ML20082U934: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_ _ _ _ _
{{#Wiki_filter:/
hMh
[
'X.
C;mm:nwr::lth Edison
/
/
          /
\\ LaSalle County Nuclear Station O
[                'X. C;mm:nwr::lth Edison
h
                                  \ LaSalle County Nuclear Station hMh f     i __ I Rural Route #1, Box 220                                                         /], '  O
/], ' d f
        \ '
i __ I Rural Route #1, Box 220
                              /
\\
                                '/ Marseilles, Illinois 61341 Telephone 815/357-6761 h
'/ Marseilles, Illinois 61341 J
V    J d l' my                                                                                                ,.
l'
                                                                                                    '  d November 28, 1983 Mr. James G. Keppler Regional Adminstrator Region ill U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137
/
Telephone 815/357-6761 V
my d
November 28, 1983 Mr. James G. Keppler Regional Adminstrator Region ill U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137


==SUBJECT:==
==SUBJECT:==
LaSalle County Station Leak Reduction Program Data; NUREG
LaSalle County Station Leak Reduction Program Data; NUREG 0578 Item 2.1.6.9 In accordance with our committment from the FSAR Section L.77, LaSalle County Station is submitting a report of all recorded leakage and the preventive maintenance performed as a result of such leakage.
,                                      0578 Item 2.1.6.9 In accordance with our committment from the FSAR Section L.77, LaSalle County Station is submitting a report of all recorded leakage and the preventive maintenance performed as a result of such leakage.
See attached letter from G. J. Diederich to D. P. Galle dated November 17, 1983 The general criteria to be used for first fuel cycle is that any 4
See attached letter from G. J. Diederich to D. P. Galle dated November 17, 1983 4                              The general criteria to be used for first fuel cycle is that any                       s leak greater than 6 drop / minute will require a work request to be written.
s leak greater than 6 drop / minute will require a work request to be written.
                                                                            ,-  ,8   '
,8 G. J. Diederich Station Superintendent LaSalle County Station GJD/KCU/rmp Enclosure 8312190227 831128 PDR ADOCK 05000373 h
G. J. Diederich Station Superintendent LaSalle County Station GJD/KCU/rmp Enclosure 8312190227 831128 PDR ADOCK 05000373 P                                                   PDR h
P PDR
                                                                                                              \fl \
\\fl
\\ '


(~                                               ..        .                                          .
(~
1       .
1 November 17, 1983 TO:
November 17, 1983 TO:           D. P. Galle
D. P. Galle


==SUBJECT:==
==SUBJECT:==
Line 46: Line 54:
Attached is a tabular summary of the leakage visually observed and estimated. Most of the observed leakage was due to packing leaks. All observed leaks were made known to the Operating Department through Work Requests for repair as necessary.
Attached is a tabular summary of the leakage visually observed and estimated. Most of the observed leakage was due to packing leaks. All observed leaks were made known to the Operating Department through Work Requests for repair as necessary.
None of the leakage observed was significant from an operational or radiological viewpoint. The minor leakage that was determined, therefore, did not have any adverse impact on the safe operation of the plant, nor the health and safety of the public.
None of the leakage observed was significant from an operational or radiological viewpoint. The minor leakage that was determined, therefore, did not have any adverse impact on the safe operation of the plant, nor the health and safety of the public.
                                                                                                                        /
/
G. J. Diederich Station Superintendent LaSalle County Station GJD/KCW/rmp Enclosure
G. J. Diederich Station Superintendent LaSalle County Station GJD/KCW/rmp Enclosure
_ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ - _ - _ _                                                                                        .I
.I


UNIT 1 LEAK DETECTION RESULTS Valve / Component       Estimated Leakage               Work Request Solution IE12-F003A             1 drop / min.                   tighten packing IE12-F006A             1 drop / min.                   tighten packing IE12-F0168             unknown                         repack 1E12-F027B             200 drops / min.                 tighten packing 1E12-F047A             4 drops / min.                   tighten packing 1E12-F047B             2 drops / min.                   tighten packing IE12-F048A             1 drop / min.                   tighten packing 1E12-F052B             Steam Plume 5' by 2'             repack dia. cone 1E12-F092B             unknown                         adjusted packing IE12-F098A             1 drop / min.                   tighten packing 1E12-F0988             2 drops / min.                   tighten packing
UNIT 1 LEAK DETECTION RESULTS Valve / Component Estimated Leakage Work Request Solution IE12-F003A 1 drop / min.
              *1E12-F098C               2 drops / min.                   tighten packing 1E12-F381A             4 drops / min.                 tighten packing IE12-N008A             90 drops / min.                 tightened connection 1E21-F005               13 drops / min.                 repack 6 drops / min.                   tighten packing IE21-F012               1 drop / min.                   tighten packing 1E22-F001               25 drops / min.                 tighten packing 1E22-F004               unknown                         adjusted packing follower IE22-F010               40 drops / min.                 adjusted packing follower
tighten packing IE12-F006A 1 drop / min.
              '1E22-F011               40 drops / min.                 tighten packing IE22-F023             running stream                 tighten packing 1E22-F035             unknown                         replaced relief valve 1E51-0003             unknown                         removed bonnet and cleaned cage on steam trap 1E51-F008             unknown size steam leak         repack o-
tighten packing IE12-F0168 unknown repack 1E12-F027B 200 drops / min.
tighten packing 1E12-F047A 4 drops / min.
tighten packing 1E12-F047B 2 drops / min.
tighten packing IE12-F048A 1 drop / min.
tighten packing 1E12-F052B Steam Plume 5' by 2' repack dia. cone 1E12-F092B unknown adjusted packing IE12-F098A 1 drop / min.
tighten packing 1E12-F0988 2 drops / min.
tighten packing
*1E12-F098C 2 drops / min.
tighten packing 1E12-F381A 4 drops / min.
tighten packing IE12-N008A 90 drops / min.
tightened connection 1E21-F005 13 drops / min.
repack 6 drops / min.
tighten packing IE21-F012 1 drop / min.
tighten packing 1E22-F001 25 drops / min.
tighten packing 1E22-F004 unknown adjusted packing follower IE22-F010 40 drops / min.
adjusted packing follower
'1E22-F011 40 drops / min.
tighten packing IE22-F023 running stream tighten packing 1E22-F035 unknown replaced relief valve 1E51-0003 unknown removed bonnet and cleaned cage on steam trap 1E51-F008 unknown size steam leak repack o-


l g-   .
l g-Valve / Component Estimated Leakage Work Request Solution 1E51-F013 90 drops / min.
Valve / Component Estimated Leakage       Work Request Solution 1E51-F013       90 drops / min.         retapped packing plug IE51-F025       unknown                 repack IE51-F026       unknown size steam pack repack IE51-F038       unknown                 repack IE51-F045       unknown                 tighten packing 1E51-F064       unknown                 tighten packing 1G33-B001B weld unknown                 rewelded weld on RWCU heat exchanger IG33-F001       unknc+.~n               repack 1G33-F004       unknown                 repack 1G33-F032       1 drop / min.           tighten packing 1G33-F034       unknown                 repack 1G33-F040       unknown                 tighten packing 1G33-F047B       1 drop / min.           tighten packing                             .
retapped packing plug IE51-F025 unknown repack IE51-F026 unknown size steam pack repack IE51-F038 unknown repack IE51-F045 unknown tighten packing 1E51-F064 unknown tighten packing 1G33-B001B weld unknown rewelded weld on RWCU heat exchanger IG33-F001 unknc+.~n repack 1G33-F004 unknown repack 1G33-F032 1 drop / min.
IG33-F047C       1 drop / min.           tighten packing 1G33-F047E       1 drop / min.           tighten packing 1G33-F105B       1 drop / min.           tighten packing 1G33-F340A       weeping heavily         not complete as of 11/5/83 1G33-F351       unknown                 applied pipe dope to plug threads 1G33-F352       unknown                 applied pipe dope to plug threads IG33-F354       1 drop / min.           tighten packing 1G33-2001-29C   unknown                 tighten loose bonnet bolts 1G33-Z001-34C   unknown                 repack 1H22-P005       2 drops / min.         tighten connections IH22-P022         5 gpm                 drain line unions tightened
tighten packing 1G33-F034 unknown repack 1G33-F040 unknown tighten packing 1G33-F047B 1 drop / min.
tighten packing IG33-F047C 1 drop / min.
tighten packing 1G33-F047E 1 drop / min.
tighten packing 1G33-F105B 1 drop / min.
tighten packing 1G33-F340A weeping heavily not complete as of 11/5/83 1G33-F351 unknown applied pipe dope to plug threads 1G33-F352 unknown applied pipe dope to plug threads IG33-F354 1 drop / min.
tighten packing 1G33-2001-29C unknown tighten loose bonnet bolts 1G33-Z001-34C unknown repack 1H22-P005 2 drops / min.
tighten connections IH22-P022 5 gpm drain line unions tightened
__________-_____--____-_.__-____j}}
__________-_____--____-_.__-____j}}

Latest revision as of 06:18, 14 December 2024

Forwards Leak Reduction Program Data,Per NUREG-0578, Item 2.1.6.9.Leaks Greater than 6 Drop/Minute Require Written Work Request
ML20082U934
Person / Time
Site: LaSalle  
Issue date: 11/28/1983
From: Diederich G
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
RTR-NUREG-0578, RTR-NUREG-578 NUDOCS 8312190227
Download: ML20082U934 (4)


Text

/

hMh

[

'X.

C;mm:nwr::lth Edison

/

\\ LaSalle County Nuclear Station O

h

/], ' d f

i __ I Rural Route #1, Box 220

\\

'/ Marseilles, Illinois 61341 J

l'

/

Telephone 815/357-6761 V

my d

November 28, 1983 Mr. James G. Keppler Regional Adminstrator Region ill U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

SUBJECT:

LaSalle County Station Leak Reduction Program Data; NUREG 0578 Item 2.1.6.9 In accordance with our committment from the FSAR Section L.77, LaSalle County Station is submitting a report of all recorded leakage and the preventive maintenance performed as a result of such leakage.

See attached letter from G. J. Diederich to D. P. Galle dated November 17, 1983 The general criteria to be used for first fuel cycle is that any 4

s leak greater than 6 drop / minute will require a work request to be written.

,8 G. J. Diederich Station Superintendent LaSalle County Station GJD/KCU/rmp Enclosure 8312190227 831128 PDR ADOCK 05000373 h

P PDR

\\fl

\\ '

(~

1 November 17, 1983 TO:

D. P. Galle

SUBJECT:

"LaSalle County Station Leak Reduction Program Dsta; NUREG 0578 ltem 2.1.6.9; LAP 100-14.

In accordance with our commitment for yearly leak 2ae surveillance, leakage data has been taken at LaSalle County Static, Unit 1.

Since LaSalle County Station Unit 1 has just completed the Startup program, the data is for the entire period of Startup.

Attached is a tabular summary of the leakage visually observed and estimated. Most of the observed leakage was due to packing leaks. All observed leaks were made known to the Operating Department through Work Requests for repair as necessary.

None of the leakage observed was significant from an operational or radiological viewpoint. The minor leakage that was determined, therefore, did not have any adverse impact on the safe operation of the plant, nor the health and safety of the public.

/

G. J. Diederich Station Superintendent LaSalle County Station GJD/KCW/rmp Enclosure

.I

UNIT 1 LEAK DETECTION RESULTS Valve / Component Estimated Leakage Work Request Solution IE12-F003A 1 drop / min.

tighten packing IE12-F006A 1 drop / min.

tighten packing IE12-F0168 unknown repack 1E12-F027B 200 drops / min.

tighten packing 1E12-F047A 4 drops / min.

tighten packing 1E12-F047B 2 drops / min.

tighten packing IE12-F048A 1 drop / min.

tighten packing 1E12-F052B Steam Plume 5' by 2' repack dia. cone 1E12-F092B unknown adjusted packing IE12-F098A 1 drop / min.

tighten packing 1E12-F0988 2 drops / min.

tighten packing

  • 1E12-F098C 2 drops / min.

tighten packing 1E12-F381A 4 drops / min.

tighten packing IE12-N008A 90 drops / min.

tightened connection 1E21-F005 13 drops / min.

repack 6 drops / min.

tighten packing IE21-F012 1 drop / min.

tighten packing 1E22-F001 25 drops / min.

tighten packing 1E22-F004 unknown adjusted packing follower IE22-F010 40 drops / min.

adjusted packing follower

'1E22-F011 40 drops / min.

tighten packing IE22-F023 running stream tighten packing 1E22-F035 unknown replaced relief valve 1E51-0003 unknown removed bonnet and cleaned cage on steam trap 1E51-F008 unknown size steam leak repack o-

l g-Valve / Component Estimated Leakage Work Request Solution 1E51-F013 90 drops / min.

retapped packing plug IE51-F025 unknown repack IE51-F026 unknown size steam pack repack IE51-F038 unknown repack IE51-F045 unknown tighten packing 1E51-F064 unknown tighten packing 1G33-B001B weld unknown rewelded weld on RWCU heat exchanger IG33-F001 unknc+.~n repack 1G33-F004 unknown repack 1G33-F032 1 drop / min.

tighten packing 1G33-F034 unknown repack 1G33-F040 unknown tighten packing 1G33-F047B 1 drop / min.

tighten packing IG33-F047C 1 drop / min.

tighten packing 1G33-F047E 1 drop / min.

tighten packing 1G33-F105B 1 drop / min.

tighten packing 1G33-F340A weeping heavily not complete as of 11/5/83 1G33-F351 unknown applied pipe dope to plug threads 1G33-F352 unknown applied pipe dope to plug threads IG33-F354 1 drop / min.

tighten packing 1G33-2001-29C unknown tighten loose bonnet bolts 1G33-Z001-34C unknown repack 1H22-P005 2 drops / min.

tighten connections IH22-P022 5 gpm drain line unions tightened

__________-_____--____-_.__-____j