U-602516, Revises Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs. Core Shroud Insps Will Be Performed During Refueling Outage 7 Scheduled for Mar 1998: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. . . . . | {{#Wiki_filter:..... | ||
gg | gg | ||
- g 1 | |||
.w. | |||
..n a | |||
Ininois Power Cornpeny Chnton Power Staton P.O. Som 678 Cthton. IL 61727 Tel 217 935 5623 Fas 217 935 4632 Johti G. Cook Vice President ILLIN9IS u.602516 PGMR JGC-494-95 L30 95(11 22 )LP Novaraber 22, 1995 80.120 Docket No. 50-461 Document ControlDesk 3 | |||
Nuclear Regulatory Commission j | |||
Washington,D.C. 20555 | |||
==Subject:== | ==Subject:== | ||
Illinois Power's (IP's), Clinton Power Station's (CPS's) Revised | Illinois Power's (IP's), Clinton Power Station's (CPS's) Revised Response to Generic Letter (GL) 94-03, "Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reacton" Dcar Sir: | ||
Response to Generic Letter (GL) 94-03, "Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reacton" Dcar Sir: | IP provided its GL 94-03 response to the NRC in letters U-602364, dated i | ||
IP provided its GL 94-03 response to the NRC in letters U-602364, dated | September 24,1994 and U-602369 dated December 14,1994. The purpose of this letter | ||
is to revise IP's response to the NRC regarding when the CPS core shroud will be | ) | ||
inspected. IP committed, in letter U-602369 to inspect the core shroud during the sixth | is to revise IP's response to the NRC regarding when the CPS core shroud will be inspected. IP committed, in letter U-602369 to inspect the core shroud during the sixth refueling outage (RF-6) scheduled for October 1996. | ||
refueling outage (RF-6) scheduled for October 1996 | |||
On September 2,1994, the BWR Vessels & Internals Project (BWRVIP) initiated GENE-523-113-0894, "BWR Core Shroud Inspection and Flaw Evaluation Guidelines." | On September 2,1994, the BWR Vessels & Internals Project (BWRVIP) initiated GENE-523-113-0894, "BWR Core Shroud Inspection and Flaw Evaluation Guidelines." | ||
This document listed CPS as a Category "A" plant. The plant characteristics for this category are 304L plants (plants with 304L stainless steel, carbon content 0.04 wt.% or less, as the shroud base material) with less than 8 hot operating years and an average conductivity at or below 0.30 S/cm during the first 5 cycles ofoperation. Presently, the calculated hot operation years at CPS at the start of RF-6 will be 7.63 years (revised from the 7.96 years in U-602369), and the average conductivity during the first five operating cycles is 0.186 S/cm, thus categorizing CPS as a Category "A" plant. GENE-523-113-0894 states that such plants have shown very low likelihood of cracking, demonstrated by | This document listed CPS as a Category "A" plant. The plant characteristics for this category are 304L plants (plants with 304L stainless steel, carbon content 0.04 wt.% or less, as the shroud base material) with less than 8 hot operating years and an average conductivity at or below 0.30 S/cm during the first 5 cycles ofoperation. Presently, the calculated hot operation years at CPS at the start of RF-6 will be 7.63 years (revised from the 7.96 years in U-602369), and the average conductivity during the first five operating cycles is 0.186 S/cm, thus categorizing CPS as a Category "A" plant. GENE-523-113-0894 states that such plants have shown very low likelihood of cracking, demonstrated by field experience with the shroud and other components; therefore, an inspection is not necessary. | ||
field experience with the shroud and other components; therefore, an inspection is not | The NRC letter, " Evaluation of'BWR Shroud Cracking Generic Safety Assessment, Revision 1,' GENE-523-A107P-0794, August 5,1994 and 'BWR Core Shroud Inspection and Evaluation Guidelines,' GENE-523-113-0894, September 2,1994," | ||
necessary. | to Mr. J. T. Beckman, Chairman BWR/ VIP, acknowledged agreement with the categorization of BWR plants into three groups (Category A, B, or C) and with the proposed guidance for establishing schedules for the inspection of Category A and B plants. | ||
j | |||
to Mr. J. T. Beckman, Chairman BWR/ VIP, acknowledged agreement with the categorization of BWR plants into three groups (Category A, B, or C) and with the proposed guidance for establishing schedules for the inspection of Category A and B plants. | ;gA21gggggggggggt gs rnnnn. | ||
i G | |||
.,,12/06/95. | |||
..08:09 IL PWR CLINTON | |||
* 3014153061 | |||
........ = -. =.... - - - - - - ~ ~ ~ ~ | |||
-~ ~ -* * - - - | |||
to.230 903 6- | |||
'~ | |||
o. | |||
\ | U-602516 Page 2 | ||
Sincerely yours, | .l l | ||
Based on the information contained herein, CPS will not conduct an inspection l | |||
cc: | during RF-6. The core shroud inspections documented in our response to GL 94-03 will i | ||
NRC Resident Office, V-690 Regional Administrator, Region III, USNRC I | instead be performed during RF-7 scheduled for March 1998. | ||
, provides an affidavit supporting the facts set forth in this letter. | |||
\\ | |||
Sincerely yours, i | |||
G. ook i | |||
ice President l | |||
JSP/csm Anachment i | |||
cc: | |||
NRC Clinton Licensing Project Manager NRC Resident Office, V-690 Regional Administrator, Region III, USNRC I | |||
Illinois Department ofNuclear Safety i | Illinois Department ofNuclear Safety i | ||
l l | l l | ||
i | i j | ||
i | |||
12/06/95 | 12/06/95 08:10 IL PWR CLINTON | ||
* 50141W;21 | * 50141W;21 g, g g | ||
s to U-602516 I | |||
J. G. Cook, being first duly sworn, deposes and says: That heis Vice President of the Nuclear Program at Illinois Power (IP), Clinton Power Station (CPS); that this letter supplying IP's response to Generic Isnter 94-03 has been prepared under his supervision and direction; that he knows the contents thereof; and that to the best of his knowledge j | |||
supplying IP's response to Generic Isnter 94-03 has been prepared under his supervision | and belief said letter and the facts contained therein are true and correct. | ||
and direction; that he knows the contents thereof; and that to the best of his knowledge and belief said letter and the facts contained therein are true and correct. | |||
i Date: This JA_ day ofNovember 1995. | i Date: This JA_ day ofNovember 1995. | ||
Signed: | Signed: | ||
J.G. Cook I | J.G. Cook I | ||
STATE OF IIIINOIS | STATE OF IIIINOIS l SS. | ||
* 0mCW.8ER" | * 0mCW.8ER" e | ||
m asa s. m 7b //- COUNIY j | |||
My hy | |||
':: = :::::_::,, | |||
Subscribed and sworn to before me this Ag_ day ofNovember 1995. | Subscribed and sworn to before me this Ag_ day ofNovember 1995. | ||
id]$.:_.. 6.SAY (Notary Public)// | id]$.:_.. 6.SAY (Notary Public)// | ||
.}} | |||
Latest revision as of 08:46, 13 December 2024
| ML20095C959 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 11/22/1995 |
| From: | Jackie Cook ILLINOIS POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-94-03, GL-94-3, JGC-494-95, U-602516, NUDOCS 9512120386 | |
| Download: ML20095C959 (3) | |
Text
.....
gg
- g 1
.w.
..n a
Ininois Power Cornpeny Chnton Power Staton P.O. Som 678 Cthton. IL 61727 Tel 217 935 5623 Fas 217 935 4632 Johti G. Cook Vice President ILLIN9IS u.602516 PGMR JGC-494-95 L30 95(11 22 )LP Novaraber 22, 1995 80.120 Docket No. 50-461 Document ControlDesk 3
Nuclear Regulatory Commission j
Washington,D.C. 20555
Subject:
Illinois Power's (IP's), Clinton Power Station's (CPS's) Revised Response to Generic Letter (GL) 94-03, "Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reacton" Dcar Sir:
IP provided its GL 94-03 response to the NRC in letters U-602364, dated i
September 24,1994 and U-602369 dated December 14,1994. The purpose of this letter
)
is to revise IP's response to the NRC regarding when the CPS core shroud will be inspected. IP committed, in letter U-602369 to inspect the core shroud during the sixth refueling outage (RF-6) scheduled for October 1996.
On September 2,1994, the BWR Vessels & Internals Project (BWRVIP) initiated GENE-523-113-0894, "BWR Core Shroud Inspection and Flaw Evaluation Guidelines."
This document listed CPS as a Category "A" plant. The plant characteristics for this category are 304L plants (plants with 304L stainless steel, carbon content 0.04 wt.% or less, as the shroud base material) with less than 8 hot operating years and an average conductivity at or below 0.30 S/cm during the first 5 cycles ofoperation. Presently, the calculated hot operation years at CPS at the start of RF-6 will be 7.63 years (revised from the 7.96 years in U-602369), and the average conductivity during the first five operating cycles is 0.186 S/cm, thus categorizing CPS as a Category "A" plant. GENE-523-113-0894 states that such plants have shown very low likelihood of cracking, demonstrated by field experience with the shroud and other components; therefore, an inspection is not necessary.
The NRC letter, " Evaluation of'BWR Shroud Cracking Generic Safety Assessment, Revision 1,' GENE-523-A107P-0794, August 5,1994 and 'BWR Core Shroud Inspection and Evaluation Guidelines,' GENE-523-113-0894, September 2,1994,"
to Mr. J. T. Beckman, Chairman BWR/ VIP, acknowledged agreement with the categorization of BWR plants into three groups (Category A, B, or C) and with the proposed guidance for establishing schedules for the inspection of Category A and B plants.
j
- gA21gggggggggggt gs rnnnn.
i G
.,,12/06/95.
..08:09 IL PWR CLINTON
- 3014153061
........ = -. =.... - - - - - - ~ ~ ~ ~
-~ ~ -* * - - -
to.230 903 6-
'~
o.
U-602516 Page 2
.l l
Based on the information contained herein, CPS will not conduct an inspection l
during RF-6. The core shroud inspections documented in our response to GL 94-03 will i
instead be performed during RF-7 scheduled for March 1998.
, provides an affidavit supporting the facts set forth in this letter.
\\
Sincerely yours, i
G. ook i
ice President l
JSP/csm Anachment i
cc:
NRC Clinton Licensing Project Manager NRC Resident Office, V-690 Regional Administrator, Region III, USNRC I
Illinois Department ofNuclear Safety i
l l
i j
i
12/06/95 08:10 IL PWR CLINTON
- 50141W;21 g, g g
s to U-602516 I
J. G. Cook, being first duly sworn, deposes and says: That heis Vice President of the Nuclear Program at Illinois Power (IP), Clinton Power Station (CPS); that this letter supplying IP's response to Generic Isnter 94-03 has been prepared under his supervision and direction; that he knows the contents thereof; and that to the best of his knowledge j
and belief said letter and the facts contained therein are true and correct.
i Date: This JA_ day ofNovember 1995.
Signed:
J.G. Cook I
STATE OF IIIINOIS l SS.
- 0mCW.8ER" e
m asa s. m 7b //- COUNIY j
My hy
':: = :::::_::,,
Subscribed and sworn to before me this Ag_ day ofNovember 1995.
id]$.:_.. 6.SAY (Notary Public)//
.