{{#Wiki_filter:_ _ _ _ _ _                                       .
{{#Wiki_filter:_ _ _ _ _ _
      ,                    ENNESSEE VALLEY A                         HOAITY                             -
ENNESSEE VALLEY A HOAITY CHATTANOOGA, TENNESSEE37401 40 July 12, 1973 numivensany OEn"T7vTn'8HI
CHATTANOOGA, TENNESSEE
*O Mr. F. E. Kruesi, Director Directorare of Regulatory Operations U.S. Atomic Energy Commission Washington, DC 20545
    ..                                                                  37401 July 12, 1973           40 numivensany OEn"T7vTn'8HI
                                                                                *O Mr. F. E. Kruesi, Director                                                                   .
Directorare of Regulatory Operations                                                   -
U.S. Atomic Energy Commission Washington, DC 20545


==Dear Mr. Kruesi:==
==Dear Mr. Kruesi:==
On June 13, 1973, TVA made initial report to AEC-DRO Inspector W. S. Little of the malfunctioning of the governor on a Browns Ferry emergency diesel generator.
On June 13, 1973, TVA made initial report to AEC-DRO Inspector W. S. Little of the malfunctioning of the governor on a Browns Ferry emergency diesel generator.
In accordance with paragraph 50.55(e) of 10 CFR 50, we submit the enclosed interin. report of the malfunction.
In accordance with paragraph 50.55(e) of 10 CFR 50, we submit the enclosed interin. report of the malfunction.
Very truly yours,       J i
Very truly yours, J
0, y.v.             y J. E. Gilleland Assistant to the Manager of Power Enclosure CC (Enclosure):
0, iy.v.
y J. E. Gilleland Assistant to the Manager of Power Enclosure CC (Enclosure):
Mr. Norman C. Moseley, Director Directorate of Regulatory Operations U.S. Atomic Energy Commission Region II - Suite 818 230 Peachtree Street, NW.
Mr. Norman C. Moseley, Director Directorate of Regulatory Operations U.S. Atomic Energy Commission Region II - Suite 818 230 Peachtree Street, NW.
Atlanta, Georgia 30303 n
Atlanta, Georgia 30303 n
f lEE*EEllER'd8888g, PDR k'h;\'IY 5s                             y s
f lEE*EEllER'd8888g, k'h;\\'IY PDR 5s y
y,     4 map 3 CG2?
s y,
4 map 3 CG2?


r 3
r 3
,                                      ,                                ,,                              l U             ENCLOSURE U                                l BROWNS FERRY NUCLEAR PLANT INTERIM REFORT ON FAILURE OF GOVERNOR ON EMERGENCY DIESEL-GENERATOR B MODEL 990-20-645E4 On June 13, 1973, TVA made initial report to AEC-DRO Inspector W. S. Little of the malfunctioning of the governor on Brovns Ferry Nuclear Plant emergency diesel generator B.     The following is an interim report on the malfunction.
U U
When the governor did not respond to remote control, an immediate investiga-tion determined that the signal from the EGA box to the hydraulic actuator was out of the range specified by the manufacturer and the low-speed (idle)
ENCLOSURE BROWNS FERRY NUCLEAR PLANT INTERIM REFORT ON FAILURE OF GOVERNOR ON EMERGENCY DIESEL-GENERATOR B MODEL 990-20-645E4 On June 13, 1973, TVA made initial report to AEC-DRO Inspector W. S. Little of the malfunctioning of the governor on Brovns Ferry Nuclear Plant emergency diesel generator B.
;                  setting of the hydraulic actuator varied over an 80-rpm range. A subsequent
The following is an interim report on the malfunction.
!                  inspection revealed the following:
When the governor did not respond to remote control, an immediate investiga-tion determined that the signal from the EGA box to the hydraulic actuator was out of the range specified by the manufacturer and the low-speed (idle) setting of the hydraulic actuator varied over an 80-rpm range. A subsequent inspection revealed the following:
: 1.     Small fragments of foreign material were found in the hydraulic actuator' 5
1.
oil.
Small fragments of foreign material were found in the hydraulic actuator' oil.
i
5 i
;                  2. Two loose terminals were found on the electronic governor.
2.
: 3. The set screws on the speed setting adjustment linkage within the governor actuator were not tightened completely.               ,
Two loose terminals were found on the electronic governor.
3.
The set screws on the speed setting adjustment linkage within the governor actuator were not tightened completely.
}
}
Corrective action involves coordination among TVA, General Electric, Woodward Governor, and the Electro-Motive Division of General Motors, and this action is still in the process of being developed and coordinated.
Corrective action involves coordination among TVA, General Electric, Woodward Governor, and the Electro-Motive Division of General Motors, and this action is still in the process of being developed and coordinated.
i                 Another malfunction involving this governor was reported to Mr. Little on May 4, 1973. An interim report of that previous failure was submitted on         .
i Another malfunction involving this governor was reported to Mr. Little on May 4, 1973. An interim report of that previous failure was submitted on June 31, 1973. It was stated in that report that a final report was expected by July 31, 1973. We plan to cover both calfunctions of this governor in one final report and expect to provide it by July 31, 1973.
.                June 31, 1973. It was stated in that report that a final report was expected by July 31, 1973. We plan to cover both calfunctions of this governor in one final report and expect to provide it by July 31, 1973.
e 1
                                                  %                                    e 1
\\
                                                          \
we n=e m
we n=e m   - - " - -                                                                              -}}
-}}

Latest revision as of 03:28, 14 December 2024

Interim Deficiency Rept Re Failure of Governor on Emergency Diesel Generator.Initially Reported on 730613.Caused by Foreign Matl in Actuator Oil,Loose Terminals & Loose Set Screws.Final Rept Expected by 730731
ML20085G907
Person / Time
Site: Browns Ferry 
Issue date: 07/12/1973
From: Gilleland J
TENNESSEE VALLEY AUTHORITY
To: Kruesi F
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20085G887 List:
References
NUDOCS 8308290509
Download: ML20085G907 (2)


Text

_ _ _ _ _ _

ENNESSEE VALLEY A HOAITY CHATTANOOGA, TENNESSEE37401 40 July 12, 1973 numivensany OEn"T7vTn'8HI

  • O Mr. F. E. Kruesi, Director Directorare of Regulatory Operations U.S. Atomic Energy Commission Washington, DC 20545

Dear Mr. Kruesi:

On June 13, 1973, TVA made initial report to AEC-DRO Inspector W. S. Little of the malfunctioning of the governor on a Browns Ferry emergency diesel generator.

In accordance with paragraph 50.55(e) of 10 CFR 50, we submit the enclosed interin. report of the malfunction.

Very truly yours, J

0, iy.v.

y J. E. Gilleland Assistant to the Manager of Power Enclosure CC (Enclosure):

Mr. Norman C. Moseley, Director Directorate of Regulatory Operations U.S. Atomic Energy Commission Region II - Suite 818 230 Peachtree Street, NW.

Atlanta, Georgia 30303 n

f lEE*EEllER'd8888g, k'h;\\'IY PDR 5s y

s y,

4 map 3 CG2?

r 3

U U

ENCLOSURE BROWNS FERRY NUCLEAR PLANT INTERIM REFORT ON FAILURE OF GOVERNOR ON EMERGENCY DIESEL-GENERATOR B MODEL 990-20-645E4 On June 13, 1973, TVA made initial report to AEC-DRO Inspector W. S. Little of the malfunctioning of the governor on Brovns Ferry Nuclear Plant emergency diesel generator B.

The following is an interim report on the malfunction.

When the governor did not respond to remote control, an immediate investiga-tion determined that the signal from the EGA box to the hydraulic actuator was out of the range specified by the manufacturer and the low-speed (idle) setting of the hydraulic actuator varied over an 80-rpm range. A subsequent inspection revealed the following:

1.

Small fragments of foreign material were found in the hydraulic actuator' oil.

5 i

2.

Two loose terminals were found on the electronic governor.

3.

The set screws on the speed setting adjustment linkage within the governor actuator were not tightened completely.

}

Corrective action involves coordination among TVA, General Electric, Woodward Governor, and the Electro-Motive Division of General Motors, and this action is still in the process of being developed and coordinated.

i Another malfunction involving this governor was reported to Mr. Little on May 4, 1973. An interim report of that previous failure was submitted on June 31, 1973. It was stated in that report that a final report was expected by July 31, 1973. We plan to cover both calfunctions of this governor in one final report and expect to provide it by July 31, 1973.