Westinghouse               Energy Systems                                   Box 355 Pittsbun a DannsyNania 15230 0355 Electric Corporation 1
Westinghouse Energy Systems Box 355 Electric Corporation Pittsbun a DannsyNania 15230 0355 NSD-NRC-964670 DCP/NRC0481 Docket No.: STN-52-003
NSD-NRC-964670                             l DCP/NRC0481 Docket No.: STN-52-003
~
    ~
March 26,1996 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION:
March 26,1996 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION:               T.R. QUAY
T.R. QUAY


==SUBJECT:==
==SUBJECT:==
Line 29: Line 29:


==Dear Mr. Quay:==
==Dear Mr. Quay:==
 
In the Draft Safety Evaluation Report (DSER) for the AP600, the staff requested that the QA applied to RTNSS should be comparable to that described in Generic Letter 85-06 for ATWS, as well as Regulatory Position 3.5 and Appendix A of RG 1.155 for non-safety-related station blackout equipment (DSER open item 17.1.3-1). Westinghouse is preparing a QA program requirements document, based on these standards, for use in RTNSS SSC procurements. The requirements that are to be included in this document are included for information as Attachment I to this letter.
In the Draft Safety Evaluation Report (DSER) for the AP600, the staff requested that the QA applied to RTNSS should be comparable to that described in Generic Letter 85-06 for ATWS, as well as Regulatory Position 3.5 and Appendix A of RG 1.155 for non-safety-related station blackout equipment (DSER open item 17.1.3-1). Westinghouse is preparing a QA program requirements                         i document, based on these standards, for use in RTNSS SSC procurements. The requirements that are                 l to be included in this document are included for information as Attachment I to this letter.
Please contact John C. Butler on (412) 374-5268 if you have any questions concerning this transmittal.
Please contact John C. Butler on (412) 374-5268 if you have any questions concerning this transmittal.
l Y ff Brian A. McIntyre, Manager Advanced Plant Safety and Licensing i
Y ff Brian A. McIntyre, Manager Advanced Plant Safety and Licensing i
    /nja Enclosure cc:     T. Kenyon, NRC N. J. Liparulo, Westinghouse (w/o Enclosure) 29CC81 9603290361 960326                                                                     gI PDR     ADOCK 05200003                                                                   }
/nja Enclosure cc:
A                      PDR                                                               L}}
T. Kenyon, NRC N. J. Liparulo, Westinghouse (w/o Enclosure) 29CC81 gI
}
9603290361 960326 PDR ADOCK 05200003 A
PDR L}}

Latest revision as of 04:48, 13 December 2024

Forwards QA Program Requirements for Rtnss Sys,Structures & Components, Per GL 85-06
ML20101H577
Person / Time
Site: 05200003
Issue date: 03/26/1996
From: Mcintyre B
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Quay T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20101H581 List:
References
GL-85-06, GL-85-6, NSD-NRC-96-4670, NUDOCS 9603290361
Download: ML20101H577 (4)


Text

_

~

~

Westinghouse Energy Systems Box 355 Electric Corporation Pittsbun a DannsyNania 15230 0355 NSD-NRC-964670 DCP/NRC0481 Docket No.: STN-52-003

~

March 26,1996 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION:

T.R. QUAY

SUBJECT:

QUALITY ASSURANCE REQUIREMENTS FOR AP600 RTNSS SYSTEMS, STRUCTURES, AND COMPONENTS

Dear Mr. Quay:

In the Draft Safety Evaluation Report (DSER) for the AP600, the staff requested that the QA applied to RTNSS should be comparable to that described in Generic Letter 85-06 for ATWS, as well as Regulatory Position 3.5 and Appendix A of RG 1.155 for non-safety-related station blackout equipment (DSER open item 17.1.3-1). Westinghouse is preparing a QA program requirements document, based on these standards, for use in RTNSS SSC procurements. The requirements that are to be included in this document are included for information as Attachment I to this letter.

Please contact John C. Butler on (412) 374-5268 if you have any questions concerning this transmittal.

Y ff Brian A. McIntyre, Manager Advanced Plant Safety and Licensing i

/nja Enclosure cc:

T. Kenyon, NRC N. J. Liparulo, Westinghouse (w/o Enclosure) 29CC81 gI

}

9603290361 960326 PDR ADOCK 05200003 A

PDR L