i NATIONAL BUREAU OF STANDARDS REACTOR Docket # 50-184 Facility License No. TR-5 OPERATIONS REPORT I
- - - #35 - - -
January, 1983 - June, 1983 This report contains a summary of activities connected with the operations of the NBSR. It is submitted in fulfillment of section 7.8d of the NBSR Technical Specifications and covers the period from January 1, I
1983 to June 30, 1983.
Section numbers in this report (such as, 7.8d(l)) correspond to those used in the Technical Specifications, i
September *. 1983 h, h'%
k ROBERT S. CARTER i
Chief, Reactor Radiation Division t
I 8309290170 830908 l
PDR ADOCK 05000184
[
R PDR
=
I i
TABLE OF CONTENTS 1
- 7. 8d (1)
Summary of Plant Operations 7.8d(2)
Unscheduled Shutdowns
- 7. 8d (3)
Tabulation of Major Items of Plant Maintenance 7.8d(4)
Tabulation of Major Changes in the Facility and Procedures, and the Test and Experiments, Carried Out Without Prior Approval i
l by the U. S. AEC (10 CFR 50.59) 7.8d(5)
Summary of Radioactive Material Released and Results of Environ-mental Surveys Performed 7.8d(6)
Summary of Significant Exposures Received by Facility Personnel 2
and Visitors I
c
\\
w I
T I
/t n
f 4
s f
7 T)i '..
'~
- t
%=.
g gi j,
s
%N Y,
f lI I
+
" Y t. <
-(
p'yq
,1
.)j s
\\
g
\\
>; y
)
t a
,. e 7
i A
\\
e
^
' k.G
.\\
[
's.g1
'/
\\
4
</,
f;
,y
- , (
m e
~ ~
.4 i'
j.
,y
._~
c.
k 3
?
, f i'f
a
)
g f --
" m if.
i s._ '
w lp i l^
'.a
~u e
s uJ l_
~.,,..
a g
_,,j.
.g
_1_
- 7. 8d (1)
Summary of Plant Operations During the period January 1, 1983 through June 30, 1983 the reactor was critical for 3695 hours0.0428 days <br />1.026 hours <br />0.00611 weeks <br />0.00141 months <br /> and the energy generated was 36305 MWH.
All reactor operations were routine and uneventful.
A program for modernization of the Reactor Console is continuing.
- 7. 8d (2)
Unscheduled Shutdowns There were two unscheduled shutdowns during this reporting period.
1-13-83 Manual scram when operator struck the Scram button while opening a recorder door to mark chart. Returned to power immediately.
3-23-83 Low flow Scram during commercial power interruption.
Returned to power immediately.
7.8d(3)
Tabulation of Major Items of Plant Maintenance 1.
Replaced Reg Rod with spare unit.
2.
Reset #1 Shim Arm clutch gap.
3.
Replaced drive gear in #3 Shim Arm Indication Unit.
4.
Installed new bearings in #1 primary pump motor.
5.
Replaced MCP Motor #4 with MCP Motor #1.
6.
Changed diaphragm (twice) on DWV-184.
7.
Replaced orfice plate low predsure sensing line of FIA-5 (purification flow instrument).
I 8.
Installed vacuum system and filter on fuel cutting saw.
9.
Repalced piping between COV-1 and COV-2.
- 10. Removed KWV-13 Air Operator Valve (replaced in July 83).
- 11. Changed resin in Thermal Shield #1 I.X. and #2 I.X.
l
, 12. Changed Storage Pool I.X. resin, prefilters (twice) and after filters.
- 13. Adjusted #2 Cooling Tower fan motor vibration switch.
- 14. Replaced bearings in EF-3.
- 15. Replaced batteries on Diesel Generator "A".
- 16. Replaced time delay relay on #4 Secondary Pump.
- 17. Replaced Amplifier & recalib. TIA-40A.
- 18. Replaced Amplifier in Ph recorder
- 19. Reseated shunt pin connection on NC-3 and 4 to correct remote console indication.
- 20. Replaced Square Root extractor on BTUR system.
- 21. Repaired Amplifier on Ucrmal Air Monitor Channel.
- 22. Re'=librated Heat Exchanger outlet temperature channel (TIA-4).
- 23. Repaired Storage Pool Cooling Water Flow Transmitter (FIA-13)
Calibrated Channel.
- 24. Calibrated Storage Pool Ion Exchanger Flow Channel (FIA-14).
- 25. Replaced Amplifier to Console Readout (RM3-5).
- 26. Replaced Chart Drive Motor on AT recorder (TR-1).
- 27. Replaced wire nut connection with soldered connections on Cooling Tower controls (LIC-9).
l
- 28. Engineering Changes during this period:
ECN 268 Install Transpac Pwr. Sup. to NC-2 ECN 277 Replaced the BTUR and Outlet flow recorders (2 of the 3 recorders on ECN) i
u i '
t 4
l
- 29. Instrument Procedures performed:
RM3-1 Secondary Coolant Radiation Monitor NC-7 Nuclear Power Range Channel NC-8 Nuclear Power Range Channel RM1-1 thru 10 Area Monitors RM3-4 Irradiated Air Radiation Monitor NC-4 Nuclear Intermediate Range Channel RM4-1 Stack Air Radiation Monitor FRC-3 Rx Outer Plenum Flow FRC-4 Rx Inner Plenum Flow TIA-40A Rx Delta Temperature SPS-150 Emergency Standby Fan Controller 7.8d(4)
Tabulation of Major Changes in the Facility and Procedures, I
and the Test and Experiments, Carried Out Without Prior Approval by the U. S. AEC (lb ZFR 50.59).
None this reporting period.
- 7. 8d (5)
Summary of Radioactive Material Released and Results of i
Environmental Surveys Performed.
Two hundred and ninety-five (295) curies of tritium and 267 curies of Argon-41 were released as gaseous waste, while 1.4 curies of tritium and 25 millicuries of other B-y emitters were released into the sanitary sewer.
Environmental samples of the streams, wells, vegetation and/or soil, and air showed no significant cha'nges.
7.8d(6)
Summary of Significant Exposures received by Facility Personnel i
and Visitors.
1.
No significant exposures were received by any visitor.
2.
One facility (non-operations) personnel received a significant exposure during this period of 1.70 rem.
_