ML20091J864: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- | {{#Wiki_filter:- | ||
s gA m'.d !!. ;1 Arizona Public Service Company | s gA m'.d !!. ;1 Arizona Public Service Company PHOENIX. ARIZONA 8p' 6 _ I P.o box 21666 | ||
* q,. | |||
n- | ,r n- | ||
~ | |||
May 25, 19'84 ANPP-29603-TDS/TRB U. S. Nuclear Regulatorf Commission Region V Creekside Oaks Office Park 1450 Maria I,ane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs | May 25, 19'84 ANPP-29603-TDS/TRB U. S. Nuclear Regulatorf Commission Region V Creekside Oaks Office Park 1450 Maria I,ane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs | ||
| Line 28: | Line 29: | ||
==Dear Sir:== | ==Dear Sir:== | ||
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B). | The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B). | ||
At that time, it was estimated that a Final Report would be availabic by May 29, 1984. | At that time, it was estimated that a Final Report would be availabic by May 29, 1984. | ||
| Line 34: | Line 34: | ||
There in no new information or change to the Interim Report at this time. | There in no new information or change to the Interim Report at this time. | ||
Very truly yours,. | Very truly yours,. | ||
c( c[ | c( c[ | ||
E. E. Van Brunt , Jr. | / | ||
APS Vice President Nuclear Production ANPP Project Director EEVB/TRBtdb cet See Page Two 0406060229 040525 PDH ADOCK 05000520 B | ) | ||
(LLL d -itR [N - | |||
E. E. Van Brunt, Jr. | |||
APS Vice President Nuclear Production ANPP Project Director EEVB/TRBtdb cet See Page Two 0406060229 040525 PDH ADOCK 05000520 B | |||
POR | |||
,p 7 e | |||
g Mr. T. W. Bishop DER 84-11 Page Two cet | g Mr. T. W. Bishop DER 84-11 Page Two cet Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr. | ||
D. B. Karner W. E. Ide D. B. Fasnacht | D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers B. S. Kaplan L. A. Souza D. E. Fowler J. Vorees J. R. Bynum J. M. Allen P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Pattersca R. W. W'lcher e | ||
A. C. Rogers B. S. Kaplan L. A. Souza D. E. Fowler J. Vorees J. R. Bynum J. M. Allen P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Pattersca R. W. W'lcher e | |||
H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiore111 S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339 | H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiore111 S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339 | ||
- -}} | |||
Latest revision as of 12:15, 13 December 2024
| ML20091J864 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 05/25/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-29603-TDS, DER-84-11, NUDOCS 8406060229 | |
| Download: ML20091J864 (2) | |
Text
-
s gA m'.d !!. ;1 Arizona Public Service Company PHOENIX. ARIZONA 8p' 6 _ I P.o box 21666
- q,.
,r n-
~
May 25, 19'84 ANPP-29603-TDS/TRB U. S. Nuclear Regulatorf Commission Region V Creekside Oaks Office Park 1450 Maria I,ane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Subject:
Time Extension For Report - DER 84-11 A 50.55(e) Potentially Reportable Deficiency Relating To Conduit Used In PVMP Instrumentation Is Contaminated.
File 84-019-026; D.4.33.2 References (A) Telephone conversation between P. Johnson and T. Bradish on March 8, 1984.
(B) ANPP-29213, dated April 3, 1984 (Interim Report)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).
At that time, it was estimated that a Final Report would be availabic by May 29, 1984.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by August 31, 1984, a t which time a complete report will be submitted.
There in no new information or change to the Interim Report at this time.
Very truly yours,.
c( c[
/
)
(LLL d -itR [N -
E. E. Van Brunt, Jr.
APS Vice President Nuclear Production ANPP Project Director EEVB/TRBtdb cet See Page Two 0406060229 040525 PDH ADOCK 05000520 B
POR
,p 7 e
g Mr. T. W. Bishop DER 84-11 Page Two cet Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers B. S. Kaplan L. A. Souza D. E. Fowler J. Vorees J. R. Bynum J. M. Allen P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Pattersca R. W. W'lcher e
H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiore111 S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339
- -