DOCKET NO. 50-271 DATE 951210 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 REPORT MONTH   November
DOCKET NO. 50-271 DATE 951210 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 REPORT MONTH November


==SUMMARY==
==SUMMARY==
Line 27: Line 27:
At the beginning of the reporting period the plant was operating at 99.9%
At the beginning of the reporting period the plant was operating at 99.9%
of rated thermal power.
of rated thermal power.
951107   At 0035 hours, initiated a power reduction to less than 80%, to perform turbine bypass valve tests, MSIV full closure tests, a rod pattern exchange, and single rod scram testing.   (See Unit Shutdowns and Power Reductions) 951107   At 0111 hours, initiated turbine bypass valve testing.
951107 At 0035 hours, initiated a power reduction to less than 80%, to perform turbine bypass valve tests, MSIV full closure tests, a rod pattern exchange, and single rod scram testing.
951107   At 0124 hours, completed turbine bypass valve testing. Reducing       l power to 69.5%, to perform MSIV full closure tests, a rod pattern exchange, and single red scram testing.
(See Unit Shutdowns and Power Reductions) 951107 At 0111 hours, initiated turbine bypass valve testing.
951107   At 0135 hours, initiated MSIV full closure testing.
951107 At 0124 hours, completed turbine bypass valve testing.
95A107   At 0158 hours, completed MSIV full closure testing.
Reducing power to 69.5%, to perform MSIV full closure tests, a rod pattern exchange, and single red scram testing.
951107   At 0210 hours, initiated a rod pattern exchange.
951107 At 0135 hours, initiated MSIV full closure testing.
951107   At 0317 hours, initiated single rod scram testing.
95A107 At 0158 hours, completed MSIV full closure testing.
951107   At 0345 hours, completed the rod pattern exchange.
951107 At 0210 hours, initiated a rod pattern exchange.
951107   At 0620 hours, completed single rod scram testing.
951107 At 0317 hours, initiated single rod scram testing.
951107   At 0645 hours, initiated a return to full power.
951107 At 0345 hours, completed the rod pattern exchange.
951107 At 0620 hours, completed single rod scram testing.
951107 At 0645 hours, initiated a return to full power.
At the end of the reporting period the plant was operating at 99.9% of rated thermal power.
At the end of the reporting period the plant was operating at 99.9% of rated thermal power.
VYDPF 0411.04 DP 0411 Rev. 6         9512190160 951213 Page 1 of 1             kDR ADOCK0500gg{1 RT No. 13.F01.13X}}
VYDPF 0411.04 DP 0411 Rev. 6 9512190160 951213 Page 1 of 1 kDR ADOCK0500gg{1 RT No. 13.F01.13X}}

Latest revision as of 08:33, 13 December 2024

Last Page of Monthly Operating Rept for Nov 1995 for Vermont Yankee
ML20095F660
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 11/30/1995
From: Wallin G
VERMONT YANKEE NUCLEAR POWER CORP.
To:
Shared Package
ML20095F657 List:
References
NUDOCS 9512190160
Download: ML20095F660 (1)


Text

- 7_..

/*

DOCKET NO. 50-271 DATE 951210 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 REPORT MONTH November

SUMMARY

OF OPERATING EXPERIENCES Hichlichts Varmont Yankee operated at 99.6% of rated thermal power for the month.

Gross electrical generation was 394.795 MWHe or 100.4% design electrical c;pacity.

Oceratina Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:

At the beginning of the reporting period the plant was operating at 99.9%

of rated thermal power.

951107 At 0035 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br />, initiated a power reduction to less than 80%, to perform turbine bypass valve tests, MSIV full closure tests, a rod pattern exchange, and single rod scram testing.

(See Unit Shutdowns and Power Reductions) 951107 At 0111 hours0.00128 days <br />0.0308 hours <br />1.835317e-4 weeks <br />4.22355e-5 months <br />, initiated turbine bypass valve testing.

951107 At 0124 hours0.00144 days <br />0.0344 hours <br />2.050265e-4 weeks <br />4.7182e-5 months <br />, completed turbine bypass valve testing.

Reducing power to 69.5%, to perform MSIV full closure tests, a rod pattern exchange, and single red scram testing.

951107 At 0135 hours0.00156 days <br />0.0375 hours <br />2.232143e-4 weeks <br />5.13675e-5 months <br />, initiated MSIV full closure testing.

95A107 At 0158 hours0.00183 days <br />0.0439 hours <br />2.612434e-4 weeks <br />6.0119e-5 months <br />, completed MSIV full closure testing.

951107 At 0210 hours0.00243 days <br />0.0583 hours <br />3.472222e-4 weeks <br />7.9905e-5 months <br />, initiated a rod pattern exchange.

951107 At 0317 hours0.00367 days <br />0.0881 hours <br />5.241402e-4 weeks <br />1.206185e-4 months <br />, initiated single rod scram testing.

951107 At 0345 hours0.00399 days <br />0.0958 hours <br />5.704365e-4 weeks <br />1.312725e-4 months <br />, completed the rod pattern exchange.

951107 At 0620 hours0.00718 days <br />0.172 hours <br />0.00103 weeks <br />2.3591e-4 months <br />, completed single rod scram testing.

951107 At 0645 hours0.00747 days <br />0.179 hours <br />0.00107 weeks <br />2.454225e-4 months <br />, initiated a return to full power.

At the end of the reporting period the plant was operating at 99.9% of rated thermal power.