/ 142 DELARONDE STREET POWER & L1GHT/ P O box 6008 | |||
* NEW ORLEANS. LOUISIANA 70174 * (504) 366 2345 MIDDLE SOUTH UiluTIES SYSTEM | * NEW ORLEANS. LOUISIANA 70174 * (504) 366 2345 MIDDLE SOUTH UiluTIES SYSTEM March 8, 1984 W3P84-0609 3-A1.01.04 Q-3-A20.02.02 L.02 Director of Nuclear Reactor Regulation Attention: | ||
Mr. G. W. Knighton, Chief Licensing Branch No. 3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 27: | Line 28: | ||
==Dear Sir:== | ==Dear Sir:== | ||
The subject Generic Letter, in Item 4.2, requested a description of the preventive maintenance and surveillance programs in place at Waterforu 3 to ensure reliable reactor trip breaker operation. | The subject Generic Letter, in Item 4.2, requested a description of the preventive maintenance and surveillance programs in place at Waterforu 3 to ensure reliable reactor trip breaker operation. | ||
Section 4.2.1 requested information about our planned program of periodic maintenance. This was addressed in the referenced initial response to Generic Letter 83-28. | Section 4.2.1 requested information about our planned program of periodic maintenance. This was addressed in the referenced initial response to Generic Letter 83-28. | ||
| Line 36: | Line 36: | ||
8403150046 840308 DR ADOCK 0S000382 PDR l | 8403150046 840308 DR ADOCK 0S000382 PDR l | ||
1 | 1 | ||
* Page 2 W3P84-0610 Should you have'any questions or comments in this matter please contact Mike Meisner at-(504) 363-8938. | * Page 2 W3P84-0610 Should you have'any questions or comments in this matter please contact Mike Meisner at-(504) 363-8938. | ||
Yours very truly. | Yours very truly. | ||
h K. W. Cook-Nuclear Support & Licensing Manager KWC/MJM/pco cc: | h K. W. Cook-Nuclear Support & Licensing Manager KWC/MJM/pco cc: | ||
W. !!. Stevenson, E. L. Blake, J. Wilson, G. L. Constable N | |||
l | l | ||
_m.}} | _m.}} | ||
Latest revision as of 08:15, 14 December 2024
| ML20081C852 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 03/08/1984 |
| From: | Cook K ARKANSAS POWER & LIGHT CO., LOUISIANA POWER & LIGHT CO. |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| References | |
| GL-83-28, W3P84-0609, W3P84-609, NUDOCS 8403150046 | |
| Download: ML20081C852 (2) | |
Text
_
/ 142 DELARONDE STREET POWER & L1GHT/ P O box 6008
- NEW ORLEANS. LOUISIANA 70174 * (504) 366 2345 MIDDLE SOUTH UiluTIES SYSTEM March 8, 1984 W3P84-0609 3-A1.01.04 Q-3-A20.02.02 L.02 Director of Nuclear Reactor Regulation Attention:
Mr. G. W. Knighton, Chief Licensing Branch No. 3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
SUBJECT:
Waterford SES Unit 3 Docket No. 50-382 Response to Generic Letter 83-28, Item 4.2 Reactor Trip System Reliability (Preventive Maintenance and Surveillance Program for Reactor Trip Breakers)
REFERENCE:
W3P83-3318 dated November 4, 1983
Dear Sir:
The subject Generic Letter, in Item 4.2, requested a description of the preventive maintenance and surveillance programs in place at Waterforu 3 to ensure reliable reactor trip breaker operation.
Section 4.2.1 requested information about our planned program of periodic maintenance. This was addressed in the referenced initial response to Generic Letter 83-28.
Section 4.2.2 requested information on the trending of parameters affecting operation and measured during testing to forecast degradation of operability.
By procedure (ME-4-155), the breaker opening time (undervoltage trip device) is measured on a monthly basis in accordance with the recommenda-tions of CE ADP Infobulletin 83-07, dated June 15, 1983. These measurements will be trended monthly to forecast degradation of breaker operability.
Should degradation become apparent from the trended data the frequency of preventive maintenance will be increased.
Sections 4.2.3 and 4.2.4 address life cycle testing and periodic replace-ment based on demonstrated life cycles. LP&L is participating in a CE Owners Group effort to address these requirements. Because the effort is under development a schedule for compliance is not yet available. LP&L will provide further information as to program ar.d schedule by July 2, 1984.
8403150046 840308 DR ADOCK 0S000382 PDR l
1
- Page 2 W3P84-0610 Should you have'any questions or comments in this matter please contact Mike Meisner at-(504) 363-8938.
Yours very truly.
h K. W. Cook-Nuclear Support & Licensing Manager KWC/MJM/pco cc: