U-602516, Revises Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs. Core Shroud Insps Will Be Performed During Refueling Outage 7 Scheduled for Mar 1998: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:. . . . .
{{#Wiki_filter:.....
gg     - g 1
gg
                                                                                                    .w.   ..n a Ininois Power Cornpeny Chnton Power Staton P.O. Som 678
- g 1
      ,                                                                                          Cthton. IL 61727
.w.
.                                                                                                Tel 217 935 5623 Fas 217 935 4632 Johti G. Cook Vice President ILLIN9IS                                                                                 u.602516 PGMR                                                 JGC-494-95                     L30 95(11 22 )LP Novaraber 22, 1995             80.120 Docket No. 50-461 Document ControlDesk                                                                                             3 Nuclear Regulatory Commission                                                                                     j Washington,D.C. 20555                                                                                             !
..n a
Ininois Power Cornpeny Chnton Power Staton P.O. Som 678 Cthton. IL 61727 Tel 217 935 5623 Fas 217 935 4632 Johti G. Cook Vice President ILLIN9IS u.602516 PGMR JGC-494-95 L30 95(11 22 )LP Novaraber 22, 1995 80.120 Docket No. 50-461 Document ControlDesk 3
Nuclear Regulatory Commission j
Washington,D.C. 20555


==Subject:==
==Subject:==
Illinois Power's (IP's), Clinton Power Station's (CPS's) Revised                         !
Illinois Power's (IP's), Clinton Power Station's (CPS's) Revised Response to Generic Letter (GL) 94-03, "Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reacton" Dcar Sir:
Response to Generic Letter (GL) 94-03, "Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reacton" Dcar Sir:                 .
IP provided its GL 94-03 response to the NRC in letters U-602364, dated i
IP provided its GL 94-03 response to the NRC in letters U-602364, dated                                 i September 24,1994 and U-602369 dated December 14,1994. The purpose of this letter                               )
September 24,1994 and U-602369 dated December 14,1994. The purpose of this letter
is to revise IP's response to the NRC regarding when the CPS core shroud will be                                 ,
)
inspected. IP committed, in letter U-602369 to inspect the core shroud during the sixth                           !
is to revise IP's response to the NRC regarding when the CPS core shroud will be inspected. IP committed, in letter U-602369 to inspect the core shroud during the sixth refueling outage (RF-6) scheduled for October 1996.
refueling outage (RF-6) scheduled for October 1996.                                            .
On September 2,1994, the BWR Vessels & Internals Project (BWRVIP) initiated GENE-523-113-0894, "BWR Core Shroud Inspection and Flaw Evaluation Guidelines."
On September 2,1994, the BWR Vessels & Internals Project (BWRVIP) initiated GENE-523-113-0894, "BWR Core Shroud Inspection and Flaw Evaluation Guidelines."
This document listed CPS as a Category "A" plant. The plant characteristics for this category are 304L plants (plants with 304L stainless steel, carbon content 0.04 wt.% or less, as the shroud base material) with less than 8 hot operating years and an average conductivity at or below 0.30 S/cm during the first 5 cycles ofoperation. Presently, the calculated hot operation years at CPS at the start of RF-6 will be 7.63 years (revised from the 7.96 years in U-602369), and the average conductivity during the first five operating cycles is 0.186 S/cm, thus categorizing CPS as a Category "A" plant. GENE-523-113-0894 states that such plants have shown very low likelihood of cracking, demonstrated by                         !
This document listed CPS as a Category "A" plant. The plant characteristics for this category are 304L plants (plants with 304L stainless steel, carbon content 0.04 wt.% or less, as the shroud base material) with less than 8 hot operating years and an average conductivity at or below 0.30 S/cm during the first 5 cycles ofoperation. Presently, the calculated hot operation years at CPS at the start of RF-6 will be 7.63 years (revised from the 7.96 years in U-602369), and the average conductivity during the first five operating cycles is 0.186 S/cm, thus categorizing CPS as a Category "A" plant. GENE-523-113-0894 states that such plants have shown very low likelihood of cracking, demonstrated by field experience with the shroud and other components; therefore, an inspection is not necessary.
field experience with the shroud and other components; therefore, an inspection is not                           !
The NRC letter, " Evaluation of'BWR Shroud Cracking Generic Safety Assessment, Revision 1,' GENE-523-A107P-0794, August 5,1994 and 'BWR Core Shroud Inspection and Evaluation Guidelines,' GENE-523-113-0894, September 2,1994,"
necessary.
to Mr. J. T. Beckman, Chairman BWR/ VIP, acknowledged agreement with the categorization of BWR plants into three groups (Category A, B, or C) and with the proposed guidance for establishing schedules for the inspection of Category A and B plants.
l The NRC letter, " Evaluation of'BWR Shroud Cracking Generic Safety Assessment, Revision 1,' GENE-523-A107P-0794, August 5,1994 and 'BWR Core Shroud Inspection and Evaluation Guidelines,' GENE-523-113-0894, September 2,1994,"
j
to Mr. J. T. Beckman, Chairman BWR/ VIP, acknowledged agreement with the categorization of BWR plants into three groups (Category A, B, or C) and with the proposed guidance for establishing schedules for the inspection of Category A and B plants.                                                                                                 j rnnnn.
;gA21gggggggggggt gs rnnnn.
                          ;gA21gggggggggggt                                                                         gs     i G
i G


                                    . . . . . . . . = - . = . . . . - - - - - - ~ ~ ~ ~                   - - '            -~ ~ -* * - - -
.,,12/06/95.
            . , ,12/06/95.
..08:09 IL PWR CLINTON
                                ..08:09            IL PWR CLINTON
* 3014153061
* 3014153061                                                        to.230 903 6-                                                                            -              -
........ = -. =.... - - - - - - ~ ~ ~ ~
                  '~
-~ ~ -* * - - -
: o.                                                            .
to.230 903 6-
              -                                                                                              U-602516 Page 2                             .l l
'~
l Based on the information contained herein, CPS will not conduct an inspection                                   I l                         during RF-6. The core shroud inspections documented in our response to GL 94-03 will                                   i instead be performed during RF-7 scheduled for March 1998.                                                               1 Attachment 1 provides an affidavit supporting the facts set forth in this letter.
o.
\                                                                                                                                                   .
U-602516 Page 2
Sincerely yours,                                         !
.l l
i                                                                                          G. ook                                                 i ice President                                           l JSP/csm Anachment i
Based on the information contained herein, CPS will not conduct an inspection l
cc:   NRC Clinton Licensing Project Manager                                                                           .
during RF-6. The core shroud inspections documented in our response to GL 94-03 will i
NRC Resident Office, V-690 Regional Administrator, Region III, USNRC I
instead be performed during RF-7 scheduled for March 1998.
, provides an affidavit supporting the facts set forth in this letter.
\\
Sincerely yours, i
G. ook i
ice President l
JSP/csm Anachment i
cc:
NRC Clinton Licensing Project Manager NRC Resident Office, V-690 Regional Administrator, Region III, USNRC I
Illinois Department ofNuclear Safety i
Illinois Department ofNuclear Safety i
l l
l l
i i
i j
j i
i


12/06/95       08:10       IL PWR CLINTON
12/06/95 08:10 IL PWR CLINTON
* 50141W;21                                           g, g g s
* 50141W;21 g, g g
Attachment 1 to U-602516         !
s to U-602516 I
I J. G. Cook, being first duly sworn, deposes and says: That heis Vice President of the Nuclear Program at Illinois Power (IP), Clinton Power Station (CPS); that this letter           ,
J. G. Cook, being first duly sworn, deposes and says: That heis Vice President of the Nuclear Program at Illinois Power (IP), Clinton Power Station (CPS); that this letter supplying IP's response to Generic Isnter 94-03 has been prepared under his supervision and direction; that he knows the contents thereof; and that to the best of his knowledge j
supplying IP's response to Generic Isnter 94-03 has been prepared under his supervision j
and belief said letter and the facts contained therein are true and correct.
and direction; that he knows the contents thereof; and that to the best of his knowledge and belief said letter and the facts contained therein are true and correct.
i Date: This JA_ day ofNovember 1995.
i Date: This JA_ day ofNovember 1995.
Signed:
Signed:
J.G. Cook I
J.G. Cook I
STATE OF IIIINOIS             l SS.           ,
STATE OF IIIINOIS l SS.
* 0mCW.8ER"             '
* 0mCW.8ER" e
e          m asa s. m 7b //- COUNIY                 j                   My         hy
m asa s. m 7b //- COUNIY j
                                                              ':: = :::::_:: ,,       _,;
My hy
':: = :::::_::,,
Subscribed and sworn to before me this Ag_ day ofNovember 1995.
Subscribed and sworn to before me this Ag_ day ofNovember 1995.
id]$.:_.. 6.SAY (Notary Public)//
id]$.:_.. 6.SAY (Notary Public)//
                                                                  .}}
.}}

Latest revision as of 08:46, 13 December 2024

Revises Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs. Core Shroud Insps Will Be Performed During Refueling Outage 7 Scheduled for Mar 1998
ML20095C959
Person / Time
Site: Clinton 
Issue date: 11/22/1995
From: Jackie Cook
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-94-03, GL-94-3, JGC-494-95, U-602516, NUDOCS 9512120386
Download: ML20095C959 (3)


Text

.....

gg

- g 1

.w.

..n a

Ininois Power Cornpeny Chnton Power Staton P.O. Som 678 Cthton. IL 61727 Tel 217 935 5623 Fas 217 935 4632 Johti G. Cook Vice President ILLIN9IS u.602516 PGMR JGC-494-95 L30 95(11 22 )LP Novaraber 22, 1995 80.120 Docket No. 50-461 Document ControlDesk 3

Nuclear Regulatory Commission j

Washington,D.C. 20555

Subject:

Illinois Power's (IP's), Clinton Power Station's (CPS's) Revised Response to Generic Letter (GL) 94-03, "Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reacton" Dcar Sir:

IP provided its GL 94-03 response to the NRC in letters U-602364, dated i

September 24,1994 and U-602369 dated December 14,1994. The purpose of this letter

)

is to revise IP's response to the NRC regarding when the CPS core shroud will be inspected. IP committed, in letter U-602369 to inspect the core shroud during the sixth refueling outage (RF-6) scheduled for October 1996.

On September 2,1994, the BWR Vessels & Internals Project (BWRVIP) initiated GENE-523-113-0894, "BWR Core Shroud Inspection and Flaw Evaluation Guidelines."

This document listed CPS as a Category "A" plant. The plant characteristics for this category are 304L plants (plants with 304L stainless steel, carbon content 0.04 wt.% or less, as the shroud base material) with less than 8 hot operating years and an average conductivity at or below 0.30 S/cm during the first 5 cycles ofoperation. Presently, the calculated hot operation years at CPS at the start of RF-6 will be 7.63 years (revised from the 7.96 years in U-602369), and the average conductivity during the first five operating cycles is 0.186 S/cm, thus categorizing CPS as a Category "A" plant. GENE-523-113-0894 states that such plants have shown very low likelihood of cracking, demonstrated by field experience with the shroud and other components; therefore, an inspection is not necessary.

The NRC letter, " Evaluation of'BWR Shroud Cracking Generic Safety Assessment, Revision 1,' GENE-523-A107P-0794, August 5,1994 and 'BWR Core Shroud Inspection and Evaluation Guidelines,' GENE-523-113-0894, September 2,1994,"

to Mr. J. T. Beckman, Chairman BWR/ VIP, acknowledged agreement with the categorization of BWR plants into three groups (Category A, B, or C) and with the proposed guidance for establishing schedules for the inspection of Category A and B plants.

j

gA21gggggggggggt gs rnnnn.

i G

.,,12/06/95.

..08:09 IL PWR CLINTON

  • 3014153061

........ = -. =.... - - - - - - ~ ~ ~ ~

-~ ~ -* * - - -

to.230 903 6-

'~

o.

U-602516 Page 2

.l l

Based on the information contained herein, CPS will not conduct an inspection l

during RF-6. The core shroud inspections documented in our response to GL 94-03 will i

instead be performed during RF-7 scheduled for March 1998.

, provides an affidavit supporting the facts set forth in this letter.

\\

Sincerely yours, i

G. ook i

ice President l

JSP/csm Anachment i

cc:

NRC Clinton Licensing Project Manager NRC Resident Office, V-690 Regional Administrator, Region III, USNRC I

Illinois Department ofNuclear Safety i

l l

i j

i

12/06/95 08:10 IL PWR CLINTON

  • 50141W;21 g, g g

s to U-602516 I

J. G. Cook, being first duly sworn, deposes and says: That heis Vice President of the Nuclear Program at Illinois Power (IP), Clinton Power Station (CPS); that this letter supplying IP's response to Generic Isnter 94-03 has been prepared under his supervision and direction; that he knows the contents thereof; and that to the best of his knowledge j

and belief said letter and the facts contained therein are true and correct.

i Date: This JA_ day ofNovember 1995.

Signed:

J.G. Cook I

STATE OF IIIINOIS l SS.

  • 0mCW.8ER" e

m asa s. m 7b //- COUNIY j

My hy

':: = :::::_::,,

Subscribed and sworn to before me this Ag_ day ofNovember 1995.

id]$.:_.. 6.SAY (Notary Public)//

.