ML20091A854: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:/ | {{#Wiki_filter:/ | ||
A | A Kntergy Opermbons,inc. | ||
-w~r= ENTERGY | |||
&y-- | |||
er r-r n.r.nur ki W31t!-Ul-0295 A4.06 QA May 14, 1991 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 | |||
n.r.nur ki W31t!-Ul-0295 A4.06 QA May 14, 1991 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 | |||
==Subject:== | ==Subject:== | ||
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Station Blackout (Silo) | Waterford 3 SES Docket No. 50-382 License No. NPF-38 Station Blackout (Silo) | ||
Gentlemen: | Gentlemen: | ||
Entergy Operations, Waterford 3, on March 21, 1991 submitted a response to the NRC , let ter W3F1 0227, describing an alternative approach for the restoration of the emergency diesel generators after an Silo. The letter in part str.ted that OP-009-002 would be revised to incorporate information about maintenance of the portable air compressor. In lieu of incorporating maintenance requirements into un operations procedure, periodic testing of the diesel to ensure continued operability will be defined and performed by preventative maintenance tasks. The portable air compressor was tested on April 4,1991, for capacity and operability. Preventative maintenance tasks for the portable air compressor will be established by July 1, 1991. | Entergy Operations, Waterford 3, on March 21, 1991 submitted a response to the NRC, let ter W3F1 0227, describing an alternative approach for the restoration of the emergency diesel generators after an Silo. The letter in part str.ted that OP-009-002 would be revised to incorporate information about maintenance of the portable air compressor. In lieu of incorporating maintenance requirements into un operations procedure, periodic testing of the diesel to ensure continued operability will be defined and performed by preventative maintenance tasks. The portable air compressor was tested on April 4,1991, for capacity and operability. Preventative maintenance tasks for the portable air compressor will be established by July 1, 1991. | ||
please contact me or Robert J. Murillo should there be any questions regarding this letter. | please contact me or Robert J. Murillo should there be any questions regarding this letter. | ||
Very truly yours, | Very truly yours, | ||
( | ( | ||
ht,aI RFB/RJh/de ec: | |||
Messrs. R.D. Martin, NRC Region IV D.L. Wigginton, NRC-NRR E.L. Blake i | |||
R.B. McGehee N.S. Reynolds NRC Resident inspectors kip 2[ DOCK 0500033; 0193 919334 A; | |||
N p | |||
3 PDR}} | |||
Latest revision as of 12:46, 13 December 2024
| ML20091A854 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 05/14/1991 |
| From: | Burski R ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| W3F1-91-0295, W3F1-91-295, NUDOCS 9105220193 | |
| Download: ML20091A854 (1) | |
Text
/
A Kntergy Opermbons,inc.
-w~r= ENTERGY
&y--
er r-r n.r.nur ki W31t!-Ul-0295 A4.06 QA May 14, 1991 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Station Blackout (Silo)
Gentlemen:
Entergy Operations, Waterford 3, on March 21, 1991 submitted a response to the NRC, let ter W3F1 0227, describing an alternative approach for the restoration of the emergency diesel generators after an Silo. The letter in part str.ted that OP-009-002 would be revised to incorporate information about maintenance of the portable air compressor. In lieu of incorporating maintenance requirements into un operations procedure, periodic testing of the diesel to ensure continued operability will be defined and performed by preventative maintenance tasks. The portable air compressor was tested on April 4,1991, for capacity and operability. Preventative maintenance tasks for the portable air compressor will be established by July 1, 1991.
please contact me or Robert J. Murillo should there be any questions regarding this letter.
Very truly yours,
(
ht,aI RFB/RJh/de ec:
Messrs. R.D. Martin, NRC Region IV D.L. Wigginton, NRC-NRR E.L. Blake i
R.B. McGehee N.S. Reynolds NRC Resident inspectors kip 2[ DOCK 0500033; 0193 919334 A;
N p
3 PDR