i NATIONAL BUREAU OF STANDARDS REACTOR Docket # 50-184 Facility License No. TR-5 OPERATIONS REPORT I                                               - - - #35 - - -
i NATIONAL BUREAU OF STANDARDS REACTOR Docket # 50-184 Facility License No. TR-5 OPERATIONS REPORT I
January, 1983 - June, 1983 This report contains a summary of activities connected with the operations of the NBSR. It is submitted in fulfillment of section 7.8d of the NBSR Technical Specifications and covers the period from January 1, I             1983 to June 30, 1983.
- - - #35 - - -
January, 1983 - June, 1983 This report contains a summary of activities connected with the operations of the NBSR. It is submitted in fulfillment of section 7.8d of the NBSR Technical Specifications and covers the period from January 1, I
1983 to June 30, 1983.
Section numbers in this report (such as, 7.8d(l)) correspond to those used in the Technical Specifications, i
Section numbers in this report (such as, 7.8d(l)) correspond to those used in the Technical Specifications, i
September *. 1983
September *. 1983 h, h'%
                                                                            %      h, h'%         k i
k ROBERT S. CARTER i
ROBERT S. CARTER Chief, Reactor Radiation Division t
Chief, Reactor Radiation Division t
I 8309290170 830908 l         PDR ADOCK 05000184 R                       PDR
I 8309290170 830908 l
[            =     -
PDR ADOCK 05000184
[
R PDR
=


I i
I i
TABLE OF CONTENTS 1
TABLE OF CONTENTS 1
: 7. 8d (1)               Summary of Plant Operations 7.8d(2)                 Unscheduled Shutdowns
: 7. 8d (1)
: 7. 8d (3)               Tabulation of Major Items of Plant Maintenance 7.8d(4)                 Tabulation of Major Changes in the Facility and Procedures, and the Test and Experiments, Carried Out Without Prior Approval i
Summary of Plant Operations 7.8d(2)
l by the U. S. AEC (10 CFR 50.59) 7.8d(5)                 Summary of Radioactive Material Released and Results of Environ-mental Surveys Performed
Unscheduled Shutdowns
;                  7.8d(6)               Summary of Significant Exposures Received by Facility Personnel 2
: 7. 8d (3)
Tabulation of Major Items of Plant Maintenance 7.8d(4)
Tabulation of Major Changes in the Facility and Procedures, and the Test and Experiments, Carried Out Without Prior Approval i
l by the U. S. AEC (10 CFR 50.59) 7.8d(5)
Summary of Radioactive Material Released and Results of Environ-mental Surveys Performed 7.8d(6)
Summary of Significant Exposures Received by Facility Personnel 2
and Visitors I
and Visitors I
c
c
                                                                                                                                                                                                                      \
\\
w T
w I
I                                                                                                                                                                                         *
T I
                                                                                                                                                                                            %                                      I
/t n
                                                                                                                                                          *                          /t                                     n f                                                                                                                                                 .                                                                                  :-
f 4
4 s
s f
f            7 T)i '..
7 T)i '..
                                                                                                                                                                        *t
'~
                                                                                                              '~
*t
                                                                                                                                                                                  %=.                           g                               gi s                                                                            ,                            ,
%=.
                            .                                                                                                                                                                  j,                                              ,,
g gi j,
                                                                                                      %N                                                                             , $
s
Y, f                                 lI I                                                                                                                                                                             *
%N Y,
+                                                                                                                                                                     - ..    :    .                                          ,.,
f lI I
                                                                                                                                                                                                            " Y p'yq s
+
                                >              \
" Y t. <
                                                                                                                                                                                                          ,1 .)j         ,
-(
                                                                                                                                                                                                                                -(
p'yq
                                                                                                -                            t . <                                                                      g                               \
,1
t
.)j s
                                                                                                                                >; y                                                                                                         )
\\
a                               ,.e                                                                                                             ,
g
7                         .-;                                                                                  ;,
\\
>; y
)
t a
,. e 7
i A
i A
                                                                                                                                            \
\\
e
e
                                                                    .\                  .';'                                      [                    '
^
                                                                                                                                                              ' k.G
' k.G
                                                          \
.\\
                                                                                        ,                                                                          ^
[
                                                                                                                                                                                                  .'                        's.g1               '/
's.g1
4                             .            </,
'/
m                                        ,y
\\
* e      f;                                            ;, (
4
                                                                                                                            ~ ~
</,
                                                                                                                                            .4                                                           i'
f;
                                                                                                                                        ,y                                                                   j.
,y
                                                                                                    ._~                             .,
;, (
                                                                                                                                                                                                                    -                            c.
m e
k                                                                                       3
~ ~
                                                                                                                                                                                                                    )                          g
.4 i'
                                                                                                                                          , f                                                           a f --
j.
?              ,                                                                                                                            '' -                                              i'f ''
,y
i                                                                                                                                        '                                                                '                " m if .
._~
w l^
c.
                                                                                                                                                ,                                s ._ '                                             lp i l_                        ' .a,
k 3
                                                                                      *                    ~u             e                       s g
?
uJ
, f i'f ''
                                                                                                                                                                                                                            .g
a
    - . . . _ .      ~. , , . .           .
)
                                              , , . _ . _ _ , . . .      , _ ,   . ,          a_        __ _ _ ,        , _,,, _.                                 , _                          _, ,j.                                        _
g f --
" m if.
i s._ '
w lp i l^
'.a
~u e
s uJ l_
~.,,..
a g
_,,j.
.g


_1_
_1_
: 7. 8d (1)   Summary of Plant Operations During the period January 1, 1983 through June 30, 1983 the reactor was critical for 3695 hours and the energy generated was 36305 MWH. All reactor operations were routine and uneventful.
: 7. 8d (1)
Summary of Plant Operations During the period January 1, 1983 through June 30, 1983 the reactor was critical for 3695 hours and the energy generated was 36305 MWH.
All reactor operations were routine and uneventful.
A program for modernization of the Reactor Console is continuing.
A program for modernization of the Reactor Console is continuing.
: 7. 8d (2)   Unscheduled Shutdowns There were two unscheduled shutdowns during this reporting period.
: 7. 8d (2)
1-13-83   Manual scram when operator struck the Scram button while opening a recorder door to mark chart. Returned to power immediately.
Unscheduled Shutdowns There were two unscheduled shutdowns during this reporting period.
3-23-83   Low flow Scram during commercial power interruption.
1-13-83 Manual scram when operator struck the Scram button while opening a recorder door to mark chart. Returned to power immediately.
3-23-83 Low flow Scram during commercial power interruption.
Returned to power immediately.
Returned to power immediately.
7.8d(3)     Tabulation of Major Items of Plant Maintenance
7.8d(3)
: 1. Replaced Reg Rod with spare unit.
Tabulation of Major Items of Plant Maintenance 1.
: 2. Reset #1 Shim Arm clutch gap.
Replaced Reg Rod with spare unit.
: 3. Replaced drive gear in #3 Shim Arm Indication Unit.
2.
: 4. Installed new bearings in #1 primary pump motor.
Reset #1 Shim Arm clutch gap.
: 5. Replaced MCP Motor #4 with MCP Motor #1.
3.
: 6. Changed diaphragm (twice) on DWV-184.
Replaced drive gear in #3 Shim Arm Indication Unit.
: 7. Replaced orfice plate low predsure sensing line of FIA-5 (purification flow instrument).
4.
I             8. Installed vacuum system and filter on fuel cutting saw.
Installed new bearings in #1 primary pump motor.
: 9. Repalced piping between COV-1 and COV-2.
5.
: 10. Removed KWV-13 Air Operator Valve (replaced in July 83) .
Replaced MCP Motor #4 with MCP Motor #1.
6.
Changed diaphragm (twice) on DWV-184.
7.
Replaced orfice plate low predsure sensing line of FIA-5 (purification flow instrument).
I 8.
Installed vacuum system and filter on fuel cutting saw.
9.
Repalced piping between COV-1 and COV-2.
: 10. Removed KWV-13 Air Operator Valve (replaced in July 83).
: 11. Changed resin in Thermal Shield #1 I.X. and #2 I.X.
: 11. Changed resin in Thermal Shield #1 I.X. and #2 I.X.
l
l
: 12. Changed Storage Pool I.X. resin, prefilters (twice) and after filters.
 
, 12. Changed Storage Pool I.X. resin, prefilters (twice) and after filters.
: 13. Adjusted #2 Cooling Tower fan motor vibration switch.
: 13. Adjusted #2 Cooling Tower fan motor vibration switch.
: 14. Replaced bearings in EF-3.
: 14. Replaced bearings in EF-3.
: 15. Replaced batteries on Diesel Generator   "A".
: 15. Replaced batteries on Diesel Generator "A".
: 16. Replaced time delay relay on #4 Secondary Pump.
: 16. Replaced time delay relay on #4 Secondary Pump.
: 17. Replaced Amplifier & recalib. TIA-40A.
: 17. Replaced Amplifier & recalib. TIA-40A.
Line 116: Line 153:
: 20. Replaced Square Root extractor on BTUR system.
: 20. Replaced Square Root extractor on BTUR system.
: 21. Repaired Amplifier on Ucrmal Air Monitor Channel.
: 21. Repaired Amplifier on Ucrmal Air Monitor Channel.
: 22. Re'=librated Heat Exchanger outlet temperature channel (TIA-4) .
: 22. Re'=librated Heat Exchanger outlet temperature channel (TIA-4).
: 23. Repaired Storage Pool Cooling Water Flow Transmitter (FIA-13) &
: 23. Repaired Storage Pool Cooling Water Flow Transmitter (FIA-13)
Calibrated Channel.
Calibrated Channel.
: 24. Calibrated Storage Pool Ion Exchanger Flow Channel (FIA-14) .
: 24. Calibrated Storage Pool Ion Exchanger Flow Channel (FIA-14).
: 25. Replaced Amplifier to Console Readout (RM3-5).
: 25. Replaced Amplifier to Console Readout (RM3-5).
: 26. Replaced Chart Drive Motor on AT recorder (TR-1).
: 26. Replaced Chart Drive Motor on AT recorder (TR-1).
Line 125: Line 162:
l
l
: 28. Engineering Changes during this period:
: 28. Engineering Changes during this period:
ECN 268     Install Transpac Pwr. Sup. to NC-2 ECN 277     Replaced the BTUR and Outlet flow recorders (2 of the 3 recorders on ECN) i
ECN 268 Install Transpac Pwr. Sup. to NC-2 ECN 277 Replaced the BTUR and Outlet flow recorders (2 of the 3 recorders on ECN) i


u i
u i '
t 4
t 4
l
: 29. Instrument Procedures performed:
: 29. Instrument Procedures performed:
l                                Secondary Coolant Radiation Monitor RM3-1 NC-7             Nuclear Power Range Channel NC-8             Nuclear Power Range Channel RM1-1 thru 10   Area Monitors RM3-4           Irradiated Air Radiation Monitor NC-4             Nuclear Intermediate Range Channel RM4-1           Stack Air Radiation Monitor
RM3-1 Secondary Coolant Radiation Monitor NC-7 Nuclear Power Range Channel NC-8 Nuclear Power Range Channel RM1-1 thru 10 Area Monitors RM3-4 Irradiated Air Radiation Monitor NC-4 Nuclear Intermediate Range Channel RM4-1 Stack Air Radiation Monitor FRC-3 Rx Outer Plenum Flow FRC-4 Rx Inner Plenum Flow TIA-40A Rx Delta Temperature SPS-150 Emergency Standby Fan Controller 7.8d(4)
'                FRC-3           Rx Outer Plenum Flow FRC-4           Rx Inner Plenum Flow TIA-40A         Rx Delta Temperature SPS-150         Emergency Standby Fan Controller 7.8d(4)   Tabulation of Major Changes in the Facility and Procedures, I           and the Test and Experiments, Carried Out Without Prior Approval by the U. S. AEC (lb ZFR 50.59) .
Tabulation of Major Changes in the Facility and Procedures, I
and the Test and Experiments, Carried Out Without Prior Approval by the U. S. AEC (lb ZFR 50.59).
None this reporting period.
None this reporting period.
: 7. 8d (5) Summary of Radioactive Material Released and Results of i           Environmental Surveys Performed.
: 7. 8d (5)
Summary of Radioactive Material Released and Results of i
Environmental Surveys Performed.
Two hundred and ninety-five (295) curies of tritium and 267 curies of Argon-41 were released as gaseous waste, while 1.4 curies of tritium and 25 millicuries of other B-y emitters were released into the sanitary sewer.
Two hundred and ninety-five (295) curies of tritium and 267 curies of Argon-41 were released as gaseous waste, while 1.4 curies of tritium and 25 millicuries of other B-y emitters were released into the sanitary sewer.
Environmental samples of the streams, wells, vegetation and/or
Environmental samples of the streams, wells, vegetation and/or soil, and air showed no significant cha'nges.
!            soil, and air showed no significant cha'nges.
7.8d(6)
7.8d(6)   Summary of Significant Exposures received by Facility Personnel i
Summary of Significant Exposures received by Facility Personnel i
and Visitors.
and Visitors.
: 1. No significant exposures were received by any visitor.
1.
: 2. One facility (non-operations) personnel received a significant exposure during this period of 1.70 rem.
No significant exposures were received by any visitor.
        -                          _    _}}
2.
One facility (non-operations) personnel received a significant exposure during this period of 1.70 rem.
_}}

Latest revision as of 09:09, 14 December 2024

Operations Rept,Jan-June 1983
ML20080K478
Person / Time
Site: National Bureau of Standards Reactor
Issue date: 09/08/1983
From: Rozier Carter
NATIONAL INSTITUTE OF STANDARDS & TECHNOLOGY (FORMERL
To: Thomas C
Office of Nuclear Reactor Regulation
References
NUDOCS 8309290170
Download: ML20080K478 (6)


Text

.

i NATIONAL BUREAU OF STANDARDS REACTOR Docket # 50-184 Facility License No. TR-5 OPERATIONS REPORT I

- - - #35 - - -

January, 1983 - June, 1983 This report contains a summary of activities connected with the operations of the NBSR. It is submitted in fulfillment of section 7.8d of the NBSR Technical Specifications and covers the period from January 1, I

1983 to June 30, 1983.

Section numbers in this report (such as, 7.8d(l)) correspond to those used in the Technical Specifications, i

September *. 1983 h, h'%

k ROBERT S. CARTER i

Chief, Reactor Radiation Division t

I 8309290170 830908 l

PDR ADOCK 05000184

[

R PDR

=

I i

TABLE OF CONTENTS 1

7. 8d (1)

Summary of Plant Operations 7.8d(2)

Unscheduled Shutdowns

7. 8d (3)

Tabulation of Major Items of Plant Maintenance 7.8d(4)

Tabulation of Major Changes in the Facility and Procedures, and the Test and Experiments, Carried Out Without Prior Approval i

l by the U. S. AEC (10 CFR 50.59) 7.8d(5)

Summary of Radioactive Material Released and Results of Environ-mental Surveys Performed 7.8d(6)

Summary of Significant Exposures Received by Facility Personnel 2

and Visitors I

c

\\

w I

T I

/t n

f 4

s f

7 T)i '..

'~

  • t

%=.

g gi j,

s

%N Y,

f lI I

+

" Y t. <

-(

p'yq

,1

.)j s

\\

g

\\

>; y

)

t a

,. e 7

i A

\\

e

^

' k.G

.\\

[

's.g1

'/

\\

4

</,

f;

,y

, (

m e

~ ~

.4 i'

j.

,y

._~

c.

k 3

?

, f i'f

a

)

g f --

" m if.

i s._ '

w lp i l^

'.a

~u e

s uJ l_

~.,,..

a g

_,,j.

.g

_1_

7. 8d (1)

Summary of Plant Operations During the period January 1, 1983 through June 30, 1983 the reactor was critical for 3695 hours0.0428 days <br />1.026 hours <br />0.00611 weeks <br />0.00141 months <br /> and the energy generated was 36305 MWH.

All reactor operations were routine and uneventful.

A program for modernization of the Reactor Console is continuing.

7. 8d (2)

Unscheduled Shutdowns There were two unscheduled shutdowns during this reporting period.

1-13-83 Manual scram when operator struck the Scram button while opening a recorder door to mark chart. Returned to power immediately.

3-23-83 Low flow Scram during commercial power interruption.

Returned to power immediately.

7.8d(3)

Tabulation of Major Items of Plant Maintenance 1.

Replaced Reg Rod with spare unit.

2.

Reset #1 Shim Arm clutch gap.

3.

Replaced drive gear in #3 Shim Arm Indication Unit.

4.

Installed new bearings in #1 primary pump motor.

5.

Replaced MCP Motor #4 with MCP Motor #1.

6.

Changed diaphragm (twice) on DWV-184.

7.

Replaced orfice plate low predsure sensing line of FIA-5 (purification flow instrument).

I 8.

Installed vacuum system and filter on fuel cutting saw.

9.

Repalced piping between COV-1 and COV-2.

10. Removed KWV-13 Air Operator Valve (replaced in July 83).
11. Changed resin in Thermal Shield #1 I.X. and #2 I.X.

l

, 12. Changed Storage Pool I.X. resin, prefilters (twice) and after filters.

13. Adjusted #2 Cooling Tower fan motor vibration switch.
14. Replaced bearings in EF-3.
15. Replaced batteries on Diesel Generator "A".
16. Replaced time delay relay on #4 Secondary Pump.
17. Replaced Amplifier & recalib. TIA-40A.
18. Replaced Amplifier in Ph recorder
19. Reseated shunt pin connection on NC-3 and 4 to correct remote console indication.
20. Replaced Square Root extractor on BTUR system.
21. Repaired Amplifier on Ucrmal Air Monitor Channel.
22. Re'=librated Heat Exchanger outlet temperature channel (TIA-4).
23. Repaired Storage Pool Cooling Water Flow Transmitter (FIA-13)

Calibrated Channel.

24. Calibrated Storage Pool Ion Exchanger Flow Channel (FIA-14).
25. Replaced Amplifier to Console Readout (RM3-5).
26. Replaced Chart Drive Motor on AT recorder (TR-1).
27. Replaced wire nut connection with soldered connections on Cooling Tower controls (LIC-9).

l

28. Engineering Changes during this period:

ECN 268 Install Transpac Pwr. Sup. to NC-2 ECN 277 Replaced the BTUR and Outlet flow recorders (2 of the 3 recorders on ECN) i

u i '

t 4

l

29. Instrument Procedures performed:

RM3-1 Secondary Coolant Radiation Monitor NC-7 Nuclear Power Range Channel NC-8 Nuclear Power Range Channel RM1-1 thru 10 Area Monitors RM3-4 Irradiated Air Radiation Monitor NC-4 Nuclear Intermediate Range Channel RM4-1 Stack Air Radiation Monitor FRC-3 Rx Outer Plenum Flow FRC-4 Rx Inner Plenum Flow TIA-40A Rx Delta Temperature SPS-150 Emergency Standby Fan Controller 7.8d(4)

Tabulation of Major Changes in the Facility and Procedures, I

and the Test and Experiments, Carried Out Without Prior Approval by the U. S. AEC (lb ZFR 50.59).

None this reporting period.

7. 8d (5)

Summary of Radioactive Material Released and Results of i

Environmental Surveys Performed.

Two hundred and ninety-five (295) curies of tritium and 267 curies of Argon-41 were released as gaseous waste, while 1.4 curies of tritium and 25 millicuries of other B-y emitters were released into the sanitary sewer.

Environmental samples of the streams, wells, vegetation and/or soil, and air showed no significant cha'nges.

7.8d(6)

Summary of Significant Exposures received by Facility Personnel i

and Visitors.

1.

No significant exposures were received by any visitor.

2.

One facility (non-operations) personnel received a significant exposure during this period of 1.70 rem.

_