W3F1-92-0193 A4.05 QA August 13, 1992 U.S. Nuclear Regulatory Commission | W3F1-92-0193 A4.05 QA August 13, 1992 U.S. Nuclear Regulatory Commission | ||
-ATTN: Document Control Desk Washington, D.C. 20555 | |||
==Subject:== | ==Subject:== | ||
Waterford 3 SES-Docket No. 50-382 Licer.se No. NPF-38 Monthly Operating Report Gentlemen: | Waterford 3 SES-Docket No. 50-382 Licer.se No. NPF-38 Monthly Operating Report Gentlemen: | ||
Attached is the su .'mt monthly report which covers the operating statistics for tho moi..n of J u. 9' 2. This report is submitted per Section G.9.1.6 of the Waterford 3 % i u .. . . specifications for Facility Operating License No. NPF-38. | Attached is the su.'mt monthly report which covers the operating statistics for tho moi..n of J u. | ||
Very truly yo, h , ek%k 'V.. & | 9' 2. This report is submitted per Section G.9.1.6 of the Waterford 3 % i u.... specifications for Facility Operating License No. NPF-38. | ||
RFB/CJT/ssf Attachment ec; | Very truly yo, h, ek%k 'V.. & | ||
RFB/CJT/ssf Attachment ec; | |||
- J.L. Milhoan, NRC Region IV D.L. Wigginton, NRC-NRR R. B.- McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.) | |||
J.T. Wheelock (INPO Records Center) | J.T. Wheelock (INPO Records Center) | ||
NRC Re-ident Inspectors Office l | |||
l-190007 | l-190007 7 | ||
\\T 9208190168 920731 | |||
~ | |||
PDR ADOCK 05000382 R | |||
PDR | |||
M | M 4 | ||
4 | '. 4 | ||
: 1. - | |||
,- c.. | |||
NRC MONTHLY OPERATING REPORT | NRC MONTHLY OPERATING REPORT | ||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATIONS WATERFORD 3 JULY 1992 The unit operated at an average powar of 95.2% and experienced one forced outage during the period. | OF OPERATIONS WATERFORD 3 JULY 1992 The unit operated at an average powar of 95.2% and experienced one forced outage during the period. | ||
i | i-) | ||
i. | i. | ||
d p | d p | ||
i | i | ||
.{ | |||
l | l | ||
-J;: | |||
j PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES I | |||
WATERFORD 3 During the month of July 1992, there were no pressurizer safety valve failures or challenges. | |||
4i-d 4 | 4i-d 4 | ||
d 3 | d 3 | ||
4 W | 4 W | ||
m | |||
=- | |||
H | H | ||
.. + | |||
d | d | ||
=.. | |||
.. OPERATING DATA. REPORT DOCKET NAME: 50-382 UNIT NAME: WATERFORD 3 l | |||
-DATE OF. REPORT: AUGUST, 1992 COMPLETED-BY P. M. CENTOLANZ7 TELEPHONE: 504-739-6683 OPERATING STATUS-1. | |||
COMPLETED-BY | Reporting Period: Ju)y, 1992 | ||
TELEPHONE: 504-739-6683 OPERATING STATUS- | . Gross Hours in Reporting Period 744 2. | ||
Currently-Authorized Powe.; Level (MWt): 3390 | |||
--Maximum Dependable Capacity (Net MWe): 1075 | |||
. Design Electrical Rating (Net MWe): 1104 13; Power Level'_to which Restricted (if any).(Net MWe): N/A 4. | |||
Reasons for Restriction (if-any) - | |||
N/A-TH?S MONTH | |||
13; | 'YR TO DATE CUMULATIVE | ||
-5. | |||
~ Number of Hours Reactor was Critical. | |||
-719.0, 4,827.5 | |||
-49,913.9 6. | |||
Reactor aeserve Shutdown Hours 7. | |||
--Hours Generator was On-line 713.7 4,781.9 49,162.7- | |||
'8. | |||
Unit Reserve | |||
' Shutdown Hours -9. | |||
Gross Thermal Energy- | |||
^ | ^ | ||
' Generated (MWH)_ | |||
Energy Generated.(tGGI) | 2,400,380 16,135,901 161,685,376 10.- GrossiElectrical Energy Generated.(tGGI) 790,100 5,361,640 54,233,060 il.s--Net Electrical Energy. | ||
Generated-(HWH)~ | Generated-(HWH)~ | ||
:12. | 752,424 5,121,487 | ||
'51,670,947 | |||
:12. | |||
Reactor. Service Factor 96.6 94.5 83.3 p | |||
: 16. - Unit Capacity Factor' | 13. | ||
(using MDC) | Reactor-Availability Factor 96.6 94.5 83.1 | ||
: 14. - Unit Service Factor-95.9 93.6 81.8 | |||
-15._ | |||
Unit Availability Factor 95.9 93.6 | |||
-81.8 6 | |||
: 16. - Unit Capacity Factor' j[#' | |||
(using MDC) 94.1 93.2 80.0 M | |||
'117. | |||
Unit Capacity-Factor | |||
'(Using DER) | |||
~ | |||
91.6 90.8 77.9 f18.. Unit Forced _ Outage Rate 4.1 2.6 4.1 | |||
_a | |||
4 6 | 4 6 | ||
-OPERATING DATA REPORT DOCKET NAME: 50-382. | |||
UNIT NAME: WATERFORD 3 | UNIT NAME: WATERFORD 3 1 | ||
DATE OF REPORT: AUGUST, 1992 i | |||
TELEPHONE: 504-739-6683 | COMPLETED-BY P. M. | ||
CENTOLANZI TELEPHONE: 504-739-6683 i | |||
Refueling, 9/19/92, 56 days | OPERATING DATA REPORT (Con't) | ||
' 19. | |||
Shutdowns Scheduled over next 6 Months (type,- date and duration of each): | |||
THIS MONTH | Refueling, 9/19/92, 56 days | ||
'2 0. | |||
If Shutdown at ena of report period, estimated date of startup: N/A | |||
: 24. . Nameplate Rating (Gross MWe): 1200 f | . 21. ' Unit in Commercial. Operation THIS MONTH YR TO DATE CUMULATIVE 22, Hours-in Reporting Period | ||
'744.0 5,111.0 60,072.0 | |||
i 4 | ~ | ||
23. | |||
Unit; Forced Outage Hours 30.3 125.9 2,110.7 | |||
: 24.. Nameplate Rating (Gross MWe): 1200 f | |||
25. | |||
If Changes' occur in capacity Ratings (Items Number 2 and 24) Since Last Report, Give Reasons: | |||
N/A i | |||
i 4 | |||
,,,7 4 | |||
-,.,.. _ ~. | |||
I | I | ||
. 4 j i -1, * | |||
* AVERAGE DAILY UNIT POWER LEVEL | * AVERAGE DAILY UNIT POWER LEVEL | ||
. DOCKET NAME: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: AUGUST, 1992 COMPLETED BY P. M CENTOLANZI TELEPHONES-504-739-6683 MONTH.- | |||
JULY' DAY AVERAGE DAILY POWER LEVEL' DAY AVERAGE DAILY POWER LEVEL (MWe-Net)- | |||
(MWe-Net) | |||
-1 1072 | |||
7: | -17 1064 2 | ||
:15- | 1073 18 1065 3 | ||
1071-19 | |||
Lin the reporting month. Compute to the nearest whole megawatt. | --1065 | ||
-4 1071 20 1067 5 | |||
1070-21 1067 | |||
~6 | |||
'1069 22' 1066 I | |||
7: | |||
-1068 23 1065 i | |||
8 | |||
-1068 24 1066 9-1067 25 1065 10 | |||
-1067' 26 1064 11 390 27 1065 12~ | |||
125 28 1064 13 988 29 1063 1061 30 1062 | |||
:15-1061 31-1057 l | |||
.16= | |||
1064 r | |||
INSTRUCTIONS on this format, list the average daily unit power '1evel in MWe-Net. for each' day - | |||
g Lin the reporting month. Compute to the nearest whole megawatt. | |||
it f-m | it f-m | ||
.. g J.L : [ | |||
J.L : [ | 4 ' | ||
4' | d | ||
'4 | |||
'4 s | |||
s | . g 2 | ||
. UNIT SHUTDOWNS AND POWER REDUCTIONS' DOCKET NUMBER: 50-382 UNIT NUMBER: WATERFORDJ3' DATE OF REPORT: AUGUST, 1992.' | |||
COMPLETED BY P. | |||
M. CENTOLANZI i | |||
. TELEPHONE:' 504-739.-6683-i t | |||
REPORT.FOR' JULY Type | REPORT.FOR' JULY Type Method of Shutting | ||
'F = Forced-Duration Down the Reactor or Cause, Comments and Number | |||
:Date- | |||
.S = Scheduled. | |||
(Hours)- | |||
Reason-(1). | |||
LER 92-006.- | Reducing Power (2) | ||
j | Corrective' Actions 92-04 920711- | ||
(2) METHOD | 'F 30.3 A | ||
1- | |||
3'=' Automatic Scram | ' Outago to repair leakage.on Post i | ||
Accident: Sampling | |||
- System valve. | |||
l | ' LER 92-006.- | ||
H = Other (explain) | 6 E | ||
j (2) METHOD | |||
[ | |||
(1) REASON (explain) 1 = Manual A = Equipment: Failure B = Maintenance or Test 2 = Manual Scram C = Refueling'. | |||
3'=' Automatic Scram D = Regulatory Restriction ~ | |||
4 = Continuation from Previous Period. | |||
[ | |||
E = Operator, Training and 5 = Power Reduction License Examination 6 = Other'(explain) l F = Administrative i | |||
G = Operational Error.(explain) | |||
H = Other (explain) b Y | |||
..g | |||
...o s. -. | |||
--....., ~. | |||
-? | |||
..}} | |||
Latest revision as of 06:27, 13 December 2024
| ML20099H726 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 07/31/1992 |
| From: | Burski R, Centolanzi P ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| W3F1-92-0193, W3F1-92-193, NUDOCS 9208190168 | |
| Download: ML20099H726 (7) | |
Text
o m
-.g w emeaay tr~;-~
. pqr
~
R. F. Durskt s.
W3F1-92-0193 A4.05 QA August 13, 1992 U.S. Nuclear Regulatory Commission
-ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES-Docket No. 50-382 Licer.se No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the su.'mt monthly report which covers the operating statistics for tho moi..n of J u.
9' 2. This report is submitted per Section G.9.1.6 of the Waterford 3 % i u.... specifications for Facility Operating License No. NPF-38.
Very truly yo, h, ek%k 'V.. &
RFB/CJT/ssf Attachment ec;
- J.L. Milhoan, NRC Region IV D.L. Wigginton, NRC-NRR R. B.- McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)
J.T. Wheelock (INPO Records Center)
NRC Re-ident Inspectors Office l
l-190007 7
\\T 9208190168 920731
~
PDR ADOCK 05000382 R
M 4
'. 4
- 1. -
,- c..
NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 JULY 1992 The unit operated at an average powar of 95.2% and experienced one forced outage during the period.
i-)
i.
d p
i
.{
l
-J;:
j PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES I
WATERFORD 3 During the month of July 1992, there were no pressurizer safety valve failures or challenges.
4i-d 4
d 3
4 W
m
=-
H
.. +
d
=..
.. OPERATING DATA. REPORT DOCKET NAME: 50-382 UNIT NAME: WATERFORD 3 l
-DATE OF. REPORT: AUGUST, 1992 COMPLETED-BY P. M. CENTOLANZ7 TELEPHONE: 504-739-6683 OPERATING STATUS-1.
Reporting Period: Ju)y, 1992
. Gross Hours in Reporting Period 744 2.
Currently-Authorized Powe.; Level (MWt): 3390
--Maximum Dependable Capacity (Net MWe): 1075
. Design Electrical Rating (Net MWe): 1104 13; Power Level'_to which Restricted (if any).(Net MWe): N/A 4.
Reasons for Restriction (if-any) -
N/A-TH?S MONTH
'YR TO DATE CUMULATIVE
-5.
~ Number of Hours Reactor was Critical.
-719.0, 4,827.5
-49,913.9 6.
Reactor aeserve Shutdown Hours 7.
--Hours Generator was On-line 713.7 4,781.9 49,162.7-
'8.
Unit Reserve
' Shutdown Hours -9.
Gross Thermal Energy-
^
' Generated (MWH)_
2,400,380 16,135,901 161,685,376 10.- GrossiElectrical Energy Generated.(tGGI) 790,100 5,361,640 54,233,060 il.s--Net Electrical Energy.
Generated-(HWH)~
752,424 5,121,487
'51,670,947
- 12.
Reactor. Service Factor 96.6 94.5 83.3 p
13.
Reactor-Availability Factor 96.6 94.5 83.1
- 14. - Unit Service Factor-95.9 93.6 81.8
-15._
Unit Availability Factor 95.9 93.6
-81.8 6
- 16. - Unit Capacity Factor' j[#'
(using MDC) 94.1 93.2 80.0 M
'117.
Unit Capacity-Factor
'(Using DER)
~
91.6 90.8 77.9 f18.. Unit Forced _ Outage Rate 4.1 2.6 4.1
_a
4 6
-OPERATING DATA REPORT DOCKET NAME: 50-382.
UNIT NAME: WATERFORD 3 1
DATE OF REPORT: AUGUST, 1992 i
COMPLETED-BY P. M.
CENTOLANZI TELEPHONE: 504-739-6683 i
OPERATING DATA REPORT (Con't)
' 19.
Shutdowns Scheduled over next 6 Months (type,- date and duration of each):
Refueling, 9/19/92, 56 days
'2 0.
If Shutdown at ena of report period, estimated date of startup: N/A
. 21. ' Unit in Commercial. Operation THIS MONTH YR TO DATE CUMULATIVE 22, Hours-in Reporting Period
'744.0 5,111.0 60,072.0
~
23.
Unit; Forced Outage Hours 30.3 125.9 2,110.7
- 24.. Nameplate Rating (Gross MWe): 1200 f
25.
If Changes' occur in capacity Ratings (Items Number 2 and 24) Since Last Report, Give Reasons:
N/A i
i 4
,,,7 4
-,.,.. _ ~.
I
. 4 j i -1, *
- AVERAGE DAILY UNIT POWER LEVEL
. DOCKET NAME: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: AUGUST, 1992 COMPLETED BY P. M CENTOLANZI TELEPHONES-504-739-6683 MONTH.-
JULY' DAY AVERAGE DAILY POWER LEVEL' DAY AVERAGE DAILY POWER LEVEL (MWe-Net)-
(MWe-Net)
-1 1072
-17 1064 2
1073 18 1065 3
1071-19
--1065
-4 1071 20 1067 5
1070-21 1067
~6
'1069 22' 1066 I
7:
-1068 23 1065 i
8
-1068 24 1066 9-1067 25 1065 10
-1067' 26 1064 11 390 27 1065 12~
125 28 1064 13 988 29 1063 1061 30 1062
- 15-1061 31-1057 l
.16=
1064 r
INSTRUCTIONS on this format, list the average daily unit power '1evel in MWe-Net. for each' day -
g Lin the reporting month. Compute to the nearest whole megawatt.
it f-m
.. g J.L : [
4 '
d
'4
'4 s
. g 2
. UNIT SHUTDOWNS AND POWER REDUCTIONS' DOCKET NUMBER: 50-382 UNIT NUMBER: WATERFORDJ3' DATE OF REPORT: AUGUST, 1992.'
COMPLETED BY P.
M. CENTOLANZI i
. TELEPHONE:' 504-739.-6683-i t
REPORT.FOR' JULY Type Method of Shutting
'F = Forced-Duration Down the Reactor or Cause, Comments and Number
- Date-
.S = Scheduled.
(Hours)-
Reason-(1).
Reducing Power (2)
Corrective' Actions 92-04 920711-
'F 30.3 A
1-
' Outago to repair leakage.on Post i
Accident: Sampling
- System valve.
' LER 92-006.-
6 E
j (2) METHOD
[
(1) REASON (explain) 1 = Manual A = Equipment: Failure B = Maintenance or Test 2 = Manual Scram C = Refueling'.
3'=' Automatic Scram D = Regulatory Restriction ~
4 = Continuation from Previous Period.
[
E = Operator, Training and 5 = Power Reduction License Examination 6 = Other'(explain) l F = Administrative i
G = Operational Error.(explain)
H = Other (explain) b Y
..g
...o s. -.
--....., ~.
-?
..