WQLF CREEK NUCLEAR OPERATING CORPORATION l
l WQLF CREEK NUCLEAR OPERATING CORPORATION I
I 1
1 l
l Otto L. Maynard Vice President Plant Operations l
Otto L. Maynard Vice President Plant Operations l
l I
l I
l                                                                                     April 15, 1996 l
l April 15, 1996 l
f WO 96-0063 l
f WO 96-0063 l
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk j         Mail Station P1-137 l         Washington, D. C. 20555
U.
S.
Nuclear Regulatory Commission ATTN:
Document Control Desk j
Mail Station P1-137 l
Washington, D.
C.
20555


==Subject:==
==Subject:==
Docket No. 50-402: Lrch, 1996, Monthly
Docket No. 50-402: Lrch, 1996, Monthly
(                                           Operating Report l
(
Operating Report l
Gentlemen:
Gentlemen:
Attached is the March,                   1996,     Monthly Operating Report for Wolf Creek Generating Station.                 This submittal is being. made in accordance with the requirements of Technical Specification 6.9.1.8.
Attached is the March,
Very truly yours, 1                                                                                     (j               Atj')4L" Otto L. Maynard OLM/jad Attachment i
: 1996, Monthly Operating Report for Wolf Creek Generating Station.
i cc:     L. J. Callan (NRC), w/a j                   W. D. Johnson (NRC) , w/a
This submittal is being. made in accordance with the requirements of Technical Specification 6.9.1.8.
;                  J. F. Ringwald (NRC) , w/a J. C. Stone (NRC), w/a i
Very truly yours, 1
(j Atj')4L" Otto L. Maynard OLM/jad Attachment i
i cc:
L.
J. Callan (NRC), w/a j
W.
D. Johnson (NRC), w/a J.
F.
Ringwald (NRC), w/a J.
C.
Stone (NRC), w/a i
d 190020 1
d 190020 1
9604190078 960331 i               PDR ADOCK 05000482                                                                             ;
9604190078 960331 i
<                R                          PDR PO. Box 411/ Durlington, KS 66839 / Phone (316) 364 8831         ,
PDR ADOCK 05000482 R
;                                                      ___                                                          i
PDR PO. Box 411/ Durlington, KS 66839 / Phone (316) 364 8831 i


i
i 4
* 4
Attachment to WO 96-0063 l
;            Attachment to WO 96-0063 l             page 1 of 6 l
page 1 of 6 l
I i
I i
WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK 6ENERATING STATION MONTHLY OPERATING REPORT McMH z       March     YEAR:   1996 Docket No.: 50-482 Facility Operating License No.:   NPF-42 Report No. 133 I                                   ,
WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK 6ENERATING STATION MONTHLY OPERATING REPORT McMH z March YEAR:
1996 Docket No.:
50-482 Facility Operating License No.:
NPF-42 Report No.
133 I
i i
i i


  . . _ -      . . - . . _ _ _ _ _ _ _ . _ . _ _ _ . _ _ _ _ _ _                      _. _ . _.. _ . _ ._ ..__. _ ._ - .          _.._m.m Attaclimsnt to WO 96-0063
_.._m.m
'Attaclimsnt to WO 96-0063


==SUMMARY==
==SUMMARY==
 
i The following report highlights the operating experience of Wolf Creek Generating Station for the month of March, 1996.
i The following report highlights the operating experience of Wolf Creek Generating Station for the month of March, 1996.                                   This report is being provided pursuant to Technical                   i Specification 6.9.1.8.
This report is being provided pursuant to Technical i
I.        
Specification 6.9.1.8.
I.


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE l
OF OPERATING EXPERIENCE l
The unit remained in outage conditions throughout the month of Maren, 1996, as                                             '
The unit remained in outage conditions throughout the month of Maren, 1996, as
                      ' activities associated with Refuel VIII continued. The unit completed reloading fuel on March 16, 1996 in Mode 6. The unit entered                         Mode 5 at 1343 on March 20, 1996, and entered Mode 4 at 0313 on March 29, 1996.
' activities associated with Refuel VIII continued. The unit completed reloading fuel on March 16, 1996 in Mode 6.
The unit entered Mode 5 at 1343 on March 20, 1996, and entered Mode 4 at 0313 on March 29, 1996.
I l
I l
II.       MAJOR SAFETY RELATED MAINTENANCE ACTIVITIES Reactor Coolant System check valve repair "B"       Residual Heat Removal System "B"       Train Essiential Service Water System "B"       Component Cooling Water System i
II.
MAJOR SAFETY RELATED MAINTENANCE ACTIVITIES Reactor Coolant System check valve repair "B" Residual Heat Removal System "B" Train Essiential Service Water System "B" Component Cooling Water System i
Check Valve Flow and Testing Safety Injection Pump Testing
Check Valve Flow and Testing Safety Injection Pump Testing
                        *B' Diesel Generator Maintenance                       and Testing "B"       Train NK Battery Replacement Accumulator Safecy Injection System Maintenance                                                                             l ASME 10-Year Inservice Inspection "B" Centrifugal Charging Pump Maintenance                                                                                   ,
*B' Diesel Generator Maintenance and Testing "B" Train NK Battery Replacement Accumulator Safecy Injection System Maintenance ASME 10-Year Inservice Inspection "B" Centrifugal Charging Pump Maintenance i
i i
i 1
1 a
a 1
1 1
1 j
j                                                                                                                  Wolf Creek Generating Station j                                                                                                                 Monthly Operating Report j                                                                                                                 March, 1996
Wolf Creek Generating Station j
!                                                                                                                Page 2 of 6 l
Monthly Operating Report j
March, 1996 Page 2 of 6 l
4 l
4 l


Attachm:nt to WO 96-0063 OPERATING DATA RCPORT DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 4-9-96 TELEPHONE 316-364-9931 OPERATING STATUS
Attachm:nt to WO 96-0063 OPERATING DATA RCPORT DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 4-9-96 TELEPHONE 316-364-9931 OPERATING STATUS 1.
: 1. Reporting Period:     March, 1996           Gross Hours in Reporting Period:           744
Reporting Period:
: 2. Currently Authorized Power Level (MWt) :   3565   Max. Depend. Capacity (MWe-Net): 1167 l
March, 1996 Gross Hours in Reporting Period:
Design Electrical Rating (MWe -Net) :     1170
744 2.
: 3. Power Level to Which Restricted (If Any) (MWe-Net) :   N/A
Currently Authorized Power Level (MWt) :
: 4. Reasons for Restriction (If Any) : N/A This Month     Yr. to Date       Cumulative
3565 Max. Depend. Capacity (MWe-Net): 1167 Design Electrical Rating (MWe -Net) :
: 5. Number of Hours Reactor was Critical         0.0             699.6             75,316.4 l
1170 3.
: 6. Reactor Reserve Shutdown Hours               0.0             0.0               339.8
Power Level to Which Restricted (If Any) (MWe-Net) :
: 7. Hours Generator on Line                     0.0             699.6             74,479.3
N/A 4.
: 8. Unit Reserve Shutdown Hours                 0.0             0.0               0.0
Reasons for Restriction (If Any) : N/A This Month Yr. to Date Cumulative 5.
: 9. Gross Thermal Energy Generated (MWh)         0.0             2,481,700         247,823,370
Number of Hours Reactor was Critical 0.0 699.6 75,316.4 6.
: 10.     Gross Electrical Energy Generated (MWh)     0.0             863,196           86,122,116 1
Reactor Reserve Shutdown Hours 0.0 0.0 339.8 7.
: 11. Net Electrical Energy Generated (MWh)       0.0             799,354           82,236,205 l
Hours Generator on Line 0.0 699.6 74,479.3 8.
: 12. Reactor Servics Factor                       0.0%           32.0%             81.2%
Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.
: 13. Reactor Availability Factor                 0.0%           32.0%             81.6%
Gross Thermal Energy Generated (MWh) 0.0 2,481,700 247,823,370 10.
: 14. Unit Service Factor                         0.0%           32.0%             80.3%
Gross Electrical Energy Generated (MWh) 0.0 863,196 86,122,116 11.
: 15. Unit Availability Factor                     0.0%           32.0%             80.3%
Net Electrical Energy Generated (MWh) 0.0 799,354 82,236,205 12.
: 16. Unit Capacity Factor (Using MDC)             0.0%           31.4%             78.0%
Reactor Servics Factor 0.0%
: 17.     Unit Capacity Factor (Using Design MWe)     0.0%           31.3%             75.8%
32.0%
: 18. Unit Forced Outage Rate                     0.0%           13.6%             4.8%
81.2%
: 19.     Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each).
13.
Wolf Creek Generating Station returned on-line April 7, 1996, after Refuel VIII l               outage, a total of 65 days.
Reactor Availability Factor 0.0%
l
32.0%
: 20.     If Shut Down at End of Report Period, Estimate Date of Startup:           N/A 4
81.6%
Wolf Creek Generating Station i                                                                    Monthly Operating Report l                                                                     March, 1996 l                                                                     Page 3 of 6
14.
Unit Service Factor 0.0%
32.0%
80.3%
15.
Unit Availability Factor 0.0%
32.0%
80.3%
16.
Unit Capacity Factor (Using MDC) 0.0%
31.4%
78.0%
17.
Unit Capacity Factor (Using Design MWe) 0.0%
31.3%
75.8%
18.
Unit Forced Outage Rate 0.0%
13.6%
4.8%
19.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each).
Wolf Creek Generating Station returned on-line April 7,
1996, after Refuel VIII l
outage, a total of 65 days.
l 20.
If Shut Down at End of Report Period, Estimate Date of Startup:
N/A 4
Wolf Creek Generating Station Monthly Operating Report i
l March, 1996 l
Page 3 of 6


ttschmsnt to UO 96-0063 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE .4.9 5 TELEPHONE 316-364-88n MONTH     March, 1996 DAY AVERAGE DAILY POWER LEVEL       DAY AVERAG3 DAILY POWER LEVEL         I (MWe-Net)                           (MWe-Net) 1                   0             17                   0 2                   0             18                   0 3                   0             19                   0 4                   0             20                   0 5                 0             21                   0 6                   0             22                   0 7                   0             23                   0                       ,
ttschmsnt to UO 96-0063 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE.4.9 5 TELEPHONE 316-364-88n MONTH March, 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAG3 DAILY POWER LEVEL (MWe-Net)
1 8                   0             24                   0 9                   0             25                   0                       l l
(MWe-Net) 1 0
10                   0             26                   0 11                   0             27                   0 12                   0             28                   0                       1 13                   0             29                   0 14                   0             30                   0 l
17 0
15                   0             31                   0 16                   0 l
2 0
l Wolf Creek Generating Station Monthly Operating Report
18 0
;                                                March, 1396 Page 4 of 6 i
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
l Wolf Creek Generating Station Monthly Operating Report March, 1396 Page 4 of 6 i


Attachment to WO 96-0063
Attachment to WO 96-0063
                                                                                                                                                                                                                                                                    ~
~
UNIT SHUTDOWN AND POWER REDUCTIONS                                                                                                                                                             ,
UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO. 50I482 WOLF CREEK GENERATING STATION-WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 4-9-96 TELEPHONE 316-364-8831 Type METHOD OF SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COMMENTS No Date S: SCHEDULED (Hours)
DOCKET NO. 50I482 WOLF CREEK GENERATING STATION-WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 4-9-96 TELEPHONE 316-364-8831 Type                                                                                                   METHOD OF SHUTTING F: FORCED     DURATION   REASON                                                                                       DOWN THE REACTOR         CORRECTIVE ACTIONS / COMMENTS No     Date                   S: SCHEDULED   (Hours)     (1)                                                                   OR REDUCING POWER (2) 1     3/1/96                         S         744         C                                                                                                   4 The unit remained in outage conditions throughout the month of March,         1996, for Refuel VIII.
(1)
OR REDUCING POWER (2) 1 3/1/96 S
744 C
4 The unit remained in outage conditions throughout the month of March,
: 1996, for Refuel VIII.


==SUMMARY==
==SUMMARY==
: The unit remained in outage conditions during the month of March, 1996, as activities associated with Refuel VIII continued.                   The unit completed reloading fuel on March 16, 1996 in Mode 6.                                                                                   The unit entered Mode 5 at 1343 on March 20, 1996, and entered Mode 4 at 0313 on March 29, 1996.
: The unit remained in outage conditions during the month of March, 1996, as activities associated with Refuel VIII continued.
: 1)   REASON: A: EQUIPMENT FAILURE (EXPLAIN)                 E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD: 1. MANUAL B: MAINTENANCE OR TEST                         F: ADMINISTRATIVE                                                                                                                         2. MANUAL SCRAM C: REFUELING                                   G: OPERATIONAL ERROR (EXPLAIN)                                                                                                             3. AUTOMATIC SCRAM D: REGULATORY RESTRICTION                       H: OTHER (EXPLAIN)                                                                                                                         4. CONTINUED
The unit completed reloading fuel on March 16, 1996 in Mode 6.
: 5. REDUCED LOAD
The unit entered Mode 5 at 1343 on March 20, 1996, and entered Mode 4 at 0313 on March 29, 1996.
: 9. OTHER Wolf Creek Generating Station Monthly Operating Report March, 1996 Page 5 of 6
1)
REASON: A: EQUIPMENT FAILURE (EXPLAIN)
E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:
1.
MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2.
MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN)
: 3. AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4.
CONTINUED 5.
REDUCED LOAD 9.
OTHER Wolf Creek Generating Station Monthly Operating Report March, 1996 Page 5 of 6


  .      ..    ._...____..___.__.._.m...         _ _ _ _ . . _ . . . . _ - , _ _ _ . _ _ , _ . . . . . . . _                                .        - . - . . . . . _ _ _ . _ . . _ _ _
._...____..___.__.._.m...
s                   '
s Attachment to-WO 96-0063 WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION UNIT NO. 1 MONTH March, 1996 l
Attachment to-WO 96-0063 WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION UNIT NO. 1 MONTH                     March, 1996 l


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE
OF OPERATING EXPERIENCE
        . Listed below in chronological sequence is a summary of operating experiences for this mont? .;hich required load reduction or resulted in significant non-load related incidents.
. Listed below in chronological sequence is a summary of operating experiences for this mont?.;hich required load reduction or resulted in significant non-load related incidents.
DATE                             TIME                             EVENT 3/1/96                         0000                             The           unit                   remained                 in   outage       conditions throughout                         the     month of March,                       1996,               as activities                             associated               with   Refuel                     VIII-continued.                           The unit completed reloading fuel on March 16, 1996 in Mode 6.                                           The unit entered                                 I
DATE TIME EVENT 3/1/96 0000 The unit remained in outage conditions throughout the month of
(                                                                           Mode 5 at 1343 on March 20, 1996, and entered j                                                                           Mode 4 at 0313 on March 29, 1996.                                                                                       l l
: March, 1996, as activities associated with Refuel VIII-continued.
The unit completed reloading fuel on March 16, 1996 in Mode 6.
The unit entered
(
Mode 5 at 1343 on March 20, 1996, and entered j
Mode 4 at 0313 on March 29, 1996.
1 I
1 I
l                                                                                                                                                                                                   I l
l l
i l
i l
l                                                                                                                                                                                                    l 1
1 l
l l
l!'
l l
+
+
l l
l l
j                                                                                                                                         Wolf Creek Generating Station l                                                                                                                                         Monthly Operating Report i                                                                                                                                         March, 1996 f                                                                                                                                         Page 6 of 6
j Wolf Creek Generating Station l
Monthly Operating Report i
March, 1996 f
Page 6 of 6
}
}
I 2   ._
I 2
_  _      . _ _        . . _ _                                  , _ _      , . _ _ _ . , _                . _ _ . _ . _ _ _ _ _ _          ___i .}}
___i
.}}

Latest revision as of 02:17, 13 December 2024

Monthly Operating Rept for March 1996 for WCGS
ML20107D897
Person / Time
Site: Wolf Creek 
Issue date: 03/31/1996
From: Maynard O
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
WO-96-0063, WO-96-63, NUDOCS 9604190078
Download: ML20107D897 (7)


Text

i i

~

~

WQLF CREEK NUCLEAR OPERATING CORPORATION l

I 1

l Otto L. Maynard Vice President Plant Operations l

l I

l April 15, 1996 l

f WO 96-0063 l

U.

S.

Nuclear Regulatory Commission ATTN:

Document Control Desk j

Mail Station P1-137 l

Washington, D.

C.

20555

Subject:

Docket No. 50-402: Lrch, 1996, Monthly

(

Operating Report l

Gentlemen:

Attached is the March,

1996, Monthly Operating Report for Wolf Creek Generating Station.

This submittal is being. made in accordance with the requirements of Technical Specification 6.9.1.8.

Very truly yours, 1

(j Atj')4L" Otto L. Maynard OLM/jad Attachment i

i cc:

L.

J. Callan (NRC), w/a j

W.

D. Johnson (NRC), w/a J.

F.

Ringwald (NRC), w/a J.

C.

Stone (NRC), w/a i

d 190020 1

9604190078 960331 i

PDR ADOCK 05000482 R

PDR PO. Box 411/ Durlington, KS 66839 / Phone (316) 364 8831 i

i 4

Attachment to WO 96-0063 l

page 1 of 6 l

I i

WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK 6ENERATING STATION MONTHLY OPERATING REPORT McMH z March YEAR:

1996 Docket No.:

50-482 Facility Operating License No.:

NPF-42 Report No.

133 I

i i

_.._m.m

'Attaclimsnt to WO 96-0063

SUMMARY

i The following report highlights the operating experience of Wolf Creek Generating Station for the month of March, 1996.

This report is being provided pursuant to Technical i

Specification 6.9.1.8.

I.

SUMMARY

OF OPERATING EXPERIENCE l

The unit remained in outage conditions throughout the month of Maren, 1996, as

' activities associated with Refuel VIII continued. The unit completed reloading fuel on March 16, 1996 in Mode 6.

The unit entered Mode 5 at 1343 on March 20, 1996, and entered Mode 4 at 0313 on March 29, 1996.

I l

II.

MAJOR SAFETY RELATED MAINTENANCE ACTIVITIES Reactor Coolant System check valve repair "B" Residual Heat Removal System "B" Train Essiential Service Water System "B" Component Cooling Water System i

Check Valve Flow and Testing Safety Injection Pump Testing

  • B' Diesel Generator Maintenance and Testing "B" Train NK Battery Replacement Accumulator Safecy Injection System Maintenance ASME 10-Year Inservice Inspection "B" Centrifugal Charging Pump Maintenance i

i 1

a 1

1 j

Wolf Creek Generating Station j

Monthly Operating Report j

March, 1996 Page 2 of 6 l

4 l

Attachm:nt to WO 96-0063 OPERATING DATA RCPORT DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 4-9-96 TELEPHONE 316-364-9931 OPERATING STATUS 1.

Reporting Period:

March, 1996 Gross Hours in Reporting Period:

744 2.

Currently Authorized Power Level (MWt) :

3565 Max. Depend. Capacity (MWe-Net): 1167 Design Electrical Rating (MWe -Net) :

1170 3.

Power Level to Which Restricted (If Any) (MWe-Net) :

N/A 4.

Reasons for Restriction (If Any) : N/A This Month Yr. to Date Cumulative 5.

Number of Hours Reactor was Critical 0.0 699.6 75,316.4 6.

Reactor Reserve Shutdown Hours 0.0 0.0 339.8 7.

Hours Generator on Line 0.0 699.6 74,479.3 8.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.

Gross Thermal Energy Generated (MWh) 0.0 2,481,700 247,823,370 10.

Gross Electrical Energy Generated (MWh) 0.0 863,196 86,122,116 11.

Net Electrical Energy Generated (MWh) 0.0 799,354 82,236,205 12.

Reactor Servics Factor 0.0%

32.0%

81.2%

13.

Reactor Availability Factor 0.0%

32.0%

81.6%

14.

Unit Service Factor 0.0%

32.0%

80.3%

15.

Unit Availability Factor 0.0%

32.0%

80.3%

16.

Unit Capacity Factor (Using MDC) 0.0%

31.4%

78.0%

17.

Unit Capacity Factor (Using Design MWe) 0.0%

31.3%

75.8%

18.

Unit Forced Outage Rate 0.0%

13.6%

4.8%

19.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each).

Wolf Creek Generating Station returned on-line April 7,

1996, after Refuel VIII l

outage, a total of 65 days.

l 20.

If Shut Down at End of Report Period, Estimate Date of Startup:

N/A 4

Wolf Creek Generating Station Monthly Operating Report i

l March, 1996 l

Page 3 of 6

ttschmsnt to UO 96-0063 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE.4.9 5 TELEPHONE 316-364-88n MONTH March, 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAG3 DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

l Wolf Creek Generating Station Monthly Operating Report March, 1396 Page 4 of 6 i

Attachment to WO 96-0063

~

UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO. 50I482 WOLF CREEK GENERATING STATION-WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 4-9-96 TELEPHONE 316-364-8831 Type METHOD OF SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COMMENTS No Date S: SCHEDULED (Hours)

(1)

OR REDUCING POWER (2) 1 3/1/96 S

744 C

4 The unit remained in outage conditions throughout the month of March,

1996, for Refuel VIII.

SUMMARY

The unit remained in outage conditions during the month of March, 1996, as activities associated with Refuel VIII continued.

The unit completed reloading fuel on March 16, 1996 in Mode 6.

The unit entered Mode 5 at 1343 on March 20, 1996, and entered Mode 4 at 0313 on March 29, 1996.

1)

REASON: A: EQUIPMENT FAILURE (EXPLAIN)

E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:

1.

MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2.

MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN)

3. AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4.

CONTINUED 5.

REDUCED LOAD 9.

OTHER Wolf Creek Generating Station Monthly Operating Report March, 1996 Page 5 of 6

._...____..___.__.._.m...

s Attachment to-WO 96-0063 WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION UNIT NO. 1 MONTH March, 1996 l

SUMMARY

OF OPERATING EXPERIENCE

. Listed below in chronological sequence is a summary of operating experiences for this mont?.;hich required load reduction or resulted in significant non-load related incidents.

DATE TIME EVENT 3/1/96 0000 The unit remained in outage conditions throughout the month of

March, 1996, as activities associated with Refuel VIII-continued.

The unit completed reloading fuel on March 16, 1996 in Mode 6.

The unit entered

(

Mode 5 at 1343 on March 20, 1996, and entered j

Mode 4 at 0313 on March 29, 1996.

1 I

l l

i l

1 l

l!'

+

l l

j Wolf Creek Generating Station l

Monthly Operating Report i

March, 1996 f

Page 6 of 6

}