ML20084C053: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:!                                         .
{{#Wiki_filter:!
  ~
O.
O.                                     O                           Sun 50- KG 301 fardmeter, bn c.                                                                   50- 03 !
O Sun
Consulting Engineers
~
* Design - Analysis - Development 13545 WATERTOWN PLANK ROAD, ELM GROYE, Wl5 CON 5lN $3122 786 7580 l
50- KG 301 fardmeter, bn c.
50- 03 !
Consulting Engineers Design - Analysis - Development 13545 WATERTOWN PLANK ROAD, ELM GROYE, Wl5 CON 5lN $3122 786 7580 l
March 22, 1969 Mr. L. Kornblith, Jr.
March 22, 1969 Mr. L. Kornblith, Jr.
Assistant Director for Reactors United States Atomic Energy Commission Division of Compliance Washington, D. C. 20545                   Copies: G. W. Reinmuth H. R. Denton
Assistant Director for Reactors United States Atomic Energy Commission Division of Compliance Washington, D. C.
20545 Copies: G. W. Reinmuth H. R. Denton


==Reference:==
==Reference:==
Line 29: Line 32:
Transmitted herewith are the following reports:
Transmitted herewith are the following reports:
( two (2) copies each)
( two (2) copies each)
                  . Metallurgical Examination and Review of Casting l Defects in the Stainless Steel Valve Bodies Located in the Class One Systems of the Oyster
. Metallurgical Examination and Review of Casting l Defects in the Stainless Steel Valve Bodies Located in the Class One Systems of the Oyster
                  ; Creek Reactor" - Report No. DC-31 by R. G.
; Creek Reactor" - Report No. DC-31 by R. G.
Gilliland dated March 3, 1969.
Gilliland dated March 3, 1969.
                  " Evaluation of the Welding and Inspection Techniques for the Repair of the Botton Plate Weld in the Point Beach Reactor Containment Membrane" - Report No. DC-32 by R. G. Gilliland dated February 28, 1969.
" Evaluation of the Welding and Inspection Techniques for the Repair of the Botton Plate Weld in the Point Beach Reactor Containment Membrane" - Report No. DC-32 by R. G. Gilliland dated February 28, 1969.
                  " Report of Participation in Intensive Quality Assurance Audit by Region III, Division of Compliance for Dresden Unit 2 - Commonwealth Edison Company, Morris, Illinois" - Report No. DC-33 by Richard A. Lofy dated March 20, og             1969.
" Report of Participation in Intensive Quality Assurance Audit by Region III, Division of Compliance for Dresden Unit 2 - Commonwealth Edison Company, Morris, Illinois" - Report No. DC-33 by Richard A. Lofy dated March 20, og 1969.
o.o   f/y n   k$f                              Very truly yours, an Itn T~L 4e
k$f o.o f/y n Very truly yours, an n L 4e lj7 It
[, 'y lj7 PARAMETER, Inc.
[,
Y"         u 04 i                                           L. C. Campbe 1 8mo     1cc
'y PARAMETER, Inc.
T~
Y" u
04 i
L. C. Campbe 1 8mo 1cc


==Enclosures:==
==Enclosures:==
 
9 0885 Copies:
9 0885 Copies:     68-69 A file                   DC-33 file i
68-69 A file DC-33 file i
DC-31 file                     R. G. Gilliland DC-32 file}}
DC-31 file R. G. Gilliland DC-32 file}}

Latest revision as of 04:55, 14 December 2024

Forwards Metallurgical Exam & Review of Casting Defects in Stainless Steel Valves Bodies .., Evaluation of Welding & Insp Techniques... & Rept of Participation in Intensive QA Audit by Region Iii,Div of Compliance... W/O Repts
ML20084C053
Person / Time
Site: Dresden, Point Beach, Oyster Creek, 05000000
Issue date: 03/22/1969
From: Campbell L
PARAMETER, INC.
To: Kornblith L
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19289B321 List:
References
NUDOCS 8304070515
Download: ML20084C053 (1)


Text

!

O.

O Sun

~

50- KG 301 fardmeter, bn c.

50- 03 !

Consulting Engineers Design - Analysis - Development 13545 WATERTOWN PLANK ROAD, ELM GROYE, Wl5 CON 5lN $3122 786 7580 l

March 22, 1969 Mr. L. Kornblith, Jr.

Assistant Director for Reactors United States Atomic Energy Commission Division of Compliance Washington, D. C.

20545 Copies: G. W. Reinmuth H. R. Denton

Reference:

Contract No. AT(ll-1)-1658, Task A Consulting Services Gentlemen:

Transmitted herewith are the following reports:

( two (2) copies each)

. Metallurgical Examination and Review of Casting l Defects in the Stainless Steel Valve Bodies Located in the Class One Systems of the Oyster

Creek Reactor" - Report No. DC-31 by R. G.

Gilliland dated March 3, 1969.

" Evaluation of the Welding and Inspection Techniques for the Repair of the Botton Plate Weld in the Point Beach Reactor Containment Membrane" - Report No. DC-32 by R. G. Gilliland dated February 28, 1969.

" Report of Participation in Intensive Quality Assurance Audit by Region III, Division of Compliance for Dresden Unit 2 - Commonwealth Edison Company, Morris, Illinois" - Report No. DC-33 by Richard A. Lofy dated March 20, og 1969.

k$f o.o f/y n Very truly yours, an n L 4e lj7 It

[,

'y PARAMETER, Inc.

T~

Y" u

04 i

L. C. Campbe 1 8mo 1cc

Enclosures:

9 0885 Copies:

68-69 A file DC-33 file i

DC-31 file R. G. Gilliland DC-32 file