ML20098G849: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _
{{#Wiki_filter:___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _
L   .
L MCayyy 80C Arizona Public Service Comimy
MCayyy 80C Arizona Public Service Comimy
% SEP 2I hn3:he-September 18, 1984 CilVI.
                                                                                                                                % SEP 2I hn3:he-September 18, 1984             CilVI.
ANPP-30548-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Of fice Park 1450 Maria Lane - Suite 210 Walnut Creek, Calif ornia 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineezing Programs
ANPP-30548-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Of fice Park 1450 Maria Lane - Suite 210 Walnut Creek, Calif ornia 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineezing Programs


Line 31: Line 30:


==Dear Sir:==
==Dear Sir:==
The NRC was notified of a potentially reportable deficiency in Ref erence ( A), an Interim Report was transmitted by Ref erence (B), and Time Extensions were requested by Ref erences (C), (D), (E), and (F). At that time, it was estimated that a Final Report would be available by September 19, 1984 Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by October 10, 1984, at which tin.c a complete report eill be submitted.
The NRC was notified of a potentially reportable deficiency in Ref erence ( A), an Interim Report was transmitted by Ref erence (B), and Time Extensions were requested by Ref erences (C), (D), (E), and (F). At that time, it was estimated that a Final Report would be available by September 19, 1984 Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by October 10, 1984, at which tin.c a complete report eill be submitted.
There is no new inf ormation or change to the Interim Report at this time.
There is no new inf ormation or change to the Interim Report at this time.
Very truly yourn, Cm            M O
Very truly yourn, O
                                                                                                                                  >(hp-E. E. Van B runt , J r.
>(hp-Cm M
041005g9                                                       0                              APS Vice President PDR AD       0                                                                                Nucicar Production PDR U                                                                                             ANPP Project Director EEVn/ Tan /nj cc   See Page Two                                                                                                               j
E. E. Van B runt, J r.
041005g9 APS Vice President 0
0 PDR AD PDR Nucicar Production U
ANPP Project Director EEVn/ Tan /nj cc See Page Two j


Mr. T. W. Bishop DER 84-09 Page Two cc:       Richard DeYoung, Director Office of Inspection and Enf orcement U. S. Nuclear Regulatory Commicsion Washington, D. C. 20555 T. G. Woods, Jr.
Mr. T. W. Bishop DER 84-09 Page Two cc:
Richard DeYoung, Director Office of Inspection and Enf orcement U. S. Nuclear Regulatory Commicsion Washington, D. C.
20555 T. G. Woods, Jr.
D. B. Karner W. E. Ide D. B. Fasnacht A. C. Roaers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorces J. R. Bynum J. H. Allen J. A. Brand A. C. Gehr W. J. Stubbleficid W. G. Bingham R. L. Patterson R. W. Welcher
D. B. Karner W. E. Ide D. B. Fasnacht A. C. Roaers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorces J. R. Bynum J. H. Allen J. A. Brand A. C. Gehr W. J. Stubbleficid W. G. Bingham R. L. Patterson R. W. Welcher
                      !!. D. Foster                             .
!!. D. Foster D. R. llawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost I
D. R. llawkinson L. E. Vorderbrueggen R. P. Zimmerman I
L. Clyde M. Wood s s
S. R. Frost L. Clyde M. Wood s                               s T. J. Bloom Records Center Institute of Nucicar Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, CA 30339
T. J. Bloom Records Center Institute of Nucicar Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, CA 30339
  ....}}
....}}

Latest revision as of 06:52, 13 December 2024

Interim Deficiency Rept DER 84-09 Re CAD Welding for Cathodic Protection Ground Connection.Initially Reported on 840323.Due to Extensive Evaluation,Next Rept Delayed Until 841010
ML20098G849
Person / Time
Site: Palo Verde  
Issue date: 09/18/1984
From: Van Brunt E, Vann Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30548-TDS, DER-84-09, DER-84-9, NUDOCS 8410050599
Download: ML20098G849 (2)


Text

___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _

L MCayyy 80C Arizona Public Service Comimy

% SEP 2I hn3:he-September 18, 1984 CilVI.

ANPP-30548-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Of fice Park 1450 Maria Lane - Suite 210 Walnut Creek, Calif ornia 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineezing Programs

Subject:

Time Extension For Report - DER 84-09 A 50.55(e) Potentially Reportable Deficiency Relating To CAD Welding For Cathodic Protection Ground Connection.

File: 84-019-026; D.4.33.2 Ref ere nce: ( A) Telephone conversation between R. Dodds and T. Bradish on Februa ry 29, 1984 (B) ANPP-29142, dated March 23,1984 (Interim Report)

(C) ANPP-29383, dated April 30,1984 (Time Extension)

(D) ANPP-29647, dated June 4,1984 (Time Extension)

(E) ANPP-30060, dated July 27,1984 (Time Extension)

(F) ANPP-30351, dated August 29, 1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Ref erence ( A), an Interim Report was transmitted by Ref erence (B), and Time Extensions were requested by Ref erences (C), (D), (E), and (F). At that time, it was estimated that a Final Report would be available by September 19, 1984 Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by October 10, 1984, at which tin.c a complete report eill be submitted.

There is no new inf ormation or change to the Interim Report at this time.

Very truly yourn, O

>(hp-Cm M

E. E. Van B runt, J r.

041005g9 APS Vice President 0

0 PDR AD PDR Nucicar Production U

ANPP Project Director EEVn/ Tan /nj cc See Page Two j

Mr. T. W. Bishop DER 84-09 Page Two cc:

Richard DeYoung, Director Office of Inspection and Enf orcement U. S. Nuclear Regulatory Commicsion Washington, D. C.

20555 T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Roaers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorces J. R. Bynum J. H. Allen J. A. Brand A. C. Gehr W. J. Stubbleficid W. G. Bingham R. L. Patterson R. W. Welcher

!!. D. Foster D. R. llawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost I

L. Clyde M. Wood s s

T. J. Bloom Records Center Institute of Nucicar Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, CA 30339

....