=Text= | =Text= | ||
{{#Wiki_filter:l | {{#Wiki_filter:l AVLl; AGE !)All) UNil POwl t LI VI.t | ||
AVLl; AGE !)All) UNil POwl t LI VI.t | ~ | ||
DOCKET NO. | |||
DOCKET NO. | 50-250 UNil. Turkey Point Unit #3 DATE 1/15/85 COMPLETED BY N.W. Grant TELEPilONE (305)552-3675 MONTH December, 1984 DAY AVER ACE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL o | ||
IMWe Net) | |||
3 | .(MWe Neil I | ||
4 | 6R1 gf 2 | ||
5 | 682 gg 673 3 | ||
i 6 | 675 4 | ||
20 674 5 | |||
i 6 | |||
672 22 7 | |||
10 | 681 23 g | ||
3 | 697 24 9 | ||
2' | 697 25 10 696 26 696 3 | ||
32 | 2' 32 694 25 13 29 14 30 | ||
25 | ~~~ | ||
13 | ~~~ | ||
15 33 I | |||
15 | |||
INSTRUCTIONS On this format.lar the aveuge daily unit power lesel in MWe Nei for cach day in the reportin; m.inth. Compute to the nearest whiite expwast. | INSTRUCTIONS On this format.lar the aveuge daily unit power lesel in MWe Nei for cach day in the reportin; m.inth. Compute to the nearest whiite expwast. | ||
8502200020 841231 gDR | 8502200020 841231 gDR ADOCK 05000250 f | ||
PDR hi | |||
\\ | |||
~ | |||
OPERATING DATA RLPORT DOCKET NO- -- | OPERATING DATA RLPORT DOCKET NO- -- | ||
DATE .1 /15/85 COMPLETED BY N. W. ' Grant TELEPHONL (305)SS2-3675 OPERATING STATUS Notes | DATE.1 /15/85 COMPLETED BY N. W. ' Grant TELEPHONL (305)SS2-3675 OPERATING STATUS Notes | ||
: 1. Unit Name: Turkey Point Unit #3 | : 1. Unit Name: | ||
Turkey Point Unit #3 See the, Unit Shutdowns and December,1984 | |||
: 2. Reporting Period: | : 2. Reporting Period: | ||
2200 Power Reductions" Report | |||
: 3. Licensed Thermal Power (MWI): | : 3. Licensed Thermal Power (MWI): | ||
0 o' | 0 o' | ||
: 4. Namepiste Rating (Gross MWe): | |||
: 5. Design Electrical Rating (Net MWe): | : 5. Design Electrical Rating (Net MWe): | ||
: 6. Maximum Dependable Capacity (Gross MWe): | 700 | ||
: 6. Maximum Dependable Capacity (Gross MWe): | |||
666 | |||
: 7. Maximum Dependable Capacity (Net MWe): | : 7. Maximum Dependable Capacity (Net MWe): | ||
: 8. If Changes Occur in Capacity Ratings (llems Number 3 Through 7) Since Last Report, Give Reasone | : 8. If Changes Occur in Capacity Ratings (llems Number 3 Through 7) Since Last Report, Give Reasone | ||
: 9. Power I.svel To Which Restricted.lf Any (Net MWe): | : 9. Power I.svel To Which Restricted.lf Any (Net MWe): | ||
: 10. Reasons For Restrictions.lf Any: | : 10. Reasons For Restrictions.lf Any: | ||
This Month | This Month Yr.-to Date Cumulative | ||
: 11. Hours in Repo:1ing Period | : 11. Hours in Repo:1ing Period 744 8784 10RR44.6 | ||
: 12. Number Of Hours Reactor Was Critical | : 12. Number Of Hours Reactor Was Critical 288.3 7366.6 73672.8 0 | ||
0 844.4 | |||
844.4 | : 13. Reactor Reserve Shutdown Hours 288.3 7357.1 73179.1 | ||
: | : 14. Hours Generator On Line 0 | ||
0 121.8 | |||
: 15. Unit Reserve Shutdown 1(ours | : 15. Unit Reserve Shutdown 1(ours | ||
: 16. Gross Thermal Energy Generated (MWH) | : 16. Gross Thermal Energy Generated (MWH) 619365 1R640914 | ||
: 17. Gross Electrical Energy Generated (MWH) | -141194;11 | ||
: 19. Unit Service Factor | : 17. Gross Electrical Energy Generated (MWH) 207160 5046130 48255695 a | ||
: 20. Unit Availability Factor | : 18. Net Electrial Energy Generated (MWH) 193577 4784209 45697206 | ||
: 19. Unit Service Factor 30;8 82.6 69.1 | |||
: 20. Unit Availability Factor 38.8 82.6 69.3 39.1 81.8 33 L | |||
: 21. Unit Capacity Factor (Using MDC Net) 37.5 78.6 62.3 | |||
: 22. Unit Capacity Factor (Using DER Net) i 61.3 14.7 6.4 i | |||
: 23. Unit Forced Outage Rate | |||
: 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht: | : 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht: | ||
Refueling March 30, 1985, 11 weeks | Refueling March 30, 1985, 11 weeks 1 | ||
1 | |||
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | : 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | ||
j | j | ||
INITI AL CRITICALITY | : 26. Units in Test Status (Prior eo Commercial Operation): | ||
Forecast Arisiaed l | |||
INITI AL CRITICALITY l | |||
INITIAL ELECTRICITY COMMERCI AL OPER ATION | |||
1 i | 1 i | ||
DOCKET NO. 50-250 UNIT SHUTDOWNS AND POWER REDUCTIONS | DOCKET NO. 50-250 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME 'rnrkm m,, r+ rh,it #3 DATE l /.l 6186 ND BY PL W Grant REPORT MONTHDecmber, 1984 17.t.EPHONE (305) 552-3675 5 | ||
E | |||
]g 3 | |||
*E3 Licensee Eg Cause & Corrective | |||
^ ' ' * ' " | |||
i. | |||
19 | N.. | ||
Date i | |||
l I | 3g it js& | ||
D-Regulatory Restriction | Event 3,7 Ed y= | ||
I;-Operator Traming A bcense Esamination | 5 ggg Report a mU Prevent Recurrence b-g l | ||
6 I | |||
19 84 12 13 F | |||
455.7 A | |||
3 250-84-33 Im GENEPA A short to ground in the Unit'#3 generator exciter caused a turbine trip which resulted in a reactor trip. | |||
'Ihe exciter was replaced. | |||
l I | |||
2 3 | |||
4 F: Forced Reason: | |||
Method: | |||
Exhibit G - Instructions S Scheduled A-Equipment Failure (Esplain) 1 -Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. | |||
Entry Sheets for Licensee C-Refueling 3-Automatic Scram. | |||
Event Report (LERI File (NUREG-D-Regulatory Restriction | |||
@-Other iExplain) 0161) | |||
I;-Operator Traming A bcense Esamination k ~ O * ** ** """ | |||
5 F Adnunistrative G.Operatomal I ire.r i F splam l s-. f.4. | |||
m,.,# | |||
Ethibit I - Same Source l's/77 ) | |||
Il-Other ( E xplain) | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING 2XPERIENCE DOCKET NO.. | OF OPERATING 2XPERIENCE DOCKET NO.. | ||
DATE | 50-250-UNIT Turkey Point Unit #3. | ||
DATE January 15, 1985 COMPLETED BY N. W. Grant s | |||
TELEPHONE (305) 552-3675 REPORT 110 NTH December, 1984-See the' Unit Shutdowns 'and Power Reductions" Report. | |||
Inspection and requirements of IE Bulletins and NUREG 0737 are continuing. | Inspection and requirements of IE Bulletins and NUREG 0737 are continuing. | ||
Florida Power & Light. Company commitments for NUREG-0373 implementation are continuing. Refer to correspondence between FPL and NRC for additional information. | Florida Power & Light. Company commitments for NUREG-0373 implementation are continuing. | ||
Refer to correspondence between FPL and NRC for additional information. | |||
s 1 | s 1 | ||
1 t | 1 t | ||
A | A | ||
i AVLl; AGE DAll i tWil POwi k LI VI.t | i AVLl; AGE DAll i tWil POwi k LI VI.t j | ||
gj | DOCKET NO. | ||
is | 50-251 UNir Turkey Point Unit #4 DATE 1/15/85-COMPLETED BY H. W. Grant TELEPilONE (305)552-3675 MONTH December. 1984 DAY AVER ACE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL i | ||
39 | IMWe. Net) | ||
-(MWe Neu 3 | |||
10 | gj 688 2 | ||
is 687 3 | |||
39 6b9__ | |||
385 688 4 | |||
20 5 | |||
676 al 686 6 | |||
677 22 685 7 | |||
684 685 23 693 686 g | |||
74 9 | |||
692 684 25 10 693 683 26 693 684 12 693 685 28 13 687 686 29 14 6nn 30 685 15 688 684 3, | |||
16 M7 INSTRUCTIONS On this forenas. list the average daily unit pinwer leselin MWe Nes for each day in the rep.istin;in.inth. Compute to the nearest whiite twgawars. | |||
19/77) 9 | |||
OPERATING DATA REPORT 50-251 DOCKET | OPERATING DATA REPORT 50-251 DOCKET NO. P15/85 DATE COMPLETED BYN. W. Grant TELEPHONL (3tnsiS52-3675 OPERATING STATUS Turkey Point Unit #4 Notes | ||
,, g g | |||
: 2. Reporting Period: | : 2. Reporting Period: | ||
: 3. Licensed Thermal Power (MWI): | December. 19Rd See the unit shutdowns and | ||
: 3. Licensed Thermal Power (MWI): | |||
?200 power reductions report. | |||
: 4. Nameplate Rating (Gross MWe): | |||
6 | |||
: 5. Design Electrical Rating (Net MWe): | : 5. Design Electrical Rating (Net MWe): | ||
: 6. Maximum Dependable Capacity (Gross MWe): | 70n | ||
: 7. Maximum Dependable Capacity (Net MWe): | : 6. Maximum Dependable Capacity (Gross MWe): | ||
666 | |||
: 7. Maximum Dependable Capacity (Net MWe): | |||
: 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report,Give Reasone | : 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report,Give Reasone | ||
: 9. Power 1.nel To Which Restricted. lf Any (Net MWe): | : 9. Power 1.nel To Which Restricted. lf Any (Net MWe): | ||
: 10. Reasons For Restrictions.lf Any: | : 10. Reasons For Restrictions.lf Any: | ||
This Month | This Month Yr..to.Date Cumulative 744 8784 99581 | ||
: 11. Hours in Reporting Period | : 11. Hours in Reporting Period 669.1 5079.8 69718.4 | ||
: 12. Number Of Hours Reactor Was Critical | : 12. Number Of Hours Reactor Was Critical | ||
: 13. Reactor Reserve Shutdown Hours | : 13. Reactor Reserve Shutdown Hours 0 | ||
166.6 | .0 166.6 | ||
: 14. Hours Generator On.Line | : 14. Hours Generator On.Line 663.4 4772.1 67240.2 0 | ||
0 31.2 | |||
: 15. Unit Reserve Shutdown gours | : 15. Unit Reserve Shutdown gours | ||
: 16. Gross Thermal Energy Generated (MWH) | .1449439. | ||
: 17. Gross Electrical Energy Generated (MWH) | 10383365 142130106 | ||
1771ngs; | : 16. Gross Thermal Energy Generated (MWH) | ||
: 18. Net Electrical Energy Generated (MWH)' | : 17. Gross Electrical Energy Generated (MWH) 476055 1771ngs; aslopto7 452898 3079222 427R1?R1 | ||
: 18. Net Electrical Energy Generated (MWH)' | |||
: 20. Unit Availability Factor | 89.2 54.3 67.5 | ||
: 21. Unit Capacity Factor (Using MDC Net) | : 19. Unit Service Factor 1 | ||
: 22. Unit Capacity Factor (Using DER Net) | : 20. Unit Availability Factor 89.2 54.3 67.6 91.4 52.6 6M | ||
: 21. Unit Capacity Factor (Using MDC Net) | |||
: 22. Unit Capacity Factor (Using DER Net) 87~.8 50.6 62.0 10.8 24.1 6.1 | |||
: 23. Unit Forced Outage Rate | |||
: 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht: | : 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht: | ||
l | l anuan 2 M (adual) | ||
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | : 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | ||
: 26. Units in Test Status (Prior io Commercial Operation): | : 26. Units in Test Status (Prior io Commercial Operation): | ||
Forecast Atinioed INITIAL CRITICALITY INITI AL ELECTRICITY COMMERCI AL OPER ATION | |||
DOCKETNO. 50-251 UNIT SHUTDOWNS AND POWER REDUCTIONS | DOCKETNO. 50-251 UNIT SHUTDOWNS AND POWER REDUCTIONS UNITNAMETurkev Point tinit (4 - | ||
DATE 1/15/85 | DATE 1/15/85 CORWLETED BY N. | ||
CORWLETED BY N. W- Cran +- | W-Cran +- | ||
REPORT MONT1g Decmber. 1984 | REPORT MONT1g Decmber. 1984 | ||
,yq3 qq,,_,q | |||
-_E E* | |||
.] 3 3 | |||
j E~ | |||
Prevent Recurrence | Licensee Eg Cause & Corrective g*b | ||
fE | ^ ' ' " ' " | ||
d 25 | N.. | ||
4 I | Date i | ||
l.-Operator Traming A Ucense Enamination | 3g | ||
( | |||
2g& | |||
Event g'2 E | |||
Prevent Recurrence fE j;ji g Report 8 mO H | |||
g d | |||
i 25 84 11 24 F | |||
80.6 A | |||
4 251-84-25 CB CKIBKR Reactor trip on low flow resultirg frcm failed RCP breaker. Breaker repaired. | |||
4 I | |||
2 3 | |||
4 1 | |||
F Forced Reas m: | |||
Method: | |||
Exhibit G Instructions 5 Stheduled A Equiprnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. | |||
Entry Sheets for Licensee C Refueling 3 Automatoc Scram. | |||
Event Repor:ILER) File (NUREG-D-Regulatory Rest:iction 9-Other (Explain 1 01611 l.-Operator Traming A Ucense Enamination M ~ O *"" ''"" | |||
5 F-Administrative G-Operati. mal I e r..r I F =plem t x- | |||
/.. a a s e w.,# | |||
Exhibit I - Same Source tas/77) | |||
Il-Other i E xplain t | |||
GUMMARY OF OPERATING EXPERIEECE DOCKET NO. | GUMMARY OF OPERATING EXPERIEECE DOCKET NO. | ||
50-251 UNIT Turkey Point Unit #4 DATE J_anuary 19. 1985 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH pecomher. 1984 o | |||
Unit.#4 operated at essentially full poweF except as noted on Unit Shutdown Report. | |||
Inspection and requirements of IE Bulletin and NUREG -0737 are continuing. | Inspection and requirements of IE Bulletin and NUREG -0737 are continuing. | ||
Florida Power & Light Company commitments to NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information. | Florida Power & Light Company commitments to NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information. | ||
a l | a l | ||
. - A.--.- | |||
AVLl; AGE D All i UNil PD*1 }; Ll VI.I DOCKET NO. 50-333 g.,)St. Lucie Unit #1 DATE 1/15/85 | AVLl; AGE D All i UNil PD*1 }; Ll VI.I DOCKET NO. 50-333 g.,)St. Lucie Unit #1 DATE 1/15/85 N. W. Grant 0051PLETED BY TELEPilONE(305)552-3675 MONm December, 1984 DAY AVER ACE DAILY POWER LEVEL DAY AVER ACE DAILY POWER LEVEL IMWe Net) | ||
DAY | -(MWe Net i 852 I | ||
19 | j 853 2 | ||
851 is 855 3 | |||
ll | ""O 19 w7 4 | ||
14 | 4 850 20 5 | ||
851 21 155 6 | |||
850 22 780 7 | |||
854 23 796 8 | |||
c., | 857 24 843 9 | ||
855 844 25 10 856 838 26 ll 853 27 834 la 854 844 2s 854 845 13 29 14 853 30 846 15 853 816 33 16 RS3 INSTRUCTIONS | |||
'esage daily unis p.mer leselin MWe.Nei for each day :: the reporting month. Compute su he earest hiil asva i,mi S | |||
a | |||
.-g.,-., | |||
c., | |||
r- | |||
OPERATING DATA REPORT DOCKET NO.50-335 DATElDb/66 COMPLETED TELEPHONL 305) 552- | OPERATING DATA REPORT DOCKET NO.50-335 DATElDb/66 COMPLETED BY( A. W TELEPHONL 305) 552-3675 OPERATING STATUS Notes | ||
: 1. Unit Name: " | : 1. Unit Name: " | ||
: 2. Reporting Period: | I" cia Unit 41 Unit #1 operated at Decomhpr. 14Rd | ||
: 2. Reporting Period: | |||
essentially full power. | |||
2700 | 2700 | ||
: 3. Licensed Thermal Power (MWI): | : 3. Licensed Thermal Power (MWI): | ||
: 4. Nameplate Rating (Gross MWe): | 893 | ||
: 4. Nameplate Rating (Gross MWe): | |||
6 | 6 | ||
: 5. Design Electrical Rating (Net MWe): | : 5. Design Electrical Rating (Net MWe): | ||
: 6. Maximum Dependable Capacity (Gross MWe): | g | ||
: 6. Maximum Dependable Capacity (Gross MWe): | |||
~ | |||
822 | 822 | ||
: 7. Maximum Dependable Capacity (Net MWe): | : 7. Maximum Dependable Capacity (Net MWe): | ||
| Line 189: | Line 264: | ||
: 9. Power Level To Which Restricted.lf Any (Net MWe): | : 9. Power Level To Which Restricted.lf Any (Net MWe): | ||
: 10. Reasons For Restrictions,if Any: | : 10. Reasons For Restrictions,if Any: | ||
This Month | This Month Yr..to.Date Cinnulative | ||
: 11. Houn in Reporting Period | : 11. Houn in Reporting Period 744 8784 70392 | ||
: 12. Number Of Hours Reactor Was Critical | : 12. Number Of Hours Reactor Was Critical 712.7 5555.2 49021.3 | ||
: 13. Reactor Reserve Shutdown Hours | : 13. Reactor Reserve Shutdown Hours 0 | ||
Oi | Oi 205.3 690.0 Esl57.3 48733.5 | ||
: 14. Hours Generator On.Line U | |||
: 15. Unit Reserve Shutdown Qours | U M*3 | ||
: 17. Gross Electrical Energy Generated (MWH) | : 15. Unit Reserve Shutdown Qours 1834566 13469598 "TTT37636 I | ||
: 16. Gross Thermal Energy Generated (MWH) 611080 4484780 39858665 | |||
: 18. Net Electrical Energy Generated (MWH) | : 17. Gross Electrical Energy Generated (MWH) 578937 4223075 37662348 | ||
: 18. Net Electrical Energy Generated (MWH) | |||
: 19. Unit Service Factor | : 19. Unit Service Factor | ||
~ | |||
: | 92.7 58.7 69.2 92*7 98.7 69.3 | ||
: | : 20. Unit Availability Factor 94.7 68.6 6L3 | ||
: | : 21. Unit Capacity Factor (Using MDC Net) 93.8 58_ 0 65.7 | ||
: 22. Unit Capacity Factor (Using DER Net) 7.3 6.4 4.8 | |||
: 23. Unit Forced Outage Rate | |||
: 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht: | : 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht: | ||
l | l | ||
l | : 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | ||
l | |||
: 26. Units in Test Status (Prior o Commercial Operation): | |||
Forecast Achined l | |||
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION | |||
i | i UNIT SHUTDOWNS AND POWER REDUCTIONS AME 5t u e Unit #1. | ||
DATE 1/16/85 COttl2TED gy N. W. Grant REPORT MONTH Decomher 1484 TEl.EPHONE (305) 662-3675 e. | |||
E e | |||
i 1g 3 | |||
y E~ | |||
Licensee | |||
,E g Cause a Corrective g*d N. i. | |||
Daie | |||
{ | |||
f= | 3g 4 | ||
2g& | |||
i i | Event g'1 | ||
^ * ' * ' " | |||
E Prevent Recurrence f= | |||
S Stheduled | 5 jgg Report a mO H | ||
2 D-Regulatory Restriction | g l | ||
I:-Operator Training & Ucense Examination | 6 i | ||
F-Adminntrative | i 13 84-12 19 F | ||
54.0 A | |||
G-Operational Fer..t iFiptaml | 1 335-84-12 EB RELAYX-A reactor trip resulted from a failed closed diesel generator relay. The relay was repaired and the VMT returned to Power operation. | ||
(**/77 ) | s i | ||
i 1 | |||
i I | |||
2 3 | |||
4 F: Forced Reason: | |||
Method: | |||
Eshibit G. instructions f | |||
S Stheduled A Equiprnent Failure (Explain) 1 Manual for Preparation of Data R-Maintenance or Test 2-Manual Scram. | |||
Entry Sheets for Licensee C Refueling. | |||
3 Automatic Scram. | |||
Event Report (LER) File INUREG. | |||
2 D-Regulatory Restriction | |||
@-Other (Explain) 01611 I:-Operator Training & Ucense Examination 9, | |||
5 F-Adminntrative G-Operational Fer..t iFiptaml 4 | |||
/,e4. Asewc Exhibit I Same Source 4 | |||
(**/77 ) | |||
Il-Other ( Explaini | |||
i | i | ||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE | OF OPERATING EXPERIENCE | ||
~ | |||
DOCKET NO. | DOCKET NO. | ||
50-335 UNIT St. Lucie Unit #1 DATE January 15. 1985' COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH December. 1984 | |||
) | |||
Unit #1 operated at essentially full poweF. | Unit #1 operated at essentially full poweF. | ||
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing. | Inspections and requirements of IE Bulletins and NUREG-0737 are continuing. | ||
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information. | Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. | ||
Refer to correspondence between FPL and NRC for additional information. | |||
In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report month. | In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report month. | ||
i n | i n | ||
AYLl' AGE is All ) UNil POwl t Li VI.L DOCKET NO. | AYLl' AGE is All ) UNil POwl t Li VI.L DOCKET NO. | ||
50-389 UNilst - I neia linit J2 1 /15/85 DATE N. W. Grant COMPLETED BY | |||
TELEMIONE MONTH | ~ | ||
DAY | TELEMIONE MONTH December, 1984 DAY AVER ACE DAILY POWEP. LEVEL DAY AVER ACE DAILY POWER LEVEL IMWe Net) | ||
.(MWe Net) o 807 ij 819 2 | |||
20 5 | Ala is 740 3 | ||
3 | A1n 39 36 4 | ||
809 20 5 | |||
6 | 101 3 | ||
23 a | ~~~ | ||
6 22 7 | |||
144 23 703 a | |||
25 10 | 820 25 10 All 26 13 820 21 3, | ||
13 | 12 820 468 28 13 821 754 29 14 820 815 30 15 819-3 817 16 819 INSTRUCTIONS On this foimat. lat the aserage daily unit power lesel in MWe Nei for each day in the reporting in.inth. Compute o the nearest whiile twgawaii. | ||
28 13 | (9/771 I | ||
16 | |||
OPERATING DATA REPORT DOCKET NO. | OPERATING DATA REPORT 50-3B9 DOCKET NO. | ||
: 1. Unit Name: | DATE _T/ lb/6b COMPLETED BY (N. W. G TELEPHONL 305)S52-3675 OPERATING STATUS St. Lucie Unit #2 Notes | ||
: 2. Reporting reriod. December.1984 | : 1. Unit Name: | ||
Unit #2 operated at | |||
: 2. Reporting reriod. December.1984 power except as indicated in 2560 the' Unit Shutdowns and Power | |||
: 3. Licensed Thennel Power (MW ): | : 3. Licensed Thennel Power (MW ): | ||
850 | 850 f | ||
) | |||
: 4. Namepiste Rating (Gross MWe): | |||
Reducti,ons R6 port. | |||
0# | 0# | ||
: 5. Design Electrical Reting (Net MWe): | : 5. Design Electrical Reting (Net MWe): | ||
832 | 832 | ||
: 6. Maximum Dependable Cepecity (Gross MWe): | : 6. Maximum Dependable Cepecity (Gross MWe): | ||
: 7. Maximum Dependable Capacity (Net MWe): | 786 | ||
: 7. Maximum Dependable Capacity (Net MWe): | |||
: 8. If Changes Occur in Capacity Ratings (leems Number 3 Through 7) Since tast Report,Give Reasone | : 8. If Changes Occur in Capacity Ratings (leems Number 3 Through 7) Since tast Report,Give Reasone | ||
: 9. Power level To Which Restricted. If Any (Net MWe): | : 9. Power level To Which Restricted. If Any (Net MWe): | ||
: 10. Reasons For Restrictions.lf Any: | : 10. Reasons For Restrictions.lf Any: | ||
This Month | This Month Yr to Date Omnulatise 744 8784 12289 | ||
: 11. Hours in Reporting Period | : 11. Hours in Reporting Period 518.5 7379.2 10606.2 | ||
: 12. Number Of Hours Reactor was Critical | : 12. Number Of Hours Reactor was Critical U | ||
U | |||
: 13. Reactor Reserve Shutdown Hours | : 13. Reactor Reserve Shutdown Hours | ||
: 14. Hours Generator On Line | : 14. Hours Generator On Line 497.8 7070.2 10200.6 | ||
: 15. Unit Reserve Shutdown 1(ours 0 | |||
: 16. Gross Thermal Energy Generated (MWH) | 0 0 | ||
: 17. Gross Electrical Energy Genersted (MWH) | : 16. Gross Thermal Energy Generated (MWH) 110a990 177mmn91 | ||
'9ganngAn 400580 5906480 8449700 | |||
: 18. Net Electrical Energy Generated (MWH). | : 17. Gross Electrical Energy Genersted (MWH) 374033 5564826 7962412 | ||
: 20. Unit Availability Factor | : 18. Net Electrical Energy Generated (MWH). | ||
66.9 80.5 83.0 l | |||
: 19. Unit Service Factor 66.9 80.5 83.0 | |||
: 20. Unit Availability Factor | |||
_ 82.4 64.0 80.6 | |||
: 21. Unit Cepecity Factor (Using MDC Net) | : 21. Unit Cepecity Factor (Using MDC Net) | ||
: 22. Unit Cepecity Factor (Using DER Net) 62.5 78.8 80.6-29.3 8.0 8.9 | |||
: 22. Unit Cepecity Factor (Using DER Net) | : 23. Unit Forced Outage Rate i | ||
: 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each): | |||
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | : 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | ||
: 26. Uniss in Test Status (Prior io Commercial Operation): | : 26. Uniss in Test Status (Prior io Commercial Operation): | ||
Forecast Arliiaed INITIAL CRITICALITY l | |||
l | INITI AL ELECTRICITY COMMERCI AL OPER ATION l | ||
rgcn | l rgcn | ||
50-389 DOCKETNO. | 50-389 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. St. Lucie Unit #2 UNIT NAME DATE 1/1 R/R9 | ||
(*$u i REPORT MONT1g Decerrber 1984 b/3 e. | |||
E e | |||
* E5 | Cause & Corrective E | ||
} | |||
16 | * E5 Licensee g*. | ||
with MIC recuirements. | N... | ||
Date E | |||
17 | iE d | ||
18 | .3 s 5 Event 3,7 2 ;lij e Report a mO EO Prevent Recurrence 5I y | ||
U o | |||
c-y v | |||
6 16 84 12 05 S | |||
40 1 A | |||
l CP PUMPXI= | |||
The unit was shutdcwn for the schedulot repair of a reactor coolant ptmp oil leak. Ibliowing repairs full power operation was delayed in order to acrnpl' with MIC recuirements. | |||
~ | |||
17 84 12 18 F | |||
7.2 A | |||
3 389-84-15 EB RELAYX. | |||
The trip of a steam generator feed punp resulted in a reactor. trip on 1ow steam generator level. | |||
18 84 12 19 F | |||
198.9 A | |||
1 389-84-16 EB A r actor trip resulted from a turbine RELAYr trip caused by low condenser vacuun. | |||
Outage extended to repair RCP seals and safety injection valves. | Outage extended to repair RCP seals and safety injection valves. | ||
19 | 19 84 12 27 S | ||
0.0 B | |||
5 ZZ ZZZZZZ Full power operation delayed for secondary chemistry and MFC ocxnpliance. | |||
s_ | s_ | ||
i | i 2 | ||
C Refueling | 3 4 | ||
l.-Operator Training & Ucenw Examination 9 | f Forced Reason: | ||
F Administrative | Method: | ||
Exhibit G -Instructions S Scheduled A Equipment Failure (Explain) | |||
: 1. Manual for Preparation of Data B. Maintenance or Test 2 Manual Scram. | |||
Entry Sheets for Licensee - | |||
C Refueling 3 Automatk Scram. | |||
Event Report ILER) File INtlREG-D-Regulatory Restriction | |||
@-Other (Explain) 0161) l.-Operator Training & Ucenw Examination 9, | |||
5 F Administrative G. Operational I tror if splami c. /. | |||
4. | |||
Aseve.w.ci Ethibit I - Same Source l'8/77) | |||
Il Other IE xplain) | |||
A ' | |||
==SUMMARY== | ==SUMMARY== | ||
OF- OPERATING ?.<PERIENCE | OF-OPERATING ?.<PERIENCE | ||
~ | |||
DOCKET NO. | DOCKET NO. | ||
50-389 UNIT St. Lucie Unit #2 DATE January 15, 1985 COMPLETED BY N. W. Grant TELEPHONE | |||
_ t.tng ) | |||
gg?_tA7s REPORT MONTH Decomher. 1984 See the' Unit Shutdowns and Power Reductions | |||
* Report. | * Report. | ||
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing. | Inspections and requirements of IE Bulletins and NUREG-0737 are continuing. | ||
Florida Power & Light Company comitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information. | Florida Power & Light Company comitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information. | ||
In accordance with requirements of Technical specification 6.9.1.6 there were no challenges to PORV or Safety Valves during the report month. | In accordance with requirements of Technical specification 6.9.1.6 there were no challenges to PORV or Safety Valves during the report month. | ||
| Line 332: | Line 465: | ||
v. | v. | ||
>o FLORIDA POWER & LIGHT COMPANY January 15, 1985 L-85-24 Director, Office of Resource Managemer.t U. S. Nuclear Regulatory Connission Washington, D. C. | |||
FLORIDA POWER & LIGHT COMPANY January 15, 1985 L-85-24 Director, Office of Resource Managemer.t U. S. Nuclear Regulatory Connission Washington, D. C. 20555 | 20555 | ||
==Dear Sir:== | ==Dear Sir:== | ||
Attached are the December 1984 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. 1 and 2. | Attached are the December 1984 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. 1 and 2. | ||
Very truly yours, fY' | Very truly yours, fY' | ||
/otJ.W.Will | |||
Group Vic President Nuclear Energy JWW/NWG/cc Attachment c.;: J. P. O'Reilly, Region II Harold F. Reis, Esquire PNS-LI-85-23 4 | , Jr. | ||
Group Vic President Nuclear Energy JWW/NWG/cc Attachment c.;: | |||
J. P. O'Reilly, Region II Harold F. Reis, Esquire PNS-LI-85-23 4 | |||
V | V | ||
'\\' | |||
PEOPLE ... SERVING PEOPLE}} | PEOPLE... SERVING PEOPLE}} | ||
Latest revision as of 02:43, 13 December 2024
| ML20107A534 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 12/31/1984 |
| From: | Grant N, Williams J FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| L-85-24, NUDOCS 8502200020 | |
| Download: ML20107A534 (17) | |
Text
l AVLl; AGE !)All) UNil POwl t LI VI.t
~
DOCKET NO.
50-250 UNil. Turkey Point Unit #3 DATE 1/15/85 COMPLETED BY N.W. Grant TELEPilONE (305)552-3675 MONTH December, 1984 DAY AVER ACE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL o
IMWe Net)
.(MWe Neil I
6R1 gf 2
682 gg 673 3
675 4
20 674 5
i 6
672 22 7
681 23 g
697 24 9
697 25 10 696 26 696 3
2' 32 694 25 13 29 14 30
~~~
~~~
15 33 I
INSTRUCTIONS On this format.lar the aveuge daily unit power lesel in MWe Nei for cach day in the reportin; m.inth. Compute to the nearest whiite expwast.
8502200020 841231 gDR ADOCK 05000250 f
PDR hi
\\
~
OPERATING DATA RLPORT DOCKET NO- --
DATE.1 /15/85 COMPLETED BY N. W. ' Grant TELEPHONL (305)SS2-3675 OPERATING STATUS Notes
- 1. Unit Name:
Turkey Point Unit #3 See the, Unit Shutdowns and December,1984
- 2. Reporting Period:
2200 Power Reductions" Report
- 3. Licensed Thermal Power (MWI):
0 o'
- 4. Namepiste Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
700
- 6. Maximum Dependable Capacity (Gross MWe):
666
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (llems Number 3 Through 7) Since Last Report, Give Reasone
- 9. Power I.svel To Which Restricted.lf Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr.-to Date Cumulative
- 11. Hours in Repo:1ing Period 744 8784 10RR44.6
- 12. Number Of Hours Reactor Was Critical 288.3 7366.6 73672.8 0
0 844.4
- 13. Reactor Reserve Shutdown Hours 288.3 7357.1 73179.1
- 14. Hours Generator On Line 0
0 121.8
- 15. Unit Reserve Shutdown 1(ours
- 16. Gross Thermal Energy Generated (MWH) 619365 1R640914
-141194;11
- 17. Gross Electrical Energy Generated (MWH) 207160 5046130 48255695 a
- 18. Net Electrial Energy Generated (MWH) 193577 4784209 45697206
- 19. Unit Service Factor 30;8 82.6 69.1
- 20. Unit Availability Factor 38.8 82.6 69.3 39.1 81.8 33 L
- 21. Unit Capacity Factor (Using MDC Net) 37.5 78.6 62.3
- 22. Unit Capacity Factor (Using DER Net) i 61.3 14.7 6.4 i
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht:
Refueling March 30, 1985, 11 weeks 1
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
j
- 26. Units in Test Status (Prior eo Commercial Operation):
Forecast Arisiaed l
INITI AL CRITICALITY l
INITIAL ELECTRICITY COMMERCI AL OPER ATION
1 i
DOCKET NO. 50-250 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME 'rnrkm m,, r+ rh,it #3 DATE l /.l 6186 ND BY PL W Grant REPORT MONTHDecmber, 1984 17.t.EPHONE (305) 552-3675 5
E
]g 3
- E3 Licensee Eg Cause & Corrective
^ ' ' * ' "
i.
N..
Date i
3g it js&
Event 3,7 Ed y=
5 ggg Report a mU Prevent Recurrence b-g l
6 I
19 84 12 13 F
455.7 A
3 250-84-33 Im GENEPA A short to ground in the Unit'#3 generator exciter caused a turbine trip which resulted in a reactor trip.
'Ihe exciter was replaced.
l I
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Esplain) 1 -Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LERI File (NUREG-D-Regulatory Restriction
@-Other iExplain) 0161)
I;-Operator Traming A bcense Esamination k ~ O * ** ** """
5 F Adnunistrative G.Operatomal I ire.r i F splam l s-. f.4.
m,.,#
Ethibit I - Same Source l's/77 )
Il-Other ( E xplain)
SUMMARY
OF OPERATING 2XPERIENCE DOCKET NO..
50-250-UNIT Turkey Point Unit #3.
DATE January 15, 1985 COMPLETED BY N. W. Grant s
TELEPHONE (305) 552-3675 REPORT 110 NTH December, 1984-See the' Unit Shutdowns 'and Power Reductions" Report.
Inspection and requirements of IE Bulletins and NUREG 0737 are continuing.
Florida Power & Light. Company commitments for NUREG-0373 implementation are continuing.
Refer to correspondence between FPL and NRC for additional information.
s 1
1 t
A
i AVLl; AGE DAll i tWil POwi k LI VI.t j
DOCKET NO.
50-251 UNir Turkey Point Unit #4 DATE 1/15/85-COMPLETED BY H. W. Grant TELEPilONE (305)552-3675 MONTH December. 1984 DAY AVER ACE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL i
IMWe. Net)
-(MWe Neu 3
gj 688 2
is 687 3
39 6b9__
385 688 4
20 5
676 al 686 6
677 22 685 7
684 685 23 693 686 g
74 9
692 684 25 10 693 683 26 693 684 12 693 685 28 13 687 686 29 14 6nn 30 685 15 688 684 3,
16 M7 INSTRUCTIONS On this forenas. list the average daily unit pinwer leselin MWe Nes for each day in the rep.istin;in.inth. Compute to the nearest whiite twgawars.
19/77) 9
OPERATING DATA REPORT 50-251 DOCKET NO. P15/85 DATE COMPLETED BYN. W. Grant TELEPHONL (3tnsiS52-3675 OPERATING STATUS Turkey Point Unit #4 Notes
,, g g
- 2. Reporting Period:
December. 19Rd See the unit shutdowns and
- 3. Licensed Thermal Power (MWI):
?200 power reductions report.
- 4. Nameplate Rating (Gross MWe):
6
- 5. Design Electrical Rating (Net MWe):
70n
- 6. Maximum Dependable Capacity (Gross MWe):
666
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report,Give Reasone
- 9. Power 1.nel To Which Restricted. lf Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr..to.Date Cumulative 744 8784 99581
- 11. Hours in Reporting Period 669.1 5079.8 69718.4
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0
.0 166.6
- 14. Hours Generator On.Line 663.4 4772.1 67240.2 0
0 31.2
- 15. Unit Reserve Shutdown gours
.1449439.
10383365 142130106
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 476055 1771ngs; aslopto7 452898 3079222 427R1?R1
- 18. Net Electrical Energy Generated (MWH)'
89.2 54.3 67.5
- 19. Unit Service Factor 1
- 20. Unit Availability Factor 89.2 54.3 67.6 91.4 52.6 6M
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 87~.8 50.6 62.0 10.8 24.1 6.1
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht:
l anuan 2 M (adual)
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior io Commercial Operation):
Forecast Atinioed INITIAL CRITICALITY INITI AL ELECTRICITY COMMERCI AL OPER ATION
DOCKETNO. 50-251 UNIT SHUTDOWNS AND POWER REDUCTIONS UNITNAMETurkev Point tinit (4 -
DATE 1/15/85 CORWLETED BY N.
W-Cran +-
REPORT MONT1g Decmber. 1984
,yq3 qq,,_,q
-_E E*
.] 3 3
j E~
Licensee Eg Cause & Corrective g*b
^ ' ' " ' "
N..
Date i
3g
(
2g&
Event g'2 E
Prevent Recurrence fE j;ji g Report 8 mO H
g d
i 25 84 11 24 F
80.6 A
4 251-84-25 CB CKIBKR Reactor trip on low flow resultirg frcm failed RCP breaker. Breaker repaired.
4 I
2 3
4 1
F Forced Reas m:
Method:
Exhibit G Instructions 5 Stheduled A Equiprnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatoc Scram.
Event Repor:ILER) File (NUREG-D-Regulatory Rest:iction 9-Other (Explain 1 01611 l.-Operator Traming A Ucense Enamination M ~ O *"" ""
5 F-Administrative G-Operati. mal I e r..r I F =plem t x-
/.. a a s e w.,#
Exhibit I - Same Source tas/77)
Il-Other i E xplain t
GUMMARY OF OPERATING EXPERIEECE DOCKET NO.
50-251 UNIT Turkey Point Unit #4 DATE J_anuary 19. 1985 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH pecomher. 1984 o
Unit.#4 operated at essentially full poweF except as noted on Unit Shutdown Report.
Inspection and requirements of IE Bulletin and NUREG -0737 are continuing.
Florida Power & Light Company commitments to NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
a l
. - A.--.-
AVLl; AGE D All i UNil PD*1 }; Ll VI.I DOCKET NO. 50-333 g.,)St. Lucie Unit #1 DATE 1/15/85 N. W. Grant 0051PLETED BY TELEPilONE(305)552-3675 MONm December, 1984 DAY AVER ACE DAILY POWER LEVEL DAY AVER ACE DAILY POWER LEVEL IMWe Net)
-(MWe Net i 852 I
j 853 2
851 is 855 3
""O 19 w7 4
4 850 20 5
851 21 155 6
850 22 780 7
854 23 796 8
857 24 843 9
855 844 25 10 856 838 26 ll 853 27 834 la 854 844 2s 854 845 13 29 14 853 30 846 15 853 816 33 16 RS3 INSTRUCTIONS
'esage daily unis p.mer leselin MWe.Nei for each day :: the reporting month. Compute su he earest hiil asva i,mi S
a
.-g.,-.,
c.,
r-
OPERATING DATA REPORT DOCKET NO.50-335 DATElDb/66 COMPLETED BY( A. W TELEPHONL 305) 552-3675 OPERATING STATUS Notes
- 1. Unit Name: "
I" cia Unit 41 Unit #1 operated at Decomhpr. 14Rd
- 2. Reporting Period:
essentially full power.
2700
- 3. Licensed Thermal Power (MWI):
893
- 4. Nameplate Rating (Gross MWe):
6
- 5. Design Electrical Rating (Net MWe):
g
- 6. Maximum Dependable Capacity (Gross MWe):
~
822
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report,Give Reasone
- 9. Power Level To Which Restricted.lf Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr..to.Date Cinnulative
- 11. Houn in Reporting Period 744 8784 70392
- 12. Number Of Hours Reactor Was Critical 712.7 5555.2 49021.3
- 13. Reactor Reserve Shutdown Hours 0
Oi 205.3 690.0 Esl57.3 48733.5
- 14. Hours Generator On.Line U
U M*3
- 15. Unit Reserve Shutdown Qours 1834566 13469598 "TTT37636 I
- 16. Gross Thermal Energy Generated (MWH) 611080 4484780 39858665
- 17. Gross Electrical Energy Generated (MWH) 578937 4223075 37662348
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
~
92.7 58.7 69.2 92*7 98.7 69.3
- 20. Unit Availability Factor 94.7 68.6 6L3
- 21. Unit Capacity Factor (Using MDC Net) 93.8 58_ 0 65.7
- 22. Unit Capacity Factor (Using DER Net) 7.3 6.4 4.8
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht:
l
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
l
- 26. Units in Test Status (Prior o Commercial Operation):
Forecast Achined l
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION
i UNIT SHUTDOWNS AND POWER REDUCTIONS AME 5t u e Unit #1.
DATE 1/16/85 COttl2TED gy N. W. Grant REPORT MONTH Decomher 1484 TEl.EPHONE (305) 662-3675 e.
E e
i 1g 3
y E~
Licensee
,E g Cause a Corrective g*d N. i.
Daie
{
3g 4
2g&
Event g'1
^ * ' * ' "
E Prevent Recurrence f=
5 jgg Report a mO H
g l
6 i
i 13 84-12 19 F
54.0 A
1 335-84-12 EB RELAYX-A reactor trip resulted from a failed closed diesel generator relay. The relay was repaired and the VMT returned to Power operation.
s i
i 1
i I
2 3
4 F: Forced Reason:
Method:
Eshibit G. instructions f
S Stheduled A Equiprnent Failure (Explain) 1 Manual for Preparation of Data R-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling.
3 Automatic Scram.
Event Report (LER) File INUREG.
2 D-Regulatory Restriction
@-Other (Explain) 01611 I:-Operator Training & Ucense Examination 9,
5 F-Adminntrative G-Operational Fer..t iFiptaml 4
/,e4. Asewc Exhibit I Same Source 4
(**/77 )
Il-Other ( Explaini
i
SUMMARY
OF OPERATING EXPERIENCE
~
DOCKET NO.
50-335 UNIT St. Lucie Unit #1 DATE January 15. 1985' COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH December. 1984
)
Unit #1 operated at essentially full poweF.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing.
Refer to correspondence between FPL and NRC for additional information.
In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report month.
i n
AYLl' AGE is All ) UNil POwl t Li VI.L DOCKET NO.
50-389 UNilst - I neia linit J2 1 /15/85 DATE N. W. Grant COMPLETED BY
~
TELEMIONE MONTH December, 1984 DAY AVER ACE DAILY POWEP. LEVEL DAY AVER ACE DAILY POWER LEVEL IMWe Net)
.(MWe Net) o 807 ij 819 2
Ala is 740 3
A1n 39 36 4
809 20 5
101 3
~~~
6 22 7
144 23 703 a
820 25 10 All 26 13 820 21 3,
12 820 468 28 13 821 754 29 14 820 815 30 15 819-3 817 16 819 INSTRUCTIONS On this foimat. lat the aserage daily unit power lesel in MWe Nei for each day in the reporting in.inth. Compute o the nearest whiile twgawaii.
(9/771 I
OPERATING DATA REPORT 50-3B9 DOCKET NO.
DATE _T/ lb/6b COMPLETED BY (N. W. G TELEPHONL 305)S52-3675 OPERATING STATUS St. Lucie Unit #2 Notes
- 1. Unit Name:
Unit #2 operated at
- 2. Reporting reriod. December.1984 power except as indicated in 2560 the' Unit Shutdowns and Power
- 3. Licensed Thennel Power (MW ):
850 f
)
- 4. Namepiste Rating (Gross MWe):
Reducti,ons R6 port.
0#
- 5. Design Electrical Reting (Net MWe):
832
- 6. Maximum Dependable Cepecity (Gross MWe):
786
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (leems Number 3 Through 7) Since tast Report,Give Reasone
- 9. Power level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr to Date Omnulatise 744 8784 12289
- 11. Hours in Reporting Period 518.5 7379.2 10606.2
- 12. Number Of Hours Reactor was Critical U
U
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On Line 497.8 7070.2 10200.6
- 15. Unit Reserve Shutdown 1(ours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 110a990 177mmn91
'9ganngAn 400580 5906480 8449700
- 17. Gross Electrical Energy Genersted (MWH) 374033 5564826 7962412
- 18. Net Electrical Energy Generated (MWH).
66.9 80.5 83.0 l
- 19. Unit Service Factor 66.9 80.5 83.0
- 20. Unit Availability Factor
_ 82.4 64.0 80.6
- 21. Unit Cepecity Factor (Using MDC Net)
- 22. Unit Cepecity Factor (Using DER Net) 62.5 78.8 80.6-29.3 8.0 8.9
- 23. Unit Forced Outage Rate i
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Uniss in Test Status (Prior io Commercial Operation):
Forecast Arliiaed INITIAL CRITICALITY l
INITI AL ELECTRICITY COMMERCI AL OPER ATION l
l rgcn
50-389 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. St. Lucie Unit #2 UNIT NAME DATE 1/1 R/R9
(*$u i REPORT MONT1g Decerrber 1984 b/3 e.
E e
Cause & Corrective E
}
- E5 Licensee g*.
N...
Date E
iE d
.3 s 5 Event 3,7 2 ;lij e Report a mO EO Prevent Recurrence 5I y
U o
c-y v
6 16 84 12 05 S
40 1 A
l CP PUMPXI=
The unit was shutdcwn for the schedulot repair of a reactor coolant ptmp oil leak. Ibliowing repairs full power operation was delayed in order to acrnpl' with MIC recuirements.
~
17 84 12 18 F
7.2 A
3 389-84-15 EB RELAYX.
The trip of a steam generator feed punp resulted in a reactor. trip on 1ow steam generator level.
18 84 12 19 F
198.9 A
1 389-84-16 EB A r actor trip resulted from a turbine RELAYr trip caused by low condenser vacuun.
Outage extended to repair RCP seals and safety injection valves.
19 84 12 27 S
0.0 B
5 ZZ ZZZZZZ Full power operation delayed for secondary chemistry and MFC ocxnpliance.
s_
i 2
3 4
f Forced Reason:
Method:
Exhibit G -Instructions S Scheduled A Equipment Failure (Explain)
- 1. Manual for Preparation of Data B. Maintenance or Test 2 Manual Scram.
Entry Sheets for Licensee -
C Refueling 3 Automatk Scram.
Event Report ILER) File INtlREG-D-Regulatory Restriction
@-Other (Explain) 0161) l.-Operator Training & Ucenw Examination 9,
5 F Administrative G. Operational I tror if splami c. /.
4.
Aseve.w.ci Ethibit I - Same Source l'8/77)
Il Other IE xplain)
A '
SUMMARY
OF-OPERATING ?.<PERIENCE
~
DOCKET NO.
50-389 UNIT St. Lucie Unit #2 DATE January 15, 1985 COMPLETED BY N. W. Grant TELEPHONE
_ t.tng )
gg?_tA7s REPORT MONTH Decomher. 1984 See the' Unit Shutdowns and Power Reductions
- Report.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company comitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
In accordance with requirements of Technical specification 6.9.1.6 there were no challenges to PORV or Safety Valves during the report month.
4 I
l 4
v.
>o FLORIDA POWER & LIGHT COMPANY January 15, 1985 L-85-24 Director, Office of Resource Managemer.t U. S. Nuclear Regulatory Connission Washington, D. C.
20555
Dear Sir:
Attached are the December 1984 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. 1 and 2.
Very truly yours, fY'
/otJ.W.Will
, Jr.
Group Vic President Nuclear Energy JWW/NWG/cc Attachment c.;:
J. P. O'Reilly, Region II Harold F. Reis, Esquire PNS-LI-85-23 4
V
'\\'
PEOPLE... SERVING PEOPLE