ML20117M783: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:.. | {{#Wiki_filter:.. | ||
t CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POWER PLAITT May 1, 1996 - May 31, 1996 MONTHLY OPERATING REPORT TO NRC DOCKET NUMBER: | = | ||
t CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POWER PLAITT May 1, 1996 - May 31, 1996 MONTHLY OPERATING REPORT TO NRC DOCKET NUMBER: | |||
50-440 LICENSE NUMBER: | |||
NPF-58 f | |||
I i | I i | ||
i 1 | i 1 | ||
4 9606190031 960614 | |||
9606190031 960614 | |||
{DR ADOCK 05000440 PDR | {DR ADOCK 05000440 PDR | ||
f 4 | f 4 | ||
Table of Contents Average Daily Unit Power Level . | Table of Contents Average Daily Unit Power Level. | ||
1 2 | |||
n | Operating Data Report Unit Shutdowns and Power Reductions 3 | ||
6 6 | |||
I n | |||
4 4 | 4 4 | ||
4 | |||
i i | i i | ||
l | l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-440 UNIT Perry One DATE 6/14/96 CONTACT G.M.Neuman TELEPHONE (2161280-5815 MONTE MAY 1996 DAX AVERAGE DAILY POWER LEVEL DAX AVERAGE DAILY POWER LEVEL iMWe-Neti IMHP-Net) 1 1162 17 12.58 2 | ||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-440 UNIT | 1162 18 1144 3 | ||
1159 19 1141 4 | |||
1162 20 1139 5 | |||
1163 21 1157 6 | |||
1164 22 1159 7 | |||
1166 23 1158 8 | |||
1164 24 1165 9 | |||
1162 25 1167 10 1154 26 1165 s | |||
11 279 27 1166 12 695 28 1165 13 1112 29 1167 14 1170 30 288 15 1165 31 0 | |||
16 1165 k | |||
e OPERATING DATA REPOSI UNIT: | |||
OPERATING DATA REPOSI UNIT: | Perry One DATE: | ||
6/14/96 QERRATING STATUS 1. | |||
Docket: | |||
_50-440 2. | |||
Reporting Periods MAY 1996 3. | |||
Utility contacts | |||
__G.M.Neuman 4. | |||
Licensed Thermal Power (MWt): | |||
__3579 5. | |||
Nameplate Rating (Gross MWe): | |||
None | __1250 6. | ||
Design Electrical Rating (Net MWe): _1191 7. | |||
Maximum Dependable Capacity (Gross MWe): _1225 8. | |||
Maximum Dependable Capacity (Net MWe): | |||
1166 9. | |||
If Changes Occur in Capacity Ratings (Item Numbers 4 through 8) Since Last Report, Give Reasons: | |||
None 10. | |||
Power Level to Which Restricted, if any (Net MWe): | |||
100% | |||
11. | |||
Reasons for Restrictions, if anys_ Operating License This Month Yr-to-Date cumulative 12. | |||
Hours In Reporting Period 744.0 | |||
_3,647.0 74,819.0 13. | |||
Hours Reactor was Critical 702.3 | |||
_1,881.1 52,189.5 14. | |||
Reactor Reserve Shutdown Hours 0.0 0.0 0.0 15. | |||
Hours Generator On-Line 692.3 | |||
None | _1,796.1 50,260.0 4 | ||
16. | |||
Unit Reserve Shutdown Hours 0.0 0. 0__ __ | |||
0.0 17. | |||
Gross Thermal Energy (MWH) | |||
_2,418,329_ | |||
_5,731,225__ | |||
__170,808,316 18. | |||
Gross Electrical Energy (MWH) 818,199_ | |||
_1,924,273__ | |||
58,530,344 19. | |||
Net Electrical Energy (MWH) 780,607_ | |||
_1,826,290__ | |||
55,622,937 20. | |||
Unit Service Factor 93.1%__ | |||
49.2% | |||
67.2% | |||
21. | |||
Unit Availability Factor 93.1%__ | |||
49.2% | |||
67.2% | |||
22. | |||
Unit capacity Factor (using MDC Net) 90.0%__ | |||
42.9% | |||
64.3% | |||
23. | |||
Unit Capacity Factor (Using DER Net) 88.1%__ | |||
42.0% | |||
62.4% | |||
24. | |||
Unit Forced Outage Rate 6.9%__ | |||
3.4% | |||
10.4% | |||
25. | |||
Forced Outage Hours 51.7__ | |||
63.9 5,843.0 26. | |||
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | |||
None 27. | |||
If Shutdown at end of Report Period, Estimated Date of Startup: | |||
JUNE 15, 1996}} | JUNE 15, 1996}} | ||
Latest revision as of 21:31, 12 December 2024
| ML20117M783 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 05/31/1996 |
| From: | Neuman G CENTERIOR ENERGY |
| To: | |
| Shared Package | |
| ML20117M703 | List: |
| References | |
| NUDOCS 9606190031 | |
| Download: ML20117M783 (4) | |
Text
..
=
t CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POWER PLAITT May 1, 1996 - May 31, 1996 MONTHLY OPERATING REPORT TO NRC DOCKET NUMBER:
50-440 LICENSE NUMBER:
NPF-58 f
I i
i 1
4 9606190031 960614
{DR ADOCK 05000440 PDR
f 4
Table of Contents Average Daily Unit Power Level.
1 2
Operating Data Report Unit Shutdowns and Power Reductions 3
6 6
I n
4 4
4
i i
l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-440 UNIT Perry One DATE 6/14/96 CONTACT G.M.Neuman TELEPHONE (2161280-5815 MONTE MAY 1996 DAX AVERAGE DAILY POWER LEVEL DAX AVERAGE DAILY POWER LEVEL iMWe-Neti IMHP-Net) 1 1162 17 12.58 2
1162 18 1144 3
1159 19 1141 4
1162 20 1139 5
1163 21 1157 6
1164 22 1159 7
1166 23 1158 8
1164 24 1165 9
1162 25 1167 10 1154 26 1165 s
11 279 27 1166 12 695 28 1165 13 1112 29 1167 14 1170 30 288 15 1165 31 0
16 1165 k
e OPERATING DATA REPOSI UNIT:
Perry One DATE:
6/14/96 QERRATING STATUS 1.
Docket:
_50-440 2.
Reporting Periods MAY 1996 3.
Utility contacts
__G.M.Neuman 4.
Licensed Thermal Power (MWt):
__3579 5.
Nameplate Rating (Gross MWe):
__1250 6.
Design Electrical Rating (Net MWe): _1191 7.
Maximum Dependable Capacity (Gross MWe): _1225 8.
Maximum Dependable Capacity (Net MWe):
1166 9.
If Changes Occur in Capacity Ratings (Item Numbers 4 through 8) Since Last Report, Give Reasons:
None 10.
Power Level to Which Restricted, if any (Net MWe):
100%
11.
Reasons for Restrictions, if anys_ Operating License This Month Yr-to-Date cumulative 12.
Hours In Reporting Period 744.0
_3,647.0 74,819.0 13.
Hours Reactor was Critical 702.3
_1,881.1 52,189.5 14.
Reactor Reserve Shutdown Hours 0.0 0.0 0.0 15.
Hours Generator On-Line 692.3
_1,796.1 50,260.0 4
16.
Unit Reserve Shutdown Hours 0.0 0. 0__ __
0.0 17.
Gross Thermal Energy (MWH)
_2,418,329_
_5,731,225__
__170,808,316 18.
Gross Electrical Energy (MWH) 818,199_
_1,924,273__
58,530,344 19.
Net Electrical Energy (MWH) 780,607_
_1,826,290__
55,622,937 20.
Unit Service Factor 93.1%__
49.2%
67.2%
21.
Unit Availability Factor 93.1%__
49.2%
67.2%
22.
Unit capacity Factor (using MDC Net) 90.0%__
42.9%
64.3%
23.
Unit Capacity Factor (Using DER Net) 88.1%__
42.0%
62.4%
24.
Unit Forced Outage Rate 6.9%__
3.4%
10.4%
25.
Forced Outage Hours 51.7__
63.9 5,843.0 26.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None 27.
If Shutdown at end of Report Period, Estimated Date of Startup:
JUNE 15, 1996