Line 16: Line 16:
| event date = 02/26/2004 01:05 EST
| event date = 02/26/2004 01:05 EST
| last update date = 02/26/2004
| last update date = 02/26/2004
| title = Control Power Fuse Failure In Hpci System
| title = Control Power Fuse Failure in Hpci System
| event text = The High Pressure Coolant Injection (HPCI) system had been removed from service to perform planned maintenance and testing.  During post-maintenance testing, the HPCI gland seal condensate pump tripped due to a blown control power fuse.  The maintenance scope did not include the pump or its power supply.  The fuse was replaced and the surveillance completed satisfactorily.  Investigation into the cause of the failure is ongoing.  HPCI remains inoperable in support of additional pre-planned testing.
| event text = The High Pressure Coolant Injection (HPCI) system had been removed from service to perform planned maintenance and testing.  During post-maintenance testing, the HPCI gland seal condensate pump tripped due to a blown control power fuse.  The maintenance scope did not include the pump or its power supply.  The fuse was replaced and the surveillance completed satisfactorily.  Investigation into the cause of the failure is ongoing.  HPCI remains inoperable in support of additional pre-planned testing.
The licensee notified the State and the NRC Resident Inspector.
The licensee notified the State and the NRC Resident Inspector.

Latest revision as of 21:24, 1 March 2018

ENS 40547 +/-
Where
Pilgrim
Massachusetts (NRC Region 1)
Reporting
10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor
Time - Person (Reporting Time:+2.55 h0.106 days <br />0.0152 weeks <br />0.00349 months <br />)
Opened: Brian Louis
08:38 Feb 26, 2004
NRC Officer: Arlon Costa
Last Updated: Feb 26, 2004