ENS 41132: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 08/22/2004 04:50 EDT
| event date = 08/22/2004 04:50 EDT
| last update date = 10/19/2004
| last update date = 10/19/2004
| title = 60 Day Report - Invalid Actuation Of Specified System
| title = 60 Day Report - Invalid Actuation of Specified System
| event text = This 60-day optional report as allowed by 10 CFR 50.73(a)(1), is being made under the reporting requirement in 10 CFR 50.73(a)(2)(iv)(A) to describe an invalid actuation of a specified system, specifically the Nuclear Service Water System (NSWS).
| event text = This 60-day optional report as allowed by 10 CFR 50.73(a)(1), is being made under the reporting requirement in 10 CFR 50.73(a)(2)(iv)(A) to describe an invalid actuation of a specified system, specifically the Nuclear Service Water System (NSWS).
During TSM 158 work associated with W/O 98686671 a SPOC Relief Supervisor inadvertently caused a ground when disconnecting test meter leads from an energized circuit.  This ground resulted in an unplanned RN [Nuclear Service Water] swap to the SNSWP [Standby Nuclear Service Water System].
During TSM 158 work associated with W/O 98686671 a SPOC Relief Supervisor inadvertently caused a ground when disconnecting test meter leads from an energized circuit.  This ground resulted in an unplanned RN [Nuclear Service Water] swap to the SNSWP [Standby Nuclear Service Water System].

Latest revision as of 21:22, 1 March 2018

ENS 41132 +/-
Where
Catawba Duke Energy icon.png
South Carolina (NRC Region 2)
Reporting
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation
Time - Person (Reporting Time:+1392 h58 days <br />8.286 weeks <br />1.907 months <br />)
Opened: Wallace Judd
08:50 Oct 19, 2004
NRC Officer: Bill Gott
Last Updated: Oct 19, 2004
41132 - NRC Website
Loading map...