{{#Wiki_filter:Wem H. Jons Ves Presdent | {{#Wiki_filter:Wem H. Jons Ves Presdent Nuclear OperaticMs Ed,f FermL2 6400 North Ome Highway i s o n ( '' * " ~* | ||
Nuclear OperaticMs FermL2 6400 North Ome Highway | |||
November 12, 1984 EF2-71999 4 | November 12, 1984 EF2-71999 4 | ||
Director of Nuclear Reactor Regulation Attention: Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555 | Director of Nuclear Reactor Regulation Attention: | ||
Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. | |||
20555 | |||
==Dear Mr. Youngblood:== | ==Dear Mr. Youngblood:== | ||
==Reference:== | ==Reference:== | ||
1) | |||
Fermi 2 NRC Docket No. 50-341 2) | |||
Detroit Edison Letter to NRC, " Schedule of Emergency Response Information System", | |||
EF2-72264, dated October 6,19 84. | EF2-72264, dated October 6,19 84. | ||
==Subject:== | ==Subject:== | ||
Completion Schedule for ERIS/SPDS As indicated to you in Reference 2 above, Detroit Edison is in the process of completing the installation and testing of Fermi 2's Safety Parameter Display System and Emergency Response Information System. Additional training for the personnel who will be utilizing these systems will also be provided. | Completion Schedule for ERIS/SPDS As indicated to you in Reference 2 above, Detroit Edison is in the process of completing the installation and testing of Fermi 2's Safety Parameter Display System and Emergency Response Information System. | ||
Additional training for the personnel who will be utilizing these systems will also be provided. | |||
With the addition of these systems, the ability of Fermi-2 to respond in an emergency situation will be enhanced. | With the addition of these systems, the ability of Fermi-2 to respond in an emergency situation will be enhanced. | ||
However, even without these systems in place, Edison has demonstrated through two successful emergency exercises that the existing equipment and procedures are adequate if they are needed. | However, even without these systems in place, Edison has demonstrated through two successful emergency exercises that the existing equipment and procedures are adequate if they are needed. | ||
8411190188 841112 PDR ADOCK 05000341 | While Edison remains committed to completing and operating these systems as expeditiously as practicable, it requests the NRC to allow the Company until December 1985 to complete the work. | ||
This date is believed consistent with the time the NRC staff has allowed other utilities in similar circumstances. | |||
This will also allow for a better utilization of resources and will avoid needless paperwork if small amounts of additional time were needed to complete this work beyond our previously identified schedules. | |||
f4 8411190188 841112 | |||
.(0 PDR ADOCK 05000341 | |||
,g F | |||
PDR 4 | |||
i | i I | ||
Mr. B. J. Youngblood EF2-71999 November 12, 1984 Page 2 If you have any further questions on this matter, please contact Mr. O. K. Earle (313) 586-4211. | |||
Sincerely, All with attachments | Sincerely, b' | ||
cc: | All with attachments f | ||
cc: | |||
Mr. P. M. Byron U | |||
Mr. M. D. | |||
Lynch USNRC Document Control Desk Washington, DC 20555 1 | |||
( | ( | ||
---.n--...- | |||
I Mr..B. J. Youngblood EF2-71999 November 7,19 84 Page 3 bec*: | |||
: t. D. Phillips M. S . Rager G. M. Trahey A. E. Wegele O. K. Earle (Bethesda Office) | F. E. Agosti L. P. Bregni W. | ||
F. Colbert O. K. Earle' W. R. | |||
Holland P. | |||
A. Marquardt | |||
: t. D. Phillips M. S. Rager G. M. Trahey A. E. Wegele O. K. Earle (Bethesda Office) | |||
Secretary's Office (2412 WCB) | Secretary's Office (2412 WCB) | ||
NRR Chron File | NRR Chron File | ||
* Restricted Distribution: ARMS Coding Only - | * Restricted Distribution: | ||
ARMS Coding Only - | |||
No Distribution Other Than As Listed Above 1 | No Distribution Other Than As Listed Above 1 | ||
i i | i i | ||
| Line 52: | Line 68: | ||
( | ( | ||
l | l | ||
-}} | |||
Latest revision as of 06:46, 13 December 2024
| ML20099B523 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 11/12/1984 |
| From: | Jens W DETROIT EDISON CO. |
| To: | Youngblood B Office of Nuclear Reactor Regulation |
| References | |
| EF2-71999, NUDOCS 8411190188 | |
| Download: ML20099B523 (3) | |
Text
Wem H. Jons Ves Presdent Nuclear OperaticMs Ed,f FermL2 6400 North Ome Highway i s o n ( * " ~*
November 12, 1984 EF2-71999 4
Director of Nuclear Reactor Regulation Attention:
Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Youngblood:
Reference:
1)
Fermi 2 NRC Docket No. 50-341 2)
Detroit Edison Letter to NRC, " Schedule of Emergency Response Information System",
EF2-72264, dated October 6,19 84.
Subject:
Completion Schedule for ERIS/SPDS As indicated to you in Reference 2 above, Detroit Edison is in the process of completing the installation and testing of Fermi 2's Safety Parameter Display System and Emergency Response Information System.
Additional training for the personnel who will be utilizing these systems will also be provided.
With the addition of these systems, the ability of Fermi-2 to respond in an emergency situation will be enhanced.
However, even without these systems in place, Edison has demonstrated through two successful emergency exercises that the existing equipment and procedures are adequate if they are needed.
While Edison remains committed to completing and operating these systems as expeditiously as practicable, it requests the NRC to allow the Company until December 1985 to complete the work.
This date is believed consistent with the time the NRC staff has allowed other utilities in similar circumstances.
This will also allow for a better utilization of resources and will avoid needless paperwork if small amounts of additional time were needed to complete this work beyond our previously identified schedules.
f4 8411190188 841112
.(0 PDR ADOCK 05000341
,g F
PDR 4
i I
Mr. B. J. Youngblood EF2-71999 November 12, 1984 Page 2 If you have any further questions on this matter, please contact Mr. O. K. Earle (313) 586-4211.
Sincerely, b'
All with attachments f
cc:
Mr. P. M. Byron U
Mr. M. D.
Lynch USNRC Document Control Desk Washington, DC 20555 1
(
---.n--...-
I Mr..B. J. Youngblood EF2-71999 November 7,19 84 Page 3 bec*:
F. E. Agosti L. P. Bregni W.
F. Colbert O. K. Earle' W. R.
Holland P.
A. Marquardt
- t. D. Phillips M. S. Rager G. M. Trahey A. E. Wegele O. K. Earle (Bethesda Office)
Secretary's Office (2412 WCB)
NRR Chron File
- Restricted Distribution:
ARMS Coding Only -
No Distribution Other Than As Listed Above 1
i i
l
(
l
-