ML20099H726

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1992 for Waterford 3
ML20099H726
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/31/1992
From: Burski R, Centolanzi P
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-92-0193, W3F1-92-193, NUDOCS 9208190168
Download: ML20099H726 (7)


Text

o m

-.g w emeaay tr~;-~

. pqr

~

R. F. Durskt s.

W3F1-92-0193 A4.05 QA August 13, 1992 U.S. Nuclear Regulatory Commission

-ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES-Docket No. 50-382 Licer.se No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the su.'mt monthly report which covers the operating statistics for tho moi..n of J u.

9' 2. This report is submitted per Section G.9.1.6 of the Waterford 3 % i u.... specifications for Facility Operating License No. NPF-38.

Very truly yo, h, ek%k 'V.. &

RFB/CJT/ssf Attachment ec;

- J.L. Milhoan, NRC Region IV D.L. Wigginton, NRC-NRR R. B.- McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)

J.T. Wheelock (INPO Records Center)

NRC Re-ident Inspectors Office l

l-190007 7

\\T 9208190168 920731

~

PDR ADOCK 05000382 R

PDR

M 4

'. 4

1. -

,- c..

NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 JULY 1992 The unit operated at an average powar of 95.2% and experienced one forced outage during the period.

i-)

i.

d p

i

.{

l

-J;:

j PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES I

WATERFORD 3 During the month of July 1992, there were no pressurizer safety valve failures or challenges.

4i-d 4

d 3

4 W

m

=-

H

.. +

d

=..

.. OPERATING DATA. REPORT DOCKET NAME: 50-382 UNIT NAME: WATERFORD 3 l

-DATE OF. REPORT: AUGUST, 1992 COMPLETED-BY P. M. CENTOLANZ7 TELEPHONE: 504-739-6683 OPERATING STATUS-1.

Reporting Period: Ju)y, 1992

. Gross Hours in Reporting Period 744 2.

Currently-Authorized Powe.; Level (MWt): 3390

--Maximum Dependable Capacity (Net MWe): 1075

. Design Electrical Rating (Net MWe): 1104 13; Power Level'_to which Restricted (if any).(Net MWe): N/A 4.

Reasons for Restriction (if-any) -

N/A-TH?S MONTH

'YR TO DATE CUMULATIVE

-5.

~ Number of Hours Reactor was Critical.

-719.0, 4,827.5

-49,913.9 6.

Reactor aeserve Shutdown Hours 7.

--Hours Generator was On-line 713.7 4,781.9 49,162.7-

'8.

Unit Reserve

' Shutdown Hours -9.

Gross Thermal Energy-

^

' Generated (MWH)_

2,400,380 16,135,901 161,685,376 10.- GrossiElectrical Energy Generated.(tGGI) 790,100 5,361,640 54,233,060 il.s--Net Electrical Energy.

Generated-(HWH)~

752,424 5,121,487

'51,670,947

12.

Reactor. Service Factor 96.6 94.5 83.3 p

13.

Reactor-Availability Factor 96.6 94.5 83.1

14. - Unit Service Factor-95.9 93.6 81.8

-15._

Unit Availability Factor 95.9 93.6

-81.8 6

16. - Unit Capacity Factor' j[#'

(using MDC) 94.1 93.2 80.0 M

'117.

Unit Capacity-Factor

'(Using DER)

~

91.6 90.8 77.9 f18.. Unit Forced _ Outage Rate 4.1 2.6 4.1

_a

4 6

-OPERATING DATA REPORT DOCKET NAME: 50-382.

UNIT NAME: WATERFORD 3 1

DATE OF REPORT: AUGUST, 1992 i

COMPLETED-BY P. M.

CENTOLANZI TELEPHONE: 504-739-6683 i

OPERATING DATA REPORT (Con't)

' 19.

Shutdowns Scheduled over next 6 Months (type,- date and duration of each):

Refueling, 9/19/92, 56 days

'2 0.

If Shutdown at ena of report period, estimated date of startup: N/A

. 21. ' Unit in Commercial. Operation THIS MONTH YR TO DATE CUMULATIVE 22, Hours-in Reporting Period

'744.0 5,111.0 60,072.0

~

23.

Unit; Forced Outage Hours 30.3 125.9 2,110.7

24.. Nameplate Rating (Gross MWe): 1200 f

25.

If Changes' occur in capacity Ratings (Items Number 2 and 24) Since Last Report, Give Reasons:

N/A i

i 4

,,,7 4

-,.,.. _ ~.

I

. 4 j i -1, *

  • AVERAGE DAILY UNIT POWER LEVEL

. DOCKET NAME: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: AUGUST, 1992 COMPLETED BY P. M CENTOLANZI TELEPHONES-504-739-6683 MONTH.-

JULY' DAY AVERAGE DAILY POWER LEVEL' DAY AVERAGE DAILY POWER LEVEL (MWe-Net)-

(MWe-Net)

-1 1072

-17 1064 2

1073 18 1065 3

1071-19

--1065

-4 1071 20 1067 5

1070-21 1067

~6

'1069 22' 1066 I

7:

-1068 23 1065 i

8

-1068 24 1066 9-1067 25 1065 10

-1067' 26 1064 11 390 27 1065 12~

125 28 1064 13 988 29 1063 1061 30 1062

15-1061 31-1057 l

.16=

1064 r

INSTRUCTIONS on this format, list the average daily unit power '1evel in MWe-Net. for each' day -

g Lin the reporting month. Compute to the nearest whole megawatt.

it f-m

.. g J.L : [

4 '

d

'4

'4 s

. g 2

. UNIT SHUTDOWNS AND POWER REDUCTIONS' DOCKET NUMBER: 50-382 UNIT NUMBER: WATERFORDJ3' DATE OF REPORT: AUGUST, 1992.'

COMPLETED BY P.

M. CENTOLANZI i

. TELEPHONE:' 504-739.-6683-i t

REPORT.FOR' JULY Type Method of Shutting

'F = Forced-Duration Down the Reactor or Cause, Comments and Number

Date-

.S = Scheduled.

(Hours)-

Reason-(1).

Reducing Power (2)

Corrective' Actions 92-04 920711-

'F 30.3 A

1-

' Outago to repair leakage.on Post i

Accident: Sampling

- System valve.

' LER 92-006.-

6 E

j (2) METHOD

[

(1) REASON (explain) 1 = Manual A = Equipment: Failure B = Maintenance or Test 2 = Manual Scram C = Refueling'.

3'=' Automatic Scram D = Regulatory Restriction ~

4 = Continuation from Previous Period.

[

E = Operator, Training and 5 = Power Reduction License Examination 6 = Other'(explain) l F = Administrative i

G = Operational Error.(explain)

H = Other (explain) b Y

..g

...o s. -.

--....., ~.

-?

..