has an incorrect centerline 6
dimension; WD-02, page 8 of 10, drawing shows wrong pipe centerline elevation; 7
WD-03, page 9 of 12, sway strut length is incorrect.
From this we find that 8
about 1/12, or about 8%, of the drawings have errors.
In summation, of the 9
31 calculations and 48 reviewed supports (79 total supports),12 have drawing 10 errors and 8 have calculation errors.
In addition, two others have post-11 construction errors'(1) clearance between two different supports and (1) 12 no clearance in the unrestrained direction.
Thus, for 79 supports, there 13 are 22 discrepancies, or 25% of the supports have an error. And this is 14 for a system which was to showcase the iterative process and has been sub-15 jected to more checks than Chase Manhattan Bank.
If I were reviewing any 16 system and found that 25% of it contained errors, I would have to say that 17 if this system were even remotely indicative of the remainder of the plant, 18 then the plant is in trouble. There is no way that I'could write off the 19 rest of the plant as being safe based on the findings as they exist in the 20 CYGNA Report. The fact that CYGNA could justify some of the errors on the 21 basis that the stress ratio was low enough to absorb the error is without 22 merit except on a case-by-case basis. Since it is probable that on another 23 support the stress ratio may be too close to the allowable limit to absorb 24 any increase in stress, whether such stress results from an error or an 25 increase in load due to use of the actual stiffness factor which is less m
y 4<4-
+--,--wem-4
,-w-
=w-ww
=,, -m w me
,e-.
%. w 9 g y


14 -
14 -
1   than the generic stiffness.
1 than the generic stiffness.
2       The following should point out the minor nature of problems which can 3   result in major failures:
2 The following should point out the minor nature of problems which can 3
4         1. The steam generator failure at Beaver Valley nuclear power station 5             resulted from a failure of the supports which were non-conservatively 6               designed for the original smaller generator.
result in major failures:
7         2. The failure of a 3/4" air valve resulted in the chain of events 8               that we now call the accident at TMI.
4 1.
9         3. The failure of a zirconium deflector resulted in the accident           .
The steam generator failure at Beaver Valley nuclear power station 5
10             a t Fermi 1.
resulted from a failure of the supports which were non-conservatively 6
11       4. Browns Ferry suffered major damage and was fast approaching catastrophic 12             proportions as the result of a workman's candle igniting flammable 13             materials.
designed for the original smaller generator.
14         We have enough problems with the unforeseen without evading the fore-15   seeable. It is not in the interest of public safety to await the onslaught 16   of a seismic event to highlight the errors in engineering, nor is the fact 17   that seismic loading is incorporated into the analysis enough to assume 18   that it will act as a safety factor for errors during the period of non-19   seismic activity, as this would then reduce the probability of accident 20   to the cycle of seismic activity. Consider: with the existence of non-21   conservative error in at lera. 20% of the sample ' reviewed, the probability 22   of the same percentage of non-conservative error in the 40,000 supports 23   for CPSES means that 7,742 random supports are at risk.. And no one can               ,
7 2.
24   state offhand which of these can be dismissed as being capable of absorbing 25   an unknown error.
The failure of a 3/4" air valve resulted in the chain of events 8
that we now call the accident at TMI.
9 3.
The failure of a zirconium deflector resulted in the accident 10 a t Fermi 1.
11 4.
Browns Ferry suffered major damage and was fast approaching catastrophic 12 proportions as the result of a workman's candle igniting flammable 13 materials.
14 We have enough problems with the unforeseen without evading the fore-15 seeable.
It is not in the interest of public safety to await the onslaught 16 of a seismic event to highlight the errors in engineering, nor is the fact 17 that seismic loading is incorporated into the analysis enough to assume 18 that it will act as a safety factor for errors during the period of non-19 seismic activity, as this would then reduce the probability of accident 20 to the cycle of seismic activity. Consider: with the existence of non-21 conservative error in at lera. 20% of the sample ' reviewed, the probability 22 of the same percentage of non-conservative error in the 40,000 supports 23 for CPSES means that 7,742 random supports are at risk.. And no one can 24 state offhand which of these can be dismissed as being capable of absorbing 25 an unknown error.
I s-
I s-


    . _ _ -          -- .=               ~.   - .  - -_ . _ - .      - _ . _ . .          .                  .        _ _        -
--.=
i 1                   A final point to be made is in reference to the actual stiffness factors 2         of the supports. The generic stiffness study shows that in the particular
~.
)       3         case studied, the loads increased by up to 200%. Compare this with the comment l
i 1
1     4           at 2. of check list PS-10, Appendix H:
A final point to be made is in reference to the actual stiffness factors 2
5                   " Bolts noted as unacceptable on the calculations.               The designer waited for as-built loads for a final determination of acceptability as part
of the supports. The generic stiffness study shows that in the particular
;      6                    of the as-built program. The final load did decrease to acceptable l evels . "
)
7 8                     If changes in loads will qualify these supports which fail to meet the 9           stress criteria, changes can also act to disqualify a previously qualified 10             support.
3 case studied, the loads increased by up to 200%. Compare this with the comment l
11                       Q:     Do you believe you found all of the items which concern you in j   12             regards to the CYGNA review?
1 4
)   13                       A:     No, I-do not, because my critique is based on the contents of the 14             commentary supplied by CYGNA, and this is only in areas where they had made i
at 2. of check list PS-10, Appendix H:
15             an observation.. If we had access to the'itens which did not trigger an 16             observation, it is possible that the number of conflicts would have been 17             higher.         To carry this thought'one step further, one has only to examine                     '
5
18             the types of supports reviewed versus the requirements of ASME Section III 19             to determine if there is a doubt that all factors were covered by the CYGNA 20             reviev.
" Bolts noted as unacceptable on the calculations.
21~                             Subsection NF 4000 contains several interesting items which were 22             generically neglected at CPSES. -For example, the Applicant and Region IV 23             went to great lengths to prove that their support base' plate joints are 24             all of the bearing type.(no friction joints).                     In this case, there are two
The designer waited for as-built loads for a final determination of acceptability as part 6
                                                                                                      ~
of the as-built program. The final load did decrease to acceptable l evels. "
25             areas which I noted when I worked at CPSES whic". I did not find mentioned
7 8
                                                    ~
If changes in loads will qualify these supports which fail to meet the 9
          *                     "  " ' "    r
stress criteria, changes can also act to disqualify a previously qualified 10 support.
            *t                                  -p W   w         v     vv e-rw e f     v W     7 * -'
11 Q:
                                                                                                                                          -7
Do you believe you found all of the items which concern you in j
12 regards to the CYGNA review?
)
13 A:
No, I-do not, because my critique is based on the contents of the 14 commentary supplied by CYGNA, and this is only in areas where they had made i
15 an observation.. If we had access to the'itens which did not trigger an 16 observation, it is possible that the number of conflicts would have been 17 higher.
To carry this thought'one step further, one has only to examine 18 the types of supports reviewed versus the requirements of ASME Section III 19 to determine if there is a doubt that all factors were covered by the CYGNA 20 reviev.
21~
Subsection NF 4000 contains several interesting items which were 22 generically neglected at CPSES. -For example, the Applicant and Region IV 23 went to great lengths to prove that their support base' plate joints are 24 all of the bearing type.(no friction joints).
In this case, there are two
~
25 areas which I noted when I worked at CPSES whic". I did not find mentioned
~
*t r
-p W
w v
vv e-rw e
f v
W 7
-7


l 1     in the CYGNA review, either as a criteria to be checked or mentioned in their 2     observa tions. These items are:     The requirement to exclude bolt threads i
.. 1 in the CYGNA review, either as a criteria to be checked or mentioned in their 2
3     from the load bearing shank of bolts loaded in shear (generically violated 4     in the NPSI Richmond / tube support configurations, in which case the full 5     length of the A307 bolt is threaded). This violation is covered by NF 4722(b).
observa tions. These items are:
6     A second area involves the fact that locking devices for all threaded fasteners 7     must be provided, and this is covered by NF 4725. From my observations of 8     the base plates at CPSES, I find it hard to believe that CYGNA found no 9     violations of the type mentioned above during their walk-down.
The requirement to exclude bolt threads i
10             Q:   What causes you to be so certain that the CYGNA report is not 11       independent beyond the criticism you have with their observations and the 12       manner in which they closed out the problems?
3 from the load bearing shank of bolts loaded in shear (generically violated 4
13             A:   Independence is not achieved when one must proceed from a posture 14       of self-defense, nor is independence achieved by having such an open mind 15       that your brains have fallen out. This obviously is the position that CYGNA 16       or any other organization or individual who depends on the nuclear industry 17       finds itself in an effort to ensure the acquisition of future contracts 18       or employment (such contracts as CYGNA now enjoys at the Seabrook nuclear 19       facility supplying support engineers on a contract basis). As the~ Board 20       is well aware, due to the number of affidavits filed charging retaliation 21       for making waves in the industry, it is obvious that one must exercise caution 22       in the critique of a member of the nuclear family. As is well known, it 23       is the bottom line which counts.
in the NPSI Richmond / tube support configurations, in which case the full 5
24           ' Q:   Do you have anything further to say?
length of the A307 bolt is threaded). This violation is covered by NF 4722(b).
25             A:   No, not at this particular time. . .
6 A second area involves the fact that locking devices for all threaded fasteners 7
                                                                            .s .
must be provided, and this is covered by NF 4725.
l
From my observations of 8
' . _ _ . __ - .        _.__1              .}}
the base plates at CPSES, I find it hard to believe that CYGNA found no 9
violations of the type mentioned above during their walk-down.
10 Q:
What causes you to be so certain that the CYGNA report is not 11 independent beyond the criticism you have with their observations and the 12 manner in which they closed out the problems?
13 A:
Independence is not achieved when one must proceed from a posture 14 of self-defense, nor is independence achieved by having such an open mind 15 that your brains have fallen out. This obviously is the position that CYGNA 16 or any other organization or individual who depends on the nuclear industry 17 finds itself in an effort to ensure the acquisition of future contracts 18 or employment (such contracts as CYGNA now enjoys at the Seabrook nuclear 19 facility supplying support engineers on a contract basis). As the~ Board 20 is well aware, due to the number of affidavits filed charging retaliation 21 for making waves in the industry, it is obvious that one must exercise caution 22 in the critique of a member of the nuclear family. As is well known, it 23 is the bottom line which counts.
24
' Q:
Do you have anything further to say?
25 A:
No, not at this particular time...
.s.
l 1
.}}

Latest revision as of 22:18, 14 December 2024

Testimony of J Doyle Re Cygna Rept on Pipes & Pipe Supports
ML20080E716
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/07/1984
From: Doyle J
Citizens Association for Sound Energy
To:
Shared Package
ML20080E713 List:
References
NUDOCS 8402100072
Download: ML20080E716 (16)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _

I l

UNITED STATES OF AMERICA l

NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC' SAFETY AND LICENSING BOARD t

In the Matter of APPLICATION OF TEXAS UTILITIES I

I Docket Nos. 50-445 l

GENERATING COMPANY, ET AL. FOR and 50-446 l

AN OPERATING LICENSE FOR I

COMANCHE PEAK STEAM ELECTRIC I

STATION UNITS #1 AND #2 I

(CPSES)

TESTIMONY OF CASE WITNESS f

JACK D0YLE i

1 Q:

Mr. Doyle, have you read the CYGNA Report?

2 A:

Yes, I have.

3 Q:

What is your opinion of this document?

4 A:

I have several objections to this document:

5 (1)

It represents one of the simpler areas in' the plant containing 6

pipes and pipe supports, which is all that I am addressing 7

in this testimony; 8

(2)

It is not an independent assessment of the systems being 9

reviewed; 10 (3) The section devoted to the pipe support criteria lacks a 11 number of criteria which are critical to any assesscent of 12 supports; 13 (4) The document lacks the information required for a proper i

14 assessment of its; accuracy; 15 (5) The bare minimum of information contained in this document 16 is still sufficient to lead an independent reviewer to come

(

8402100072 840207

' l

{DRADOCM 05000445 PDR

__J

. 1 to conclusions which are not reflected by this doctanent.

2 In fact, the conclusions by CYGNA are the opposite of those 3

which should have been assessed.

4 Q:

Taking these itans in order, what do you mean by "one of the simpler 5

areas"?

6 A:

To start with, the basic area is not cluttered as is the case 7

at, say, azimuth 270 on elevation 808. Beyond that, the individual supports 8

are basically one=way supports as opposed to the more complex frames used 9

as one, two, three, and even six-way restraints. There is practically 10 no friction conisderation for these supports. This may be noted from the 11 fact that of the 91 supports covered in the walk-down section of the report, 12 more than half are springs or snubbers. Of the remaining 43 or so, many are 13 struts. Therefore, this sample covers a far simpler segment than is the 14 norm for the plant. Beyond this, there were, to the best of my knowledge, 15 no A307 bolt problems, no instability problems, no local diaphram problems, 16 no cinched-up U-bolt problems, etc., present because of the nature of the 17 supports. Also, this area was a showcase area used to prove that the iterative 18 process was without problem.

19 Q:

You say this is not an independent review. How do you arrive at 20 this conclusion?

21 A:

Many factors lead to this conclusion. One example may be found in 22

. note No.1, attachment to PS-01, Appendix H, Pipe Support Check List. The 23 note effectively concurs with the vendors,the utility and Region IV NRC that 24 the stress contribution caused by the effects of seismic. events on the structure 25 comprising the support is negligible.

I don't recall anyone on either. side

. 1 of the question claiming that the self-weight excitation segment of cont'ri-2 bution was a major contributor to the stress of the support. All I have 3

ever stated is that this loading elenent was one of the cumulative contri-4 butors which must be considered. So long as the engineer is permitted to 5

design structures to the limits of the code allowables, the deletion of any 6

customarily included stress contributor on the basis that, by itself, it 7

induces a stress that is minor, is irrational. This premise is true because 8

the closer the design stress is to the code allowable, the more critical 9

minor contributors become. CYGNA is relying on item 3h of the SIT Report 10

  1. 50-445/82-26 and 50-446/82-14 as if it were the position of the Nuclear 11 Regulatory Commission, rather than only one side of an argument which has 12 yet to be adjudicated. Beyond this, the code is specific as to what "shall" 13 be included in the design of supports. And this includes seismic for the 14 support dead load. See NF 3111(e) and NF 3112.2 of ASME Section III, also 15 NB, NC, and ND 3622.2, and 10 CFR Part 50, Appendix A, Criterion 2.

16 A second feature of this non-independent posture may be found in note 17 2 of the same source as note 1.

In this case, CYGNA has not only deviated 18 from fundamentals, they are deviating from their own criteria.

See Appendix 19 E " Pipe Support Design Review Criteria," page 4 of 11, 4.1.1. Stiffness, and 20 page 1, Exhibit 4.1-1.

CYGNA, which by its own admission, not only did not f 21 review the NRC conclusions in regard to the generic stiffness study, but the i

22 review report was not even available at the time of their review. Therefore, 23 a rational man may only conclude that CYGNA deviated from their own criteria 24 as a result of rumors that variations in the loads due to alterations in the l 25 suppcrt stiffness are negligible.

8

. 1 Having had access to this generic stiffness study, it is obvious that 2

200% increases in loads and in one case a 600% + change can hardly qualify 3

as negligible. Beyond this, the generic stiffness study did not include 4

all of the contributors to stiffness degradation such as effects of bolts, 5

hardware including U-bolts, local flexibilities, etc.

It is obvious that 6

if the actual stiffness values from node point to hard point were used, the 7

increase in loads on the supports would fall somewhere between severe and 8

catastrophic. To inspect the supports as CYGNA did without reference to 9

stiffness because someone told them it was no problem t totally irrational 10 and indicates a total lack of independence. An independent assessment would 11 have, as a minimum, proceeded with the-inspection to the criteria established 12 and as a caveat left the optimistic input for stiffness in the pipe stress 13 analysis as an open item pending the decision of the Board, which after 14 all in this instance will make the ruling.

15 A third factor which might lead some to believe that CYGNA was either 16 "somewhat knowledgeable" or not independent involves the problem of zero 17 inch gap on support No. SF-X-033-007; see WD03-01, Appendix F, " Observation 18 Record," 2.0 " Resolution." CYGNA identified a problem wherein a minimum 19 1/2" clearance required in the unrestrained direction was vielated. Their 20 solution to the problem was to ask for an explanation from the utility.

21 Mr. Finneran explained that this problem was noted by CPSES and was recorded 22 on as-built reverification form 1267.

Engineering solved this problem by 23

" accept as is," on 4/20/83.

24 Not only did this suffice to close out this item as far as CYGNA is 25 concerned, but they had to extend the following " independent" observation:

5-I "This documentation indicates that the Comanche Peak as-built verification 2

is working effectively."

3 The problem, however, still exists. Nothing was accomplished which 4

would resolve the situation which obviously escaped detection by CPSES and 5

CYGNA. The purpose of the large gap requirement in the unrestrained direction 6

is to allow the pipe to _ move without restraint due to thennal expansion 7

or seismic event.

Since seismic is either way or either direction, I will 8

only address this occurrence.

If the pipe is free to move (unrestrainad),

9 it will deflect first one way and then the other a number of times dependent 10 on the zero crossings for the specific event.

In this case, however, it 11 is restrained in one direction. This restraint will therefore react a force 12 in lieu of displacement.

In short, this is no longer a one-way restraint, l

13 but is now a two-way restraint. Additionally, since it is free in one un-14 restrained direction, the load is not simply the constraining effort in 16 one direction but now shock is present. Since this problem has been written 16 off, the magnitude of the shock load is unknowr., but still will contribute 17 to the stress in the supports which, as a result.of a lack 'of one element j

18 inducing stress, is also unknown.

The issuance of "use-as-is" does not necessarily eliminate problems, 19 l

20 but as shown above may merely be burying them.

21 A fourth area of concern involves the checkingsof calculations. See 22 Appendix H, " Pipe Support Check List," sheet 1 of'4, PS-14, support No.

23 SI-1-073-0700-S32R. The reviewer made the following coment at item 1, 24 Coments, No. 3:

"The design calculation includes a pipe bearing stress 25 calculation although this is not required for general pipe design." (Emphasis l

4

6-I added.) This reviewer would do well to look at the ASME Code,Section III, 2

Sub-Sections, NB, NC, and ND 3645 which states:

" Attachments" which require l

3 the design of external attachments to pipe in a way that will avoid a flattening l

4 of the pipe, excessive localized bending stresses or harmful gradients in 5

the pipe wall.

6 A fifth example of non-independent disposition of problems involves 7

support No.- SF-X-003-003-F43K, a snubber which passes close to the clamp

{

1 8

of another snubber, No. SF-X-007-014-F43K; see WD02-01, Appendix F, Observation 9

Record.

In this case, the minimum clearance between the snubber (extension) 10 and the clamp is 1/4". This is not during plant operation nor utilization 11 of the spent fuel pool; therefore, we must assune the pipes are at plant l

l 12 ambient.

l 13 While I lack sufficient information to pursue this problem, I find that 14 the maximum relative seismic movemer.t between these two points is only.0009 1.5 according to Texas Utilities.

I have, by calculation.on a number of snubbers 16 and struts, found the displacement of the hardware itself to be beyond thi:

17 value. For example, for a 2" diameter standard pipe 4' long and simply sup-18 ported at each end, subjected to a 1 G seismic load, horizontal and per-4 19 pendicular to the axis of the pipe, the seismic displacement would be Sw1 /384EI 20 where w =.304 lbs. per inch,1 = 48 inches, E = 29,000,000, and I =.666 in..

4 21 or 5 X.304 X 48 384EI =.0011 in., which is 20% more than the total dif-22 ferential indicated by Texas Utilities.

If the pipe were in a horizontal 23 plane, and were twice as long, and subjected to 1 G vertical, the deflection 24 would be.035 and 'the stress in the pipe would be 10% of the' allowable, and 25 this from dead load and seismic only. And this is without considering the fN****='-w****=*=

,MW*-a

]=

=_=]*]

__=e_g_=-_

-=~~=='=y

      • ---*-i-/m-

-==*=-m

-s:

ee-

=-we-

  • ==$r*-=

m---~^

. 1 pipe node poiat movement or the differential movement of two run pipes which 2

may be seismically out of phase. Also, I must point out that after years 3

of operational cycling, the node point will not maintain the as-constructed 4

loca tion.

5 Beyond this, it is amusing to note that the following note appears on 6

the page:

Texas Utilities has determined that the maximum relative move-7 ment at these two points are as follows:" This would hardly seem to be an i 8 independent assessment, when CYGNA finds a problem but Texas Utilities writes 9

it off.

10 Q:

What do you mean by "the section devoted to design criteria lacks il a number of criteria"?

2 A:

We must assume tnat the criteria was outlined prior to the review

3 and therefore the review team was unaware of the support configuration with 16 which they would be involved.

If this was the case, the criteria must contain 15 a sufficient check list to review whatever type of support exists and flag 16 the items to be checked.

In this case, the reviewer should be looking for 17 the following, which were not included in his check list except in such 18 broad terms that from the review it is not possible to decipher what features 9

were reviewed.

20 a.

Ins tabili ty; 21 b.

Approved hardware (with load data sheets);

22 c.

Prying action; 23 d.

Summation of torsional effects to nonnal stress; 24 e.

Local diaphram action; 25 f.

Worst-case, additive signs for load input;

.w, agw

.c

.a4-,w.,+n y av s

  • v'wv

'"w-==

. 1 g.

Massive hardware and structure included in calculations; 2

h.

Weld transition for tubes (Beta angle);

3 1.

Shear distribution for bolts in bearing; 4

j.

Loads induced into piping; 5

k.

Constraint to thermal growth of pipe; 6

1.

Minimum weld and single pass requirements; 7

m.

Thennal constraint of supports (wall-to-wall, etc.);

8 n.

A-307 bolts used in fricidon connections; 9

o.

Stress ratio based on sum of contributors; 10 p.

Web crippling; jj q.

Shear lag (wide flanges loaded on single flange);

12 r.

Flange rotation (wide flanges);

13 s.

Web bending (wide flanges, channels, etc.);

14 t.

Use of principal axis for unsemetrical bending; i

15 u.

Loading off shear center; 16 v.

Bending allowable reductions for unbraced length; 17 w.

Bending allowable reduction when compression ratio in bending 18 members exceeds stress ratio of.15; jg x.

Differential spring rates (double struts of unequal length 20 reacting single' load, for example);

21 y.

Friction or displacement equivalent load for all supports;-

l z.

Effective length of intennittent welds; l

22 23 aa. Support resisting. seismic movement or dead load of buildings; I

bb.

Check for loading induced by supports which must be picked l

24 25 up by other up or down stream supports'.

l

9-1 There are other features which require checking; however, this should 2

suffice to indicate the failure of the CYGNA check lists to adequately address i

3 the review as required.

4 Q:

What do you mean by "the document lacks the information required 5

for a proper assessment of its accuracy"?

6 A:

For example, among the items not included:

7 a.

The stress ratio; 8

b.

The configuration of the support; and 9

c.

The loads and deflection.

10 The report is written as if the infallibility of the reviewer was un-11 contested end only those observations made by the reviewer are open to question.

12 There is really no way for one reading the report to assess the value of 13 the exercise except to analyze the write-off procedures utilized by the 14 reviewer.

15 Q:

What do you mean bv "in fact the conclusions by CYGNA are the 16 opposite of those which should have been assessed"?

! 17 A:

Before getting into specifics, it is well to note two statements 18 made by CYGNA in Section 4 of their report.

First, on page 4-10, 4.3.2.

19

" Pipe Supports Review," last paragraph:

"In general the supports calculations 20 are well done." The second statement appears on 4-17 and 4-18 " Mechanical 21 Walkdown (Piping and Supports)":"The purpose of the walkdown was to verify 22 the as-built location of pertinent features of the piping system such as 23 valves, branch connections, elbows and supports and to verify the as-built t 24 condition of the supports."

(Emphasis added.)

25 "Except in the few places where any form of measurement (either accurate i

I s

4 l

)

1 or approximate) was not possible the-lodation of all piping elements was i

2 verified to be in conformarme with the relevant drawings." It is these two i

3 statements that I find I must challenge.

i

}

4 In reference to the first statement, the first paint of consequence 5

is to keep in mind that only 31 calculations were reviewed, and these as l,

l 6

q were stated above were among the simplest at CPSES.

7 Among those items noted by the reviewer in Appendix H that were written j

8 off are the following which also include drawing errors in addition to calcu-9 lational errors:

10 a.

PS-02 Super Hilti shown on drawing with 6 " embedment; required 11 embedment is 8-1/8";

12 b.

PS-03, enbednent length'for anchor bolt is shown on drawing as 13 3-1/2"; the require'd length is 5".

14 The above two were considered as drawing errors.

15 c.

PS-05, weld length is actually 9" but 6" was used in the calculation.

16 Strut allowable is 14,200 lbs.but calculations used allowable of 17 15,700 lbs. The actual load on the support is 7,974 lbs. Bolt 18 locations used were incorrect.

19 d.

PS-06, take out for hardware is 9"; 10" was used in calculation.

20 Anchor bolt allowable was reduced, althought no space violation 21 existed.

22 e.

PS-07, moment X should be 52,824 lbs.; in the calculation moment 23 X used was 28,858 lbs.

24 f.

PS-09, seismic movement was not considered in spring design.

c i

25 g.

PS-11, forces used to qualify welds were incorrect.

i 4

e

+

e

+

I h.

A ' PUS U-bolt was used instead'of a PUH U-bolt, but it was the 2

PUH allowable whic'h was used in the calculation.

3 The res ' ewer rechecked against the PUS allowable. The load on 4

the bolt was 3915 lbs. and the allowable (per the reviewer) is 5

3,620 X 1.3 = 4706 lbs. (In reference to the stiffness importance, 6

if the load on this support increases by less than 25%, the allowable 7

for the U-bolt is exceeded. By Ed.)

8 1.

PS-10, the pipe displacement supplied to support design was shown 9

to be.395 inches, whereas it should have been +.395 inches.

10 j.

PS-25, stiffener ignored in base plate calculation (reviewer states 11 that this is 0.K. because it is conservative).

12 This caveat by the reviewer may or may not be true, but in any 13 event, the reviewer obviously did not check the problem correctly.

14 That is, the stiffener may be inadequate; it has not been qualified.

15 Base plate analyzed by FUB II base plate calculator program with 16 load centered on plate but actually the load is eccentric by one 17 inch..

18 k.

PS-30, SA193-B7 rods were used to replace normal Hilti bolts 19 (bolt naterial made of SA4140 steel similar td the situation 20 with A307 bolts made of SA36 steel).

l 21 Also, four calculations stated that " loads used were from a previous 22 run which were higher than the new as-built loads." From this, one cannot 23 tell if. the calculation was checked to the loads used or written.off because 24 the new loads are l'ower.

25 In any event, checking the above citations, it does not take much of i

26 a brain to note that of the 31 drcwings involved, at least two drawings 'had l

27 errors. This was about 7% of the drawings. Of the 31 calculations, at least I

. 1 8 had one error (one had three errors). This is about 25% of the package.

t l

2 Six of these errors, or about 20% of the package, were non-conservative errors.

i 3

If one out of 5 calculations contains a non-conservative error, the renainder 4

of the plant is in doubt. Beyond this, we might recall that the actual stiff-5 ness and seismic acceleration of support ' steel was neglected.

From the preceding, 6

therefore, I am hard put to understand the first quotation "well done."

7 In reference to the walk-down as-built assessment check list, the information 8

to be gleaned from the limited documentation is equally interesting.

9 To start with, at Section 4.0, page 4-19, first item (in reference to 10 the walkdown effort) states that four snubberr have been inverted 1800 but 11 does not state whether an investigation had been made to determine if boots 12 were required (for the condition before or after). Also, there is no state-13 ment which indicates if the mechanism has been converted into proximity 14 with a hot line or the other way around. All that is mentioned is that 15 CP-CPM 9.17 dated 5/31/83 permits this inversion without including the 16 document. Of more interest is the numbers game introduced in this section 17 and to determine the numbers of actual supports which were reviewed per 18 the CYGNA criteria " verify the as-built condition of the supports." We 19 must first eliminate those supports which were not verified other than visually 20 (which means that someone saw the support) or ground projection (which means 21 much the same as visual observation from a substantial distance). These sup-22 ports were obviously out of range of a 12,14,, or 16 foot ladder or even

'23 an extension ladder; therefore, visual observation has no meaning.

Further, 24 I note that a transit has not been mentiored, although it would have proved 25 rather useful. The fact that some dimensions were taken on seven supports

13 -

1 also means that some dimensions were' not' taken. Therefore, of the 91 supports 2

that made up the review, only 48 were actually reviewed.

Of this number, 3

4 contained drawing errors; they were WD-01 on page 9 of 11, branch dimension 4

is wrong; WD-02, page 4 of 10, drawing incorrectly shows square tube, filler 5

material shows a round tube, also this drawing has an incorrect centerline 6

dimension; WD-02, page 8 of 10, drawing shows wrong pipe centerline elevation; 7

WD-03, page 9 of 12, sway strut length is incorrect.

From this we find that 8

about 1/12, or about 8%, of the drawings have errors.

In summation, of the 9

31 calculations and 48 reviewed supports (79 total supports),12 have drawing 10 errors and 8 have calculation errors.

In addition, two others have post-11 construction errors'(1) clearance between two different supports and (1) 12 no clearance in the unrestrained direction.

Thus, for 79 supports, there 13 are 22 discrepancies, or 25% of the supports have an error. And this is 14 for a system which was to showcase the iterative process and has been sub-15 jected to more checks than Chase Manhattan Bank.

If I were reviewing any 16 system and found that 25% of it contained errors, I would have to say that 17 if this system were even remotely indicative of the remainder of the plant, 18 then the plant is in trouble. There is no way that I'could write off the 19 rest of the plant as being safe based on the findings as they exist in the 20 CYGNA Report. The fact that CYGNA could justify some of the errors on the 21 basis that the stress ratio was low enough to absorb the error is without 22 merit except on a case-by-case basis. Since it is probable that on another 23 support the stress ratio may be too close to the allowable limit to absorb 24 any increase in stress, whether such stress results from an error or an 25 increase in load due to use of the actual stiffness factor which is less m

y 4<4-

+--,--wem-4

,-w-

=w-ww

=,, -m w me

,e-.

%. w 9 g y

14 -

1 than the generic stiffness.

2 The following should point out the minor nature of problems which can 3

result in major failures:

4 1.

The steam generator failure at Beaver Valley nuclear power station 5

resulted from a failure of the supports which were non-conservatively 6

designed for the original smaller generator.

7 2.

The failure of a 3/4" air valve resulted in the chain of events 8

that we now call the accident at TMI.

9 3.

The failure of a zirconium deflector resulted in the accident 10 a t Fermi 1.

11 4.

Browns Ferry suffered major damage and was fast approaching catastrophic 12 proportions as the result of a workman's candle igniting flammable 13 materials.

14 We have enough problems with the unforeseen without evading the fore-15 seeable.

It is not in the interest of public safety to await the onslaught 16 of a seismic event to highlight the errors in engineering, nor is the fact 17 that seismic loading is incorporated into the analysis enough to assume 18 that it will act as a safety factor for errors during the period of non-19 seismic activity, as this would then reduce the probability of accident 20 to the cycle of seismic activity. Consider: with the existence of non-21 conservative error in at lera. 20% of the sample ' reviewed, the probability 22 of the same percentage of non-conservative error in the 40,000 supports 23 for CPSES means that 7,742 random supports are at risk.. And no one can 24 state offhand which of these can be dismissed as being capable of absorbing 25 an unknown error.

I s-

--.=

~.

i 1

A final point to be made is in reference to the actual stiffness factors 2

of the supports. The generic stiffness study shows that in the particular

)

3 case studied, the loads increased by up to 200%. Compare this with the comment l

1 4

at 2. of check list PS-10, Appendix H:

5

" Bolts noted as unacceptable on the calculations.

The designer waited for as-built loads for a final determination of acceptability as part 6

of the as-built program. The final load did decrease to acceptable l evels. "

7 8

If changes in loads will qualify these supports which fail to meet the 9

stress criteria, changes can also act to disqualify a previously qualified 10 support.

11 Q:

Do you believe you found all of the items which concern you in j

12 regards to the CYGNA review?

)

13 A:

No, I-do not, because my critique is based on the contents of the 14 commentary supplied by CYGNA, and this is only in areas where they had made i

15 an observation.. If we had access to the'itens which did not trigger an 16 observation, it is possible that the number of conflicts would have been 17 higher.

To carry this thought'one step further, one has only to examine 18 the types of supports reviewed versus the requirements of ASME Section III 19 to determine if there is a doubt that all factors were covered by the CYGNA 20 reviev.

21~

Subsection NF 4000 contains several interesting items which were 22 generically neglected at CPSES. -For example, the Applicant and Region IV 23 went to great lengths to prove that their support base' plate joints are 24 all of the bearing type.(no friction joints).

In this case, there are two

~

25 areas which I noted when I worked at CPSES whic". I did not find mentioned

~

  • t r

-p W

w v

vv e-rw e

f v

W 7

-7

.. 1 in the CYGNA review, either as a criteria to be checked or mentioned in their 2

observa tions. These items are:

The requirement to exclude bolt threads i

3 from the load bearing shank of bolts loaded in shear (generically violated 4

in the NPSI Richmond / tube support configurations, in which case the full 5

length of the A307 bolt is threaded). This violation is covered by NF 4722(b).

6 A second area involves the fact that locking devices for all threaded fasteners 7

must be provided, and this is covered by NF 4725.

From my observations of 8

the base plates at CPSES, I find it hard to believe that CYGNA found no 9

violations of the type mentioned above during their walk-down.

10 Q:

What causes you to be so certain that the CYGNA report is not 11 independent beyond the criticism you have with their observations and the 12 manner in which they closed out the problems?

13 A:

Independence is not achieved when one must proceed from a posture 14 of self-defense, nor is independence achieved by having such an open mind 15 that your brains have fallen out. This obviously is the position that CYGNA 16 or any other organization or individual who depends on the nuclear industry 17 finds itself in an effort to ensure the acquisition of future contracts 18 or employment (such contracts as CYGNA now enjoys at the Seabrook nuclear 19 facility supplying support engineers on a contract basis). As the~ Board 20 is well aware, due to the number of affidavits filed charging retaliation 21 for making waves in the industry, it is obvious that one must exercise caution 22 in the critique of a member of the nuclear family. As is well known, it 23 is the bottom line which counts.

24

' Q:

Do you have anything further to say?

25 A:

No, not at this particular time...

.s.