i NATIONAL BUREAU OF STANDARDS REACTOR Docket # 50-184 Facility License No. TR-5 OPERATIONS REPORT I | i NATIONAL BUREAU OF STANDARDS REACTOR Docket # 50-184 Facility License No. TR-5 OPERATIONS REPORT I | ||
January, 1983 - June, 1983 This report contains a summary of activities connected with the operations of the NBSR. It is submitted in fulfillment of section 7.8d of the NBSR Technical Specifications and covers the period from January 1, I | - - - #35 - - - | ||
January, 1983 - June, 1983 This report contains a summary of activities connected with the operations of the NBSR. It is submitted in fulfillment of section 7.8d of the NBSR Technical Specifications and covers the period from January 1, I | |||
1983 to June 30, 1983. | |||
Section numbers in this report (such as, 7.8d(l)) correspond to those used in the Technical Specifications, i | Section numbers in this report (such as, 7.8d(l)) correspond to those used in the Technical Specifications, i | ||
September *. 1983 | September *. 1983 h, h'% | ||
k ROBERT S. CARTER i | |||
ROBERT S. CARTER Chief, Reactor Radiation Division t | Chief, Reactor Radiation Division t | ||
I 8309290170 830908 l | I 8309290170 830908 l | ||
PDR ADOCK 05000184 | |||
[ | |||
R PDR | |||
= | |||
I i | I i | ||
TABLE OF CONTENTS 1 | TABLE OF CONTENTS 1 | ||
: 7. 8d (1) | : 7. 8d (1) | ||
: 7. 8d (3) | Summary of Plant Operations 7.8d(2) | ||
l by the U. S. AEC (10 CFR 50.59) 7.8d(5) | Unscheduled Shutdowns | ||
: 7. 8d (3) | |||
Tabulation of Major Items of Plant Maintenance 7.8d(4) | |||
Tabulation of Major Changes in the Facility and Procedures, and the Test and Experiments, Carried Out Without Prior Approval i | |||
l by the U. S. AEC (10 CFR 50.59) 7.8d(5) | |||
Summary of Radioactive Material Released and Results of Environ-mental Surveys Performed 7.8d(6) | |||
Summary of Significant Exposures Received by Facility Personnel 2 | |||
and Visitors I | and Visitors I | ||
c | c | ||
\\ | |||
w | w I | ||
I | T I | ||
/t n | |||
f 4 | |||
s f | |||
7 T)i '.. | |||
'~ | |||
*t | |||
%=. | |||
g gi j, | |||
s | |||
%N Y, | |||
+ | f lI I | ||
+ | |||
" Y t. < | |||
-( | |||
p'yq | |||
,1 | |||
.)j s | |||
\\ | |||
a | g | ||
7 | \\ | ||
>; y | |||
) | |||
t a | |||
,. e 7 | |||
i A | i A | ||
\\ | |||
e | e | ||
^ | |||
' k.G | |||
.\\ | |||
[ | |||
's.g1 | |||
4 | '/ | ||
\\ | |||
4 | |||
</, | |||
f; | |||
,y | |||
;, ( | |||
m e | |||
k | ~ ~ | ||
.4 i' | |||
j. | |||
,y | |||
._~ | |||
c. | |||
k 3 | |||
? | |||
uJ | , f i'f '' | ||
a | |||
) | |||
g f -- | |||
" m if. | |||
i s._ ' | |||
w lp i l^ | |||
'.a | |||
~u e | |||
s uJ l_ | |||
~.,,.. | |||
a g | |||
_,,j. | |||
.g | |||
_1_ | _1_ | ||
: 7. 8d (1) | : 7. 8d (1) | ||
Summary of Plant Operations During the period January 1, 1983 through June 30, 1983 the reactor was critical for 3695 hours and the energy generated was 36305 MWH. | |||
All reactor operations were routine and uneventful. | |||
A program for modernization of the Reactor Console is continuing. | A program for modernization of the Reactor Console is continuing. | ||
: 7. 8d (2) | : 7. 8d (2) | ||
1-13-83 | Unscheduled Shutdowns There were two unscheduled shutdowns during this reporting period. | ||
3-23-83 | 1-13-83 Manual scram when operator struck the Scram button while opening a recorder door to mark chart. Returned to power immediately. | ||
3-23-83 Low flow Scram during commercial power interruption. | |||
Returned to power immediately. | Returned to power immediately. | ||
7.8d(3) | 7.8d(3) | ||
Tabulation of Major Items of Plant Maintenance 1. | |||
Replaced Reg Rod with spare unit. | |||
2. | |||
Reset #1 Shim Arm clutch gap. | |||
3. | |||
Replaced drive gear in #3 Shim Arm Indication Unit. | |||
4. | |||
I | Installed new bearings in #1 primary pump motor. | ||
5. | |||
: 10. Removed KWV-13 Air Operator Valve (replaced in July 83) . | Replaced MCP Motor #4 with MCP Motor #1. | ||
6. | |||
Changed diaphragm (twice) on DWV-184. | |||
7. | |||
Replaced orfice plate low predsure sensing line of FIA-5 (purification flow instrument). | |||
I 8. | |||
Installed vacuum system and filter on fuel cutting saw. | |||
9. | |||
Repalced piping between COV-1 and COV-2. | |||
: 10. Removed KWV-13 Air Operator Valve (replaced in July 83). | |||
: 11. Changed resin in Thermal Shield #1 I.X. and #2 I.X. | : 11. Changed resin in Thermal Shield #1 I.X. and #2 I.X. | ||
l | l | ||
, 12. Changed Storage Pool I.X. resin, prefilters (twice) and after filters. | |||
: 13. Adjusted #2 Cooling Tower fan motor vibration switch. | : 13. Adjusted #2 Cooling Tower fan motor vibration switch. | ||
: 14. Replaced bearings in EF-3. | : 14. Replaced bearings in EF-3. | ||
: 15. Replaced batteries on Diesel Generator | : 15. Replaced batteries on Diesel Generator "A". | ||
: 16. Replaced time delay relay on #4 Secondary Pump. | : 16. Replaced time delay relay on #4 Secondary Pump. | ||
: 17. Replaced Amplifier & recalib. TIA-40A. | : 17. Replaced Amplifier & recalib. TIA-40A. | ||
| Line 116: | Line 153: | ||
: 20. Replaced Square Root extractor on BTUR system. | : 20. Replaced Square Root extractor on BTUR system. | ||
: 21. Repaired Amplifier on Ucrmal Air Monitor Channel. | : 21. Repaired Amplifier on Ucrmal Air Monitor Channel. | ||
: 22. Re'=librated Heat Exchanger outlet temperature channel (TIA-4) . | : 22. Re'=librated Heat Exchanger outlet temperature channel (TIA-4). | ||
: 23. Repaired Storage Pool Cooling Water Flow Transmitter (FIA-13) | : 23. Repaired Storage Pool Cooling Water Flow Transmitter (FIA-13) | ||
Calibrated Channel. | Calibrated Channel. | ||
: 24. Calibrated Storage Pool Ion Exchanger Flow Channel (FIA-14) . | : 24. Calibrated Storage Pool Ion Exchanger Flow Channel (FIA-14). | ||
: 25. Replaced Amplifier to Console Readout (RM3-5). | : 25. Replaced Amplifier to Console Readout (RM3-5). | ||
: 26. Replaced Chart Drive Motor on AT recorder (TR-1). | : 26. Replaced Chart Drive Motor on AT recorder (TR-1). | ||
| Line 125: | Line 162: | ||
l | l | ||
: 28. Engineering Changes during this period: | : 28. Engineering Changes during this period: | ||
ECN 268 | ECN 268 Install Transpac Pwr. Sup. to NC-2 ECN 277 Replaced the BTUR and Outlet flow recorders (2 of the 3 recorders on ECN) i | ||
u i | u i ' | ||
t 4 | t 4 | ||
l | |||
: 29. Instrument Procedures performed: | : 29. Instrument Procedures performed: | ||
RM3-1 Secondary Coolant Radiation Monitor NC-7 Nuclear Power Range Channel NC-8 Nuclear Power Range Channel RM1-1 thru 10 Area Monitors RM3-4 Irradiated Air Radiation Monitor NC-4 Nuclear Intermediate Range Channel RM4-1 Stack Air Radiation Monitor FRC-3 Rx Outer Plenum Flow FRC-4 Rx Inner Plenum Flow TIA-40A Rx Delta Temperature SPS-150 Emergency Standby Fan Controller 7.8d(4) | |||
Tabulation of Major Changes in the Facility and Procedures, I | |||
and the Test and Experiments, Carried Out Without Prior Approval by the U. S. AEC (lb ZFR 50.59). | |||
None this reporting period. | None this reporting period. | ||
: 7. 8d (5) Summary of Radioactive Material Released and Results of i | : 7. 8d (5) | ||
Summary of Radioactive Material Released and Results of i | |||
Environmental Surveys Performed. | |||
Two hundred and ninety-five (295) curies of tritium and 267 curies of Argon-41 were released as gaseous waste, while 1.4 curies of tritium and 25 millicuries of other B-y emitters were released into the sanitary sewer. | Two hundred and ninety-five (295) curies of tritium and 267 curies of Argon-41 were released as gaseous waste, while 1.4 curies of tritium and 25 millicuries of other B-y emitters were released into the sanitary sewer. | ||
Environmental samples of the streams, wells, vegetation and/or | Environmental samples of the streams, wells, vegetation and/or soil, and air showed no significant cha'nges. | ||
7.8d(6) | |||
Summary of Significant Exposures received by Facility Personnel i | |||
and Visitors. | and Visitors. | ||
1. | |||
No significant exposures were received by any visitor. | |||
2. | |||
One facility (non-operations) personnel received a significant exposure during this period of 1.70 rem. | |||
_}} | |||
Latest revision as of 09:09, 14 December 2024
| ML20080K478 | |
| Person / Time | |
|---|---|
| Site: | National Bureau of Standards Reactor |
| Issue date: | 09/08/1983 |
| From: | Rozier Carter NATIONAL INSTITUTE OF STANDARDS & TECHNOLOGY (FORMERL |
| To: | Thomas C Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8309290170 | |
| Download: ML20080K478 (6) | |
Text
.
i NATIONAL BUREAU OF STANDARDS REACTOR Docket # 50-184 Facility License No. TR-5 OPERATIONS REPORT I
- - - #35 - - -
January, 1983 - June, 1983 This report contains a summary of activities connected with the operations of the NBSR. It is submitted in fulfillment of section 7.8d of the NBSR Technical Specifications and covers the period from January 1, I
1983 to June 30, 1983.
Section numbers in this report (such as, 7.8d(l)) correspond to those used in the Technical Specifications, i
September *. 1983 h, h'%
k ROBERT S. CARTER i
Chief, Reactor Radiation Division t
I 8309290170 830908 l
PDR ADOCK 05000184
[
R PDR
=
I i
TABLE OF CONTENTS 1
- 7. 8d (1)
Summary of Plant Operations 7.8d(2)
Unscheduled Shutdowns
- 7. 8d (3)
Tabulation of Major Items of Plant Maintenance 7.8d(4)
Tabulation of Major Changes in the Facility and Procedures, and the Test and Experiments, Carried Out Without Prior Approval i
l by the U. S. AEC (10 CFR 50.59) 7.8d(5)
Summary of Radioactive Material Released and Results of Environ-mental Surveys Performed 7.8d(6)
Summary of Significant Exposures Received by Facility Personnel 2
and Visitors I
c
\\
w I
T I
/t n
f 4
s f
7 T)i '..
'~
- t
%=.
g gi j,
s
%N Y,
f lI I
+
" Y t. <
-(
p'yq
,1
.)j s
\\
g
\\
>; y
)
t a
,. e 7
i A
\\
e
^
' k.G
.\\
[
's.g1
'/
\\
4
</,
f;
,y
- , (
m e
~ ~
.4 i'
j.
,y
._~
c.
k 3
?
, f i'f
a
)
g f --
" m if.
i s._ '
w lp i l^
'.a
~u e
s uJ l_
~.,,..
a g
_,,j.
.g
_1_
- 7. 8d (1)
Summary of Plant Operations During the period January 1, 1983 through June 30, 1983 the reactor was critical for 3695 hours0.0428 days <br />1.026 hours <br />0.00611 weeks <br />0.00141 months <br /> and the energy generated was 36305 MWH.
All reactor operations were routine and uneventful.
A program for modernization of the Reactor Console is continuing.
- 7. 8d (2)
Unscheduled Shutdowns There were two unscheduled shutdowns during this reporting period.
1-13-83 Manual scram when operator struck the Scram button while opening a recorder door to mark chart. Returned to power immediately.
3-23-83 Low flow Scram during commercial power interruption.
Returned to power immediately.
7.8d(3)
Tabulation of Major Items of Plant Maintenance 1.
Replaced Reg Rod with spare unit.
2.
Reset #1 Shim Arm clutch gap.
3.
Replaced drive gear in #3 Shim Arm Indication Unit.
4.
Installed new bearings in #1 primary pump motor.
5.
Replaced MCP Motor #4 with MCP Motor #1.
6.
Changed diaphragm (twice) on DWV-184.
7.
Replaced orfice plate low predsure sensing line of FIA-5 (purification flow instrument).
I 8.
Installed vacuum system and filter on fuel cutting saw.
9.
Repalced piping between COV-1 and COV-2.
- 10. Removed KWV-13 Air Operator Valve (replaced in July 83).
- 11. Changed resin in Thermal Shield #1 I.X. and #2 I.X.
l
, 12. Changed Storage Pool I.X. resin, prefilters (twice) and after filters.
- 13. Adjusted #2 Cooling Tower fan motor vibration switch.
- 14. Replaced bearings in EF-3.
- 15. Replaced batteries on Diesel Generator "A".
- 16. Replaced time delay relay on #4 Secondary Pump.
- 17. Replaced Amplifier & recalib. TIA-40A.
- 18. Replaced Amplifier in Ph recorder
- 19. Reseated shunt pin connection on NC-3 and 4 to correct remote console indication.
- 20. Replaced Square Root extractor on BTUR system.
- 21. Repaired Amplifier on Ucrmal Air Monitor Channel.
- 22. Re'=librated Heat Exchanger outlet temperature channel (TIA-4).
- 23. Repaired Storage Pool Cooling Water Flow Transmitter (FIA-13)
Calibrated Channel.
- 24. Calibrated Storage Pool Ion Exchanger Flow Channel (FIA-14).
- 25. Replaced Amplifier to Console Readout (RM3-5).
- 26. Replaced Chart Drive Motor on AT recorder (TR-1).
- 27. Replaced wire nut connection with soldered connections on Cooling Tower controls (LIC-9).
l
- 28. Engineering Changes during this period:
ECN 268 Install Transpac Pwr. Sup. to NC-2 ECN 277 Replaced the BTUR and Outlet flow recorders (2 of the 3 recorders on ECN) i
u i '
t 4
l
- 29. Instrument Procedures performed:
RM3-1 Secondary Coolant Radiation Monitor NC-7 Nuclear Power Range Channel NC-8 Nuclear Power Range Channel RM1-1 thru 10 Area Monitors RM3-4 Irradiated Air Radiation Monitor NC-4 Nuclear Intermediate Range Channel RM4-1 Stack Air Radiation Monitor FRC-3 Rx Outer Plenum Flow FRC-4 Rx Inner Plenum Flow TIA-40A Rx Delta Temperature SPS-150 Emergency Standby Fan Controller 7.8d(4)
Tabulation of Major Changes in the Facility and Procedures, I
and the Test and Experiments, Carried Out Without Prior Approval by the U. S. AEC (lb ZFR 50.59).
None this reporting period.
- 7. 8d (5)
Summary of Radioactive Material Released and Results of i
Environmental Surveys Performed.
Two hundred and ninety-five (295) curies of tritium and 267 curies of Argon-41 were released as gaseous waste, while 1.4 curies of tritium and 25 millicuries of other B-y emitters were released into the sanitary sewer.
Environmental samples of the streams, wells, vegetation and/or soil, and air showed no significant cha'nges.
7.8d(6)
Summary of Significant Exposures received by Facility Personnel i
and Visitors.
1.
No significant exposures were received by any visitor.
2.
One facility (non-operations) personnel received a significant exposure during this period of 1.70 rem.