{{#Wiki_filter:r Arizona Nuclear Power Project P.o. box 52024 e PHOENIX, ARIZONA 85072-2034 U.S. Nuclear Regulatory Commission                                       April 12,1985 Document Control Desk                                                     ANPP-32382-EEVB/GEC Washington, D.C. 20555
{{#Wiki_filter:r Arizona Nuclear Power Project P.o. box 52024 e PHOENIX, ARIZONA 85072-2034 U.S. Nuclear Regulatory Commission April 12,1985 Document Control Desk ANPP-32382-EEVB/GEC Washington, D.C.
20555


==Subject:==
==Subject:==
Line 23: Line 24:


==Dear Sirs:==
==Dear Sirs:==
The NRC Operations Center was notified at approximately 11:00 MST on February 15, 1985, via the Emergency Notification System, of a potentially reportable occurrence regarding a failure of a diesel generator to start due to a suspected design deficiency potentially affecting both diesels.
The NRC Operations Center was notified at approximately 11:00 MST on February 15, 1985, via the Emergency Notification System, of a potentially reportable occurrence regarding a failure of a diesel generator to start due to a suspected design deficiency potentially affecting both diesels.
As a result of further investigation and evaluation of the occurrence, we have determined that the event was not reportable within the requirements of either 10CFR 50.72 or 10CFR 50.73. Failure of the diesel generator to start was found to be a result of damaged fiber optics cables affecting only one diesel generator rather than the suspected design deficiency.
As a result of further investigation and evaluation of the occurrence, we have determined that the event was not reportable within the requirements of either 10CFR 50.72 or 10CFR 50.73.
Failure of the diesel generator to start was found to be a result of damaged fiber optics cables affecting only one diesel generator rather than the suspected design deficiency.
If you have any questions or concerns, please contact me.
If you have any questions or concerns, please contact me.
Very truly yours b . GAC hat                 -
Very truly yours b. GAC hat U
U E.E. Van Brunt, Jr.
E.E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/GEC/das cc:   J.B. Martin R.P. Zimmerman E.A. Licitra A.C. Gehr 8504190595 850412 PDR   ADOCK 05000528 S                 PDR.
Executive Vice President Project Director EEVB/GEC/das cc:
J.B. Martin R.P. Zimmerman E.A. Licitra A.C. Gehr 8504190595 850412 PDR ADOCK 05000528 S
PDR.
U
U
                                                                                                  #$}}
# $}}

Latest revision as of 23:19, 12 December 2024

Ro:On 850215,diesel Generator Failed to Start.Initially Suspected to Be Design Defect Affecting Both Diesels.Caused by Damaged Fiber Optics Cable Affecting Only One Diesel Generator.Event Not Reportable
ML20115F618
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/12/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
ANPP-32382-EEVB, NUDOCS 8504190595
Download: ML20115F618 (1)


Text

r Arizona Nuclear Power Project P.o. box 52024 e PHOENIX, ARIZONA 85072-2034 U.S. Nuclear Regulatory Commission April 12,1985 Document Control Desk ANPP-32382-EEVB/GEC Washington, D.C.

20555

Subject:

Palo Verde Nucl_ ear Generating Station (PVNGS)

Unit 1 Docket No. STN 50-528; License No. NPF-34 10 CFR 50.72 Potentially Reportable Item File: 85-056-026; G.1.01.10

Dear Sirs:

The NRC Operations Center was notified at approximately 11:00 MST on February 15, 1985, via the Emergency Notification System, of a potentially reportable occurrence regarding a failure of a diesel generator to start due to a suspected design deficiency potentially affecting both diesels.

As a result of further investigation and evaluation of the occurrence, we have determined that the event was not reportable within the requirements of either 10CFR 50.72 or 10CFR 50.73.

Failure of the diesel generator to start was found to be a result of damaged fiber optics cables affecting only one diesel generator rather than the suspected design deficiency.

If you have any questions or concerns, please contact me.

Very truly yours b. GAC hat U

E.E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/GEC/das cc:

J.B. Martin R.P. Zimmerman E.A. Licitra A.C. Gehr 8504190595 850412 PDR ADOCK 05000528 S