| event date = 02/07/2005 20:55 EST | | event date = 02/07/2005 20:55 EST | ||
| last update date = 02/08/2005 | | last update date = 02/08/2005 | ||
| title = Plant Had | | title = Plant Had a Freon Leak in the Drywell Chiller Room | ||
| event text = The plant reported that there was a freon leak in the Drywell Chiller Room located in the Unit 2 Reactor Building. Maintenance was being performed on the refrigeration equipment relief valve when the gas began to escape into the room. There were six men working in the room and two were affected by the freon gas. They were treated on site and released. Oxygen content in the room was 20.5% and LEL for hydrocarbons was alarming at 19%. The drywell chiller room is secured and being cleared of the 1,200 pounds of freon gas. At this time an investigation is being made to determine the cause which may have been due to the relief valve opening or the workers removing the valve. The plant entered the NOUE due to a "toxic gas release". The NOUE will be terminated when the room is habitable. | | event text = The plant reported that there was a freon leak in the Drywell Chiller Room located in the Unit 2 Reactor Building. Maintenance was being performed on the refrigeration equipment relief valve when the gas began to escape into the room. There were six men working in the room and two were affected by the freon gas. They were treated on site and released. Oxygen content in the room was 20.5% and LEL for hydrocarbons was alarming at 19%. The drywell chiller room is secured and being cleared of the 1,200 pounds of freon gas. At this time an investigation is being made to determine the cause which may have been due to the relief valve opening or the workers removing the valve. The plant entered the NOUE due to a "toxic gas release". The NOUE will be terminated when the room is habitable. | ||
The NRC Resident Inspector was notified along with State and Local agencies. | The NRC Resident Inspector was notified along with State and Local agencies. |
Latest revision as of 21:21, 1 March 2018
Where | |
---|---|
Hatch Georgia (NRC Region 2) | |
Reporting | |
Emergency class: | Unusual Event |
10 CFR 50.72(a) (1) (i), Emergency Class Declaration | |
Time - Person (Reporting Time:+-4.22 h-0.176 days <br />-0.0251 weeks <br />-0.00578 months <br />) | |
Opened: | Frank Gorley 21:42 Feb 7, 2005 |
NRC Officer: | Chauncey Gould |
Last Updated: | Feb 8, 2005 |