W3P84-0610, Responds to Generic Ltr 83-28,Item 4.5.3 Re Reactor Trip Sys Reliability (Sys Functional Testing).Util Participating in C-E Owners Group Evaluation.Results Due by 841203

From kanterella
(Redirected from W3P84-0610)
Jump to navigation Jump to search
Responds to Generic Ltr 83-28,Item 4.5.3 Re Reactor Trip Sys Reliability (Sys Functional Testing).Util Participating in C-E Owners Group Evaluation.Results Due by 841203
ML20087C789
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/08/1984
From: Cook K
LOUISIANA POWER & LIGHT CO.
To: Knighton G
Office of Nuclear Reactor Regulation
References
840308-1, GL-83-28, W3P84-0610, W3P84-610, NUDOCS 8403130170
Download: ML20087C789 (1)


Text

l C Louisi Awa POWER & LIGHT 44e m,eO~m erom P O BOX 6006

  • NEW ORLEANS. LOUISIANA 70174 + (504) 366-2345 E$fuS$5vsYIU

. March 8, 1984 W3P84-0610 3-A1.01.04 Q-3-A20.02.02 L.02 Director of Nuclear Reactor Regulation Attention: Mr. G. W. Knighton, Chief Licensing Branch No. 3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

SUBJECT:

Waterford SES Unit 3 Docket No. 50-382 Response to Generic Letter 83-28, Item 4.5.3 Reactor Trip System Reliability (System Functional Testing)

REFERENCE:

W3P83-3318 dated November 4, 1983

Dear Sir:

The subject Generic Letter, in Item 4.5.3, required a review of the existing Technical Specification intervals for on-line functional testing of the reactor trip system.

As noted in our initial referenced response to Generic Letter 83-28, LP&L is participating in a CE Owners Group evaluation of the functional test intervals for the reactor trip system. We expect to be able to submit the results of the evaluation by December 3, 1984.

Should you have any questions or comments in this matter, please contact Mike Meisner at (504) 363-8938.

Yours very truly, K. W. Cook Nuclear Support & Licensing Manager l oss-KWC/MJM/pco

/o cr* W. M. Stevenson, E. L. Blake, J. Wilm G. L. Constable 8403130170 840308 PDR ADOCK 05000382 A PDR