ML20107M150: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 21: Line 21:
{{#Wiki_filter:_.
{{#Wiki_filter:_.
Mailing Address -
Mailing Address -
                      ' Alabzmn Powsr Company -
' Alabzmn Powsr Company -
600 North 18th Strest -
600 North 18th Strest -
    'I;
'I;
                      - Post Office Box 2641 Birmingham, Alabama 35291
- Post Office Box 2641 Birmingham, Alabama 35291
: Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Building                                                                         AlabamaPower t"e sou:%m escr c s, s:em November 6,1984
: Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Building AlabamaPower t"e sou:%m escr c s, s:em November 6,1984
                  -Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant (FNP) - Units 1 and 2 Licensing Items Requiring NRC Approval Gentlemen:
-Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant (FNP) - Units 1 and 2 Licensing Items Requiring NRC Approval Gentlemen:
Attached for your information is an updated status of 1984 licensing items identified in Alabama Power Company's letter dated Oc tober 10, 1984. This attachment is tabulated chronologically by Alabama Power Company's requested NRC approval date. Alabar,1a Power Company is ready to discuss modifications to this status to address all licensing issues.
Attached for your information is an updated status of 1984 licensing items identified in Alabama Power Company's letter dated Oc tober 10, 1984. This attachment is tabulated chronologically by Alabama Power Company's requested NRC approval date. Alabar,1a Power Company is ready to discuss modifications to this status to address all licensing issues.
Alabama Power Company acknowledges and appreciates the recent NRC                                                         '
Alabama Power Company acknowledges and appreciates the recent NRC efforts to' complete licensing action on items 16,17,18,19, and 20 of the attached list. There remains, however, 4 items which are.still required to support the upcoming Unit 2 refueling outage which is-scheduled to-start January 4,1985. Specifically, item 28 of the attachment, Revised Heatup and Cooldown Curves, requests deletion of the requirement to remove a reactor vessel capsule during the next Unit 2 refueling outage. As a result of. higher than anticipated fuel burnup resulting in an earlier planned start of the refueling outage and finalization'of ongoing detailed outage planning, the critical date for-a decision on removal of the reactor vessel capsule has been advanced to
efforts to' complete licensing action on items 16,17,18,19, and 20 of the attached list. There remains, however, 4 items which are .still required to support the upcoming Unit 2 refueling outage which is-scheduled to-start January 4,1985. Specifically, item 28 of the attachment, Revised Heatup and Cooldown Curves, requests deletion of the requirement to remove a reactor vessel capsule during the next Unit 2 refueling outage. As a result of. higher than anticipated fuel burnup resulting in an earlier planned start of the refueling outage and finalization'of ongoing detailed outage planning, the critical date for-a decision on removal of the reactor vessel capsule has been advanced to
' January 4,1985. Without an NRC decision by that date Alabama Power Company will be required to either unnecessarily remove a reactor vessel
                  ' January 4,1985. Without an NRC decision by that date Alabama Power Company will be required to either unnecessarily remove a reactor vessel
-capsule or place itself in jeopardy of extending the outage critical path if approval by NRC is not obtained prior to scheduled startup.
                  -capsule or place itself in jeopardy of extending the outage critical path if approval by NRC is not obtained prior to scheduled startup.
0 g411140044 841106 0,
g411140044 841106                                                                                               0, 0 PDR ADOCK 05000348       PDR       . $,
PDR ADOCK 05000348 PDR l
  .                    p                                                                                                    l            i   g L                                                                                                                                               1
i g
_ _ . _ -_-              .                            , . . . _ _ _ . _ . , _ _ _ . _ , _ - _ . , . . _ . _ _ _ _ . _ . , . _ _ _ . ~ . . _ . _
p L
1
, _ - _.,.. _. _ _ _ _. _.,. _ _ _. ~.. _. _


. Mr. S. A. Varga                                                             November 6, 1984 U. S. Nuclear Regulatory Comaission                                         Page 2
Mr. S. A. Varga November 6, 1984 U. S. Nuclear Regulatory Comaission Page 2
          ' Two new items have been added to the attached list. These items arc a request for a Pollution Control Bond Issue Certificate (item 22) and an Administrative change to provide greater working hour flexibility for the operating staff (item 26). NRC staff action is requested in accordance with the attached list for these two new items.                               It is Alabama Power Company's understanding that the attached Licensing Items list agrees with the current NRC schedule. The attached schedule is considered acceptable to Alabama Power Company.
' Two new items have been added to the attached list. These items arc a request for a Pollution Control Bond Issue Certificate (item 22) and an Administrative change to provide greater working hour flexibility for the operating staff (item 26). NRC staff action is requested in accordance with the attached list for these two new items.
It is Alabama Power Company's understanding that the attached Licensing Items list agrees with the current NRC schedule. The attached schedule is considered acceptable to Alabama Power Company.
If you have any questions, please advise.
If you have any questions, please advise.
o Yours truly, L
o Yours truly, hs L
R. P. Mcdonald hs RPM /CJS:bdh-D16 Attachment cc: Mr. L. B. Long Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford
R. P. Mcdonald RPM /CJS:bdh-D16 Attachment cc: Mr. L. B. Long Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford


ATTACIMENT                         PAGE 1 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED   ACTUAL       REQUESTED     ACTUAL APCo     APCo             NRC       NRC       NRC SUBMITTAL SUBMITTAL     APPROVAL     APPROVAL   TAC ITEM             DATE     DATE(S)       DATE         DATE       #  REMARKS
ATTACIMENT PAGE 1 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
: 1. Emergency        ---      10-25-82         ---        01-06-84  ---    COMPLETE Preparedness Program Audit Once Per 12 Months, FNP-1 and 2
DATE DATE REMARKS 01-06-84 COMPLETE 10-25-82 1.
: 2. Administrative   ---      04-06-83         ---        01-09-84 ---    COMPLETE Change to Footnote to T.S. Tabl e 3.3-3, FNP-1 and 2
Emergency Preparedness Program Audit Once Per 12 Months, FNP-1 and 2 2.
    .3. Administrative    ---      12-10-82         ---        01-10-84  ---
Administrative 04-06-83 01-09-84 COMPLETE Change to Footnote to T.S. Tabl e 3.3-3, FNP-1 and 2 01-10-84 COMPLETE 12-10-82
COMPLETE Change to T.S.
.3.
Table 3.7-4a, FNP-2
Administrative Change to T.S.
: 4. Change for        ---      10-08-82         ---        01-27-84  ---
Table 3.7-4a, FNP-2 01-27-84 COMPLETE 10-08-82 4.
COMPLETE Turbine Valve Testing, FNP-1 and 2
Change for Turbine Valve Testing, FNP-1 and 2 5.
: 5. Correct Fire     ---      08-26-83         ---        02-09-84 ---    COMPLETE Protection Technical Specifications, FNP-1 and 2
Correct Fire 08-26-83 02-09-84 COMPLETE Protection Technical Specifications, FNP-1 and 2 02-29-84 COMPLETE 05-27-84 6.
: 6. Administrative    ---      05-27-84         ---        02-29-84  ---    COMPLETE Change to Table 3.7-4a, FNP-1 1
Administrative Change to Table 3.7-4a, FNP-1 1
: 7. Correct Snubber  ---      05-27-83         ---        02-29-84  ---    COMPLETE l       Listing, FNP-1 (T.S. Table 3.7-4)
COMPLETE 02-29-84 05-27-83 7.
: 8. 10CFR50.49       ---      02-22-84         ---        04-16-84  ---    COMPLETE Environmental
Correct Snubber l
<        Qualification Schedule Extension Submi ttal ,
Listing, FNP-1 (T.S. Table 3.7-4)
COMPLETE 04-16-84 8.
10CFR50.49 02-22-84 Environmental Qualification Schedule Extension Submi ttal,
FNP-1 i
FNP-1 i


ATTAC MENT                             PAGE 2 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED     ACTUAL       REQUESTED       ACTUAL APCo       APCo             NRC         NRC       NRC SUBMITTAL     SUBMITTAL     APPROVAL       APPROVAL   TAC ITEM             DATE       DATE(S)         DATE           DATE       #  REMARKS 9 .- License Condi-   ---
ATTAC MENT PAGE 2 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
11-24-82       ---          05-17-84  ---
DATE DATE REMARKS 05-17-84 COMPLETE 9.- License Condi-11-24-82 tion 2.C(17) 06-29-83 Containment 03-23-84 Mini-Purge, FNP-2 (T.S.
COMPLETE tion 2.C(17)                 06-29-83 Containment                   03-23-84 Mini-Purge, FNP-2 (T.S.
3.6.1.7) 05-17-84 COMPLETE 11-24-82 10a. Mechanical Snubber Listiag, FNP-2 (T.S. Table 3.7-4B) 10b. Containment 11-24-82 05-17-84 CON'LETE Denetration Overcurrent Protection, FNP-2 (T.S.
3.6.1.7) 10a. Mechanical        ---        11-24-82       ---          05-17-84  ---    COMPLETE Snubber Listiag, FNP-2 (T.S. Table 3.7-4B) 10b. Containment       ---        11-24-82       ---          05-17-84   ---    CON'LETE Denetration Overcurrent Protection, FNP-2 (T.S.
Table 3.8-1) 06-06-84 COMPLETE
Table 3.8-1)
: 11. Movable Control 03-04-83 Rod Action 06-03-83 Statement, 07-28-83 FNP-1 and 2 10-10-83 (T.S. 3/4.1.3) 02-17-84 05-03-84 COMPLETE 06-07-84 12-30-82 12a. River Water System 06-20-83 Deletion, FNP-1 03-02-84 and 2 (T.S.
: 11. Movable Control     ---        03-04-83       ---          06-06-84  ---    COMPLETE Rod Action                   06-03-83 Statement,                   07-28-83 FNP-1 and 2                   10-10-83 (T.S. 3/4.1.3)               02-17-84 05-03-84 12a. River Water        ---        12-30-82       ---          06-07-84  ---    COMPLETE System                       06-20-83 Deletion, FNP-1               03-02-84 and 2 (T.S.                   03-27-84 3/4.7.5 and 3/4.7.6) 12b. Diesel            ---        08-03-82       ---          06-07-84  ---    COMPLETE Generator                     12-30-82 Overload Test,               06-03-83 FNP-1 and 2                   01-31-84 (T.S.                         03-02-84 4.8.1.1.2.c.5)               03-27-84
03-27-84 3/4.7.5 and 3/4.7.6) 06-07-84 COMPLETE 08-03-82 12b. Diesel Generator 12-30-82 Overload Test, 06-03-83 FNP-1 and 2 01-31-84 (T.S.
: 13. Charcoal Filter     ---        03-04-83       ---          06 22-84  ---    COMPLETE Surveillance.                 03-01-84 FNP-1 and 2 (T.S. 4.7.7, 4.7.8 and 4.9.14)
03-02-84 4.8.1.1.2.c.5) 03-27-84 COMPLETE 06 22-84
: 13. Charcoal Filter 03-04-83 Surveillance.
03-01-84 FNP-1 and 2 (T.S. 4.7.7, 4.7.8 and 4.9.14)


ATTACHMENT                                         PAE. 3 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED       ACTUAL             REQUESTED     ACTUAL APCo         APCo                   NRC       NRC         NRC SUBMITTAL SUBMITTAL               APPROVAL     APPROVAL     TAC ITEM           DATE         DATE(S)             DATE         DATE         i       REMARKS
ATTACHMENT PAE. 3 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
: 14. Reactor Head      ---      12-12-83                 ---
DATE DATE i
09-12-84     ---
REMARKS 12-12-83 09-12-84 COMPLETE
COMPLETE Vent and Other 0737 Items, G.L. 83-37, FNP-1 and 2 (Proposed T.S.
: 14. Reactor Head Vent and Other 0737 Items, G.L. 83-37, FNP-1 and 2 (Proposed T.S.
      -3/4.4.12 and                                                                                           ;
-3/4.4.12 and existing T.S.
existing T.S.
Tabl e 3.3-6,
Tabl e 3.3-6,
      .3.3-11 and 3/4.6.4) 15a. Change Monthly    ---      03-01-84                 ---      09-21-84     ---        COMPLETE Channel Calibration of Excore Neutron Detectors to Every 31 EFPD, FNP-1 and 2 (T.S. Table 4.3-1) 15b. Correct          ---      03-01-84                 ---      09-21-84      ---        COMPLETE Facility Organization Chart, FNP-1 and 2 (T.S.
.3.3-11 and 3/4.6.4) 03-01-84 09-21-84 COMPLETE 15a. Change Monthly Channel Calibration of Excore Neutron Detectors to Every 31 EFPD, FNP-1 and 2 (T.S. Table 4.3-1)
Figure 6.2-2) 15c. Correct Valve    ---      03-01-84                 ---      09-21-84     ---        COMPLETE Numbers Listed in T.S., FNP-1 and 2 (T.S.
COMPLETE 09-21-84 03-01-84 15b. Correct Facility Organization Chart, FNP-1 and 2 (T.S.
Figure 6.2-2)
COMPLETE 03-01-84 09-21-84 15c. Correct Valve Numbers Listed in T.S., FNP-1 and 2 (T.S.
Table 3.6-1)
Table 3.6-1)
: 16. Meteorological    ---      03-02-84                 ---      10-04-84      ---        COMPLETE Tower Instrument Surveillance, FNP-1 and 2 (T.S. Tables 3.3-8 and 4.3-5)
COMPLETE 10-04-84 03-02-84
: 16. Meteorological Tower Instrument Surveillance, FNP-1 and 2 (T.S. Tables 3.3-8 and 4.3-5)


ATTACIMENT                                                           PAGE 4 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED       ACTUAL                 REQUESTED             ACTUAL APCo       APCo                         NRC               NRC                   NRC SUBMITTAL     SUBMITTAL               APPROVAL             APPROVAL               TAC ITEM                 DATE       DATE(S)                   DATE               DATE                   #        REMARKS
ATTACIMENT PAGE 4 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
: 17. Schedul ar          ---        06-18-82                     ---
DATE DATE REMARKS 06-18-82 10-04-84
10-04-84                   ---      COMPLETE Exemption to                   07-27-82 Appendix R                   05-15-84 Al ternative                   08-06-84 Shutdown Requirement, FNP-1 and 2
: 17. Schedul ar COMPLETE Exemption to 07-27-82 Appendix R 05-15-84 Al ternative 08-06-84 Shutdown Requirement, FNP-1 and 2 04-10-84 10-15-84
: 18. RCS Pressure          ---      04-10-84                 ---
: 18. RCS Pressure COMPLETE Isolation Valve Surveillance, FNP-1 and 2 (T.S. 3/4.4.7.2 and 3/4.4.7.3) 08-17-84 10-17-84
10-15-84               ---
: 19. Administrative COMPLETE Change to Allow AFW Surveillance to be Performed During Operation, FNP 1 and 2 (T.S.
COMPLETE Isolation Valve Surveillance, FNP-1 and 2 (T.S. 3/4.4.7.2 and 3/4.4.7.3)
4.7.1.2.2.b.1) 01-13-84 10-23-84 COMPLETE 20.
: 19. Administrative        ---      08-17-84                   ---
Respirator Iodine Filter 02-10-84 Exemption 02-13-84 Request. FNP-1 03-05-84 and 2 05-08-84 54672 Critical 21.
10-17-84               ---
Increase Fuel 03-30-84 10-01-84 Enrichment 05-29-84 11-09-84 54673 outage Design Limit item for Reload Fuel and New Fuel Racks, FNP-1 and 2 (T.S.
COMPLETE Change to Allow AFW Surveillance to be Performed During Operation, FNP 1 and 2 (T.S.
5.3.1 and l
4.7.1.2.2.b.1)
5.6.1.2) l New item to 10-19-84 11-19-84 l 22. Pollution l
: 20. Respirator          ---      01-13-84                   ---                  10-23-84               ---
Control Bond support bond Issue issuance by
COMPLETE Iodine Filter                 02-10-84 Exemption                     02-13-84 Request. FNP-1               03-05-84 and 2                         05-08-84
[
: 21. Increase Fuel       ---      03-30-84                   10-01-84               ---                54672      Critical Enrichment                   05-29-84                   11-09-84                                   54673       outage Design Limit                                                                                                       item
Certificate 11-30-84 i
!      for Reload Fuel
\\
!      and New Fuel
!      Racks, FNP-1 and 2 (T.S.
!      5.3.1 and l       5.6.1.2) l l 22. Pollution              ---      10-19-84                 11-19-84               ---                ---          New item to l       Control Bond                                                                                                 support bond Issue                                                                                                       issuance by
[       Certificate                                                                                                 11-30-84 i
\
l
l


p ATTACl54ENT                                         PAGE 5 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED             ACTUAL             REQUESTED       ACTUAL APCo             APCo                     NRC       NRC     NRC SUBMITTAL             SUBMITTAL           APPROVAL       APPROVAL     TAC ITEM                 DATE               DATE(S)             DATE           DATE         #            REMMtKS
p ATTACl54ENT PAGE 5 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
: 23. Administrative             ---                05-14-84           11-24-84         ---
DATE DATE REMMtKS
55029 Change to                                                                             55030 Reflect Senior Vice President Change, FNP-1 and 2 (T.S.
: 23. Administrative 05-14-84 11-24-84 55029 Change to 55030 Reflect Senior Vice President Change, FNP-1 and 2 (T.S.
6.1, 6.2, 6.5, 6.6, 6.7 and Figure 6.2.1)
6.1, 6.2, 6.5, 6.6, 6.7 and Figure 6.2.1)
: 24. RWST and                   ---                06-01-84           11-30-84         ---
: 24. RWST and 06-01-84 11-30-84 55169 Critical Accumulator IST 55170 outage J u sti fication, item FNP-1 and 2 (IST Program)
55169             Critical Accumulator IST                                                                       55170             outage J u sti fication,                                                                                         item FNP-1 and 2 (IST Program)
: 25. Administrative 06-25-84 12-01-84 55412 Change to 09-24-84 55413 Reflect 2 Assistant Plant Managers, FNP-1 and 2 (T.S.
: 25. Administrative           ---                06-25-84           12-01-84         ---    55412 Change to                               09-24-84                                     55413 Reflect 2 Assistant Plant Managers, FNP-1 and 2 (T.S.
Figure 6.2-2)
Figure 6.2-2)
: 26. Administrative           ---
: 26. Administrative 11-02-84 12-31-84 New item to
11-02-84           12-31-84         ---    -~~
-~~
New item to Change for                                                                                               support Operator Shift                                                                                           revised Fl exibility,                                                                                           operations FNP-1 and 2                                                                                             staff (T.S. 6.2.2. f)                                                                                         scheduled to commence 01-07-85
Change for support Operator Shift revised Fl exibility, operations FNP-1 and 2 staff (T.S. 6.2.2. f) scheduled to commence 01-07-85
:27. ISI Program             ---                07-27-84           11-30-84         ---
:27. ISI Program 07-27-84 11-30-84 55496 Critical ASME XI 12-31-84 outage Request, FNP-2 item
55496             Critical ASME XI                                                     12-31-84                                   outage Request, FNP-2                                                                                           item
: 28. Revised Heatup 04-20-84 03-01-85 54894
: 28. Revised Heatup           ---                04-20-84           03-01-85         ---      54894
' and Cooldown (FNP-1)
      ' and Cooldown                               (FNP-1)             (FNP-1)
(FNP-1)
Curves Based on Reactor Vessel Material             ---                02-10-84           01-04-85         ---      54234           Critical Surveillance                             06-18-84           (FNP-2)                                     outage item Program, FNP-1                           (FNP-2)                                                         for Unit 2 and 2
Curves Based on Reactor Vessel Material 02-10-84 01-04-85 54234 Critical Surveillance 06-18-84 (FNP-2) outage item Program, FNP-1 (FNP-2) for Unit 2 and 2


ATTACMENT PAGE 6
~
~
ATTACMENT                            PAGE 6 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED   ACTUAL         REQUESTED     ACTUAL APCo     APCo               NRC       NRC   MC StBMITTAL   SUBMITTAL       APPROVAL     APPROVAL TAC ITEM               DATE     DATE(S)           DATE     DATE     f     REMARKS
STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC MC StBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
: 29. Administrative       ---
DATE DATE f
07-06-84       01-07-85       ---
REMARKS
55409 Change to                                                         55410 Remove Snubber Tables and Other Minor Changes, FNP-1 and 2 (T.S.
: 29. Administrative 07-06-84 01-07-85 55409 Change to 55410 Remove Snubber Tables and Other Minor Changes, FNP-1 and 2 (T.S.
Tables 3.7-4a and b)
Tables 3.7-4a and b)
: 30. Safety Related     ---
: 30. Safety Related 05-03-83 11-03-83 51629 8attery 06-29-83 05-01-84 51631 Surveillance, 07-29-83 06-01-84 FNP-1 and 2 08-26-83 08-15-84 (T.S.3/4.8.2.3, 09-23-83 09-06-84 3/4.8.2.4 and 01-27-84 10-06-84 3/4.8.2.5) 09-06-84 12-07-84 01-11-85
05-03-83       11-03-83       ---
: 31. Generic Letter 02-03-84 09-01-84 54235 APCo 83-43, 09-14-84 10-25-84 54236 responding Reporting 11-05-84 to verbal Requirements of 01-21-85 NRC 50.73, FNP-1 questions and 2 (T.S.
51629 8attery                     06-29-83       05-01-84             51631 Surveillance,               07-29-83       06-01-84 FNP-1 and 2                 08-26-83       08-15-84 (T.S.3/4.8.2.3,             09-23-83       09-06-84 3/4.8.2.4 and               01-27-84       10-06-84 3/4.8.2.5)                 09-06-84       12-07-84 01-11-85
6.9.1.11,12,13) 32.
: 31. Generic Letter       ---
ISI Program 08-16-84 03-01-85 Critical ASME XI outage Code Relief item Request, FNP-1
02-03-84       09-01-84       ---
: 33. Technical 30 days To be Specification after deter-Optimization NRC mined Program, FNP-1 approval and 2 (T.S.
54235   APCo 83-43,                     09-14-84       10-25-84             54236   responding Reporting                                   11-05-84                       to verbal Requirements of                             01-21-85                       NRC 50.73, FNP-1                                                               questions and 2 (T.S.
of 3/4.3) generic changes 34.
6.9.1.11,12,13)
Special Test Placed on Exception to hold by Eliminate APCo.
: 32. ISI Program       ---
08-16-84       03-01-85       ---      ---
Critical ASME XI                                                                 outage Code Relief                                                             item Request, FNP-1
: 33. Technical         30 days       ---
To be         ---      ---
Specification   after                       deter-Optimization   NRC                         mined Program, FNP-1 approval and 2 (T.S. of 3/4.3)         generic changes
: 34. Special Test       ---        ---            ---          ---      ---
Placed on Exception to                                                             hold by Eliminate                                                               APCo.
Excessive Flux Mapping During Startup After R.0., FNP-1 and 2 (T.S.
Excessive Flux Mapping During Startup After R.0., FNP-1 and 2 (T.S.
3/4.10.2)
3/4.10.2)


r                                                                                                                 --
r 1
1 l
ATTACIMENT PAGE 7 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL t
ATTACIMENT                                                       l
PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
      ,                                                                                                                            PAGE 7 STATUS OF LICENSING ITEMS REQUIRING                                                     l NRC APPROVAL t
_ DATE DATE i
                                                                                                                                            )
REMARKS
PROPOSED                     ACTUAL             REQUESTED                     ACTUAL APCo                         APCo               NRC                       NRC     NRC SUBMITTAL                 SUBMITTAL             APPROVAL                   APPROVAL   TAC ITEM                   DATE                         DATE(S)       _ DATE                         DATE     i     REMARKS
: 35. Chlorine Placed on Detection hold by Systems, FNP-1 APC9.
: 35. Chlorine               ---                            ---              ---                          ---      ---    Placed on Detection                                                                                                             hold by Systems, FNP-1                                                                                                       APC9.
and 2 (T.S.
and 2 (T.S.
3.3.3.6)
3.3.3.6)
: 36. RCP Breaker           ---                              ---                ---                        ---      ---
Placed on
Placed on Position Trip                                                                                                         hold by Deletion, FNP-1                                                                                                       APCo.
: 36. RCP Breaker Position Trip hold by Deletion, FNP-1 APCo.
and 2 (T.S.
and 2 (T.S.
Table 3.3-1) l . CJS:bdh-016 l
Table 3.3-1) l. CJS:bdh-016 l
            .        .  ...        , _ . . _ . - . _ . - - - . - , . . .              - , - . - . - - - - -              -. . . - -.}}
.. - -.}}

Latest revision as of 02:43, 13 December 2024

Forwards Updated Status of 1984 Licensing Items Identified in .Approval of Item 28 Re Deletion of Requirement to Remove Reactor Vessel Capsule Crucial Prior to Scheduled Startup.Decision on Item Needed by 850104
ML20107M150
Person / Time
Site: Farley  
Issue date: 11/06/1984
From: Mcdonald R
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
TAC-53266, TAC-54234, NUDOCS 8411140044
Download: ML20107M150 (9)


Text

_.

Mailing Address -

' Alabzmn Powsr Company -

600 North 18th Strest -

'I;

- Post Office Box 2641 Birmingham, Alabama 35291

Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Building AlabamaPower t"e sou:%m escr c s, s:em November 6,1984

-Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant (FNP) - Units 1 and 2 Licensing Items Requiring NRC Approval Gentlemen:

Attached for your information is an updated status of 1984 licensing items identified in Alabama Power Company's letter dated Oc tober 10, 1984. This attachment is tabulated chronologically by Alabama Power Company's requested NRC approval date. Alabar,1a Power Company is ready to discuss modifications to this status to address all licensing issues.

Alabama Power Company acknowledges and appreciates the recent NRC efforts to' complete licensing action on items 16,17,18,19, and 20 of the attached list. There remains, however, 4 items which are.still required to support the upcoming Unit 2 refueling outage which is-scheduled to-start January 4,1985. Specifically, item 28 of the attachment, Revised Heatup and Cooldown Curves, requests deletion of the requirement to remove a reactor vessel capsule during the next Unit 2 refueling outage. As a result of. higher than anticipated fuel burnup resulting in an earlier planned start of the refueling outage and finalization'of ongoing detailed outage planning, the critical date for-a decision on removal of the reactor vessel capsule has been advanced to

' January 4,1985. Without an NRC decision by that date Alabama Power Company will be required to either unnecessarily remove a reactor vessel

-capsule or place itself in jeopardy of extending the outage critical path if approval by NRC is not obtained prior to scheduled startup.

0 g411140044 841106 0,

PDR ADOCK 05000348 PDR l

i g

p L

1

, _ - _.,.. _. _ _ _ _. _.,. _ _ _. ~.. _. _

Mr. S. A. Varga November 6, 1984 U. S. Nuclear Regulatory Comaission Page 2

' Two new items have been added to the attached list. These items arc a request for a Pollution Control Bond Issue Certificate (item 22) and an Administrative change to provide greater working hour flexibility for the operating staff (item 26). NRC staff action is requested in accordance with the attached list for these two new items.

It is Alabama Power Company's understanding that the attached Licensing Items list agrees with the current NRC schedule. The attached schedule is considered acceptable to Alabama Power Company.

If you have any questions, please advise.

o Yours truly, hs L

R. P. Mcdonald RPM /CJS:bdh-D16 Attachment cc: Mr. L. B. Long Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford

ATTACIMENT PAGE 1 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)

DATE DATE REMARKS 01-06-84 COMPLETE 10-25-82 1.

Emergency Preparedness Program Audit Once Per 12 Months, FNP-1 and 2 2.

Administrative 04-06-83 01-09-84 COMPLETE Change to Footnote to T.S. Tabl e 3.3-3, FNP-1 and 2 01-10-84 COMPLETE 12-10-82

.3.

Administrative Change to T.S.

Table 3.7-4a, FNP-2 01-27-84 COMPLETE 10-08-82 4.

Change for Turbine Valve Testing, FNP-1 and 2 5.

Correct Fire 08-26-83 02-09-84 COMPLETE Protection Technical Specifications, FNP-1 and 2 02-29-84 COMPLETE 05-27-84 6.

Administrative Change to Table 3.7-4a, FNP-1 1

COMPLETE 02-29-84 05-27-83 7.

Correct Snubber l

Listing, FNP-1 (T.S. Table 3.7-4)

COMPLETE 04-16-84 8.

10CFR50.49 02-22-84 Environmental Qualification Schedule Extension Submi ttal,

FNP-1 i

ATTAC MENT PAGE 2 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)

DATE DATE REMARKS 05-17-84 COMPLETE 9.- License Condi-11-24-82 tion 2.C(17) 06-29-83 Containment 03-23-84 Mini-Purge, FNP-2 (T.S.

3.6.1.7) 05-17-84 COMPLETE 11-24-82 10a. Mechanical Snubber Listiag, FNP-2 (T.S. Table 3.7-4B) 10b. Containment 11-24-82 05-17-84 CON'LETE Denetration Overcurrent Protection, FNP-2 (T.S.

Table 3.8-1) 06-06-84 COMPLETE

11. Movable Control 03-04-83 Rod Action 06-03-83 Statement, 07-28-83 FNP-1 and 2 10-10-83 (T.S. 3/4.1.3) 02-17-84 05-03-84 COMPLETE 06-07-84 12-30-82 12a. River Water System 06-20-83 Deletion, FNP-1 03-02-84 and 2 (T.S.

03-27-84 3/4.7.5 and 3/4.7.6) 06-07-84 COMPLETE 08-03-82 12b. Diesel Generator 12-30-82 Overload Test, 06-03-83 FNP-1 and 2 01-31-84 (T.S.

03-02-84 4.8.1.1.2.c.5) 03-27-84 COMPLETE 06 22-84

13. Charcoal Filter 03-04-83 Surveillance.

03-01-84 FNP-1 and 2 (T.S. 4.7.7, 4.7.8 and 4.9.14)

ATTACHMENT PAE. 3 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)

DATE DATE i

REMARKS 12-12-83 09-12-84 COMPLETE

14. Reactor Head Vent and Other 0737 Items, G.L. 83-37, FNP-1 and 2 (Proposed T.S.

-3/4.4.12 and existing T.S.

Tabl e 3.3-6,

.3.3-11 and 3/4.6.4) 03-01-84 09-21-84 COMPLETE 15a. Change Monthly Channel Calibration of Excore Neutron Detectors to Every 31 EFPD, FNP-1 and 2 (T.S. Table 4.3-1)

COMPLETE 09-21-84 03-01-84 15b. Correct Facility Organization Chart, FNP-1 and 2 (T.S.

Figure 6.2-2)

COMPLETE 03-01-84 09-21-84 15c. Correct Valve Numbers Listed in T.S., FNP-1 and 2 (T.S.

Table 3.6-1)

COMPLETE 10-04-84 03-02-84

16. Meteorological Tower Instrument Surveillance, FNP-1 and 2 (T.S. Tables 3.3-8 and 4.3-5)

ATTACIMENT PAGE 4 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)

DATE DATE REMARKS 06-18-82 10-04-84

17. Schedul ar COMPLETE Exemption to 07-27-82 Appendix R 05-15-84 Al ternative 08-06-84 Shutdown Requirement, FNP-1 and 2 04-10-84 10-15-84
18. RCS Pressure COMPLETE Isolation Valve Surveillance, FNP-1 and 2 (T.S. 3/4.4.7.2 and 3/4.4.7.3) 08-17-84 10-17-84
19. Administrative COMPLETE Change to Allow AFW Surveillance to be Performed During Operation, FNP 1 and 2 (T.S.

4.7.1.2.2.b.1) 01-13-84 10-23-84 COMPLETE 20.

Respirator Iodine Filter 02-10-84 Exemption 02-13-84 Request. FNP-1 03-05-84 and 2 05-08-84 54672 Critical 21.

Increase Fuel 03-30-84 10-01-84 Enrichment 05-29-84 11-09-84 54673 outage Design Limit item for Reload Fuel and New Fuel Racks, FNP-1 and 2 (T.S.

5.3.1 and l

5.6.1.2) l New item to 10-19-84 11-19-84 l 22. Pollution l

Control Bond support bond Issue issuance by

[

Certificate 11-30-84 i

\\

l

p ATTACl54ENT PAGE 5 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)

DATE DATE REMMtKS

23. Administrative 05-14-84 11-24-84 55029 Change to 55030 Reflect Senior Vice President Change, FNP-1 and 2 (T.S.

6.1, 6.2, 6.5, 6.6, 6.7 and Figure 6.2.1)

24. RWST and 06-01-84 11-30-84 55169 Critical Accumulator IST 55170 outage J u sti fication, item FNP-1 and 2 (IST Program)
25. Administrative 06-25-84 12-01-84 55412 Change to 09-24-84 55413 Reflect 2 Assistant Plant Managers, FNP-1 and 2 (T.S.

Figure 6.2-2)

26. Administrative 11-02-84 12-31-84 New item to

-~~

Change for support Operator Shift revised Fl exibility, operations FNP-1 and 2 staff (T.S. 6.2.2. f) scheduled to commence 01-07-85

27. ISI Program 07-27-84 11-30-84 55496 Critical ASME XI 12-31-84 outage Request, FNP-2 item
28. Revised Heatup 04-20-84 03-01-85 54894

' and Cooldown (FNP-1)

(FNP-1)

Curves Based on Reactor Vessel Material 02-10-84 01-04-85 54234 Critical Surveillance 06-18-84 (FNP-2) outage item Program, FNP-1 (FNP-2) for Unit 2 and 2

ATTACMENT PAGE 6

~

STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC MC StBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)

DATE DATE f

REMARKS

29. Administrative 07-06-84 01-07-85 55409 Change to 55410 Remove Snubber Tables and Other Minor Changes, FNP-1 and 2 (T.S.

Tables 3.7-4a and b)

30. Safety Related 05-03-83 11-03-83 51629 8attery 06-29-83 05-01-84 51631 Surveillance, 07-29-83 06-01-84 FNP-1 and 2 08-26-83 08-15-84 (T.S.3/4.8.2.3, 09-23-83 09-06-84 3/4.8.2.4 and 01-27-84 10-06-84 3/4.8.2.5) 09-06-84 12-07-84 01-11-85
31. Generic Letter 02-03-84 09-01-84 54235 APCo 83-43, 09-14-84 10-25-84 54236 responding Reporting 11-05-84 to verbal Requirements of 01-21-85 NRC 50.73, FNP-1 questions and 2 (T.S.

6.9.1.11,12,13) 32.

ISI Program 08-16-84 03-01-85 Critical ASME XI outage Code Relief item Request, FNP-1

33. Technical 30 days To be Specification after deter-Optimization NRC mined Program, FNP-1 approval and 2 (T.S.

of 3/4.3) generic changes 34.

Special Test Placed on Exception to hold by Eliminate APCo.

Excessive Flux Mapping During Startup After R.0., FNP-1 and 2 (T.S.

3/4.10.2)

r 1

ATTACIMENT PAGE 7 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL t

PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)

_ DATE DATE i

REMARKS

35. Chlorine Placed on Detection hold by Systems, FNP-1 APC9.

and 2 (T.S.

3.3.3.6)

Placed on

36. RCP Breaker Position Trip hold by Deletion, FNP-1 APCo.

and 2 (T.S.

Table 3.3-1) l. CJS:bdh-016 l

.. - -.