Westinghouse | Westinghouse Energy Systems Box 355 Electric Corporation Pittsbun a DannsyNania 15230 0355 NSD-NRC-964670 DCP/NRC0481 Docket No.: STN-52-003 | ||
NSD-NRC-964670 | ~ | ||
March 26,1996 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION: | |||
March 26,1996 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION: | T.R. QUAY | ||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 29: | Line 29: | ||
==Dear Mr. Quay:== | ==Dear Mr. Quay:== | ||
In the Draft Safety Evaluation Report (DSER) for the AP600, the staff requested that the QA applied to RTNSS should be comparable to that described in Generic Letter 85-06 for ATWS, as well as Regulatory Position 3.5 and Appendix A of RG 1.155 for non-safety-related station blackout equipment (DSER open item 17.1.3-1). Westinghouse is preparing a QA program requirements document, based on these standards, for use in RTNSS SSC procurements. The requirements that are to be included in this document are included for information as Attachment I to this letter. | |||
In the Draft Safety Evaluation Report (DSER) for the AP600, the staff requested that the QA applied to RTNSS should be comparable to that described in Generic Letter 85-06 for ATWS, as well as Regulatory Position 3.5 and Appendix A of RG 1.155 for non-safety-related station blackout equipment (DSER open item 17.1.3-1). Westinghouse is preparing a QA program requirements | |||
Please contact John C. Butler on (412) 374-5268 if you have any questions concerning this transmittal. | Please contact John C. Butler on (412) 374-5268 if you have any questions concerning this transmittal. | ||
Y ff Brian A. McIntyre, Manager Advanced Plant Safety and Licensing i | |||
/nja Enclosure cc: | |||
T. Kenyon, NRC N. J. Liparulo, Westinghouse (w/o Enclosure) 29CC81 gI | |||
} | |||
9603290361 960326 PDR ADOCK 05200003 A | |||
PDR L}} | |||
Latest revision as of 04:48, 13 December 2024
| ML20101H577 | |
| Person / Time | |
|---|---|
| Site: | 05200003 |
| Issue date: | 03/26/1996 |
| From: | Mcintyre B WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| To: | Quay T NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20101H581 | List: |
| References | |
| GL-85-06, GL-85-6, NSD-NRC-96-4670, NUDOCS 9603290361 | |
| Download: ML20101H577 (4) | |
Text
_
~
~
Westinghouse Energy Systems Box 355 Electric Corporation Pittsbun a DannsyNania 15230 0355 NSD-NRC-964670 DCP/NRC0481 Docket No.: STN-52-003
~
March 26,1996 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION:
T.R. QUAY
SUBJECT:
QUALITY ASSURANCE REQUIREMENTS FOR AP600 RTNSS SYSTEMS, STRUCTURES, AND COMPONENTS
Dear Mr. Quay:
In the Draft Safety Evaluation Report (DSER) for the AP600, the staff requested that the QA applied to RTNSS should be comparable to that described in Generic Letter 85-06 for ATWS, as well as Regulatory Position 3.5 and Appendix A of RG 1.155 for non-safety-related station blackout equipment (DSER open item 17.1.3-1). Westinghouse is preparing a QA program requirements document, based on these standards, for use in RTNSS SSC procurements. The requirements that are to be included in this document are included for information as Attachment I to this letter.
Please contact John C. Butler on (412) 374-5268 if you have any questions concerning this transmittal.
Y ff Brian A. McIntyre, Manager Advanced Plant Safety and Licensing i
/nja Enclosure cc:
T. Kenyon, NRC N. J. Liparulo, Westinghouse (w/o Enclosure) 29CC81 gI
}