          - PeGe 1 of 4 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1                                                           ,
- PeGe 1 of 4 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT -
NRC MONTHLY OPERATING REPORT -
REV. 1 DOCKETNO:
REV. 1 DOCKETNO:                     M UNIT:                         CPSES1-DATE:                     December 8.1992 COMPLETED BYi .           Janet Hughes -
M UNIT:
TEl.EPHONE:                 8174074331 1
CPSES1-DATE:
OPERATING STATUS                                                                                                                       I
December 8.1992 COMPLETED BYi.
: 1. _ Reporting Period: OCTOBER 1992             Gross hours in reporting period:       25                                         i
Janet Hughes -
: 2.         Currently authorized power level (MWt):       3111 Max. depend. capacity (MWo. Net): 11 jig .
TEl.EPHONE:
* Design                     i Electrical Rating (MWe Net):       1 liq
8174074331 1
: 3.         Power level to which restricted (if any) (MWe-Net):         NEdf
OPERATING STATUS I
            .4           Romeons for restriction (if any):                                                                                             ;
1.
THISMONTH               YRTO DATE         COMUt.ATIVE
_ Reporting Period: OCTOBER 1992 Gross hours in reporting period:
: 5.       Number of hours reactor was critical                                     $17.2               0830.6             153544
25 i
: 6.       Reactorreserve shutdown hours 0                  24                m
2.
                                                                                                **'                ****                '5*2d         ;
Currently authorized power level (MWt):
: 7.       sours en.raioron in.
3111 Max. depend. capacity (MWo. Net): 11 jig.
0                   1 0-                   0-
* Design i
: 8.       Unit reserve shutdown hours
Electrical Rating (MWe Net):
: 9.      Gross thermal energy Generated (MWH)                                1.506M               21.N.4M             -47.H2.6         l 533.013-           -7.282.783           15.509,781-
1 liq 3.
: 10. Gross electrical energy generated (MWH)
Power level to which restricted (if any) (MWe-Net):
: 11.     Not electrical energy generated (MWH)                                 501.435           . a.sessed -         t4.a24,sas       :
NEdf
: 12. Reactor Service factor                                                         88 4               - 98 8               78 9         l
. 4 Romeons for restriction (if any):
: 13.     Reactor availability factor                                             - 89.4                 96.1               89.2 14       Unit service factor                                                       66.7                 93.3             _77.3
THISMONTH YRTO DATE COMUt.ATIVE 5.
: 15. Unt availabaity factor                                                         E7                 . 93.3 '             77.3'
Number of hours reactor was critical
: 16. Unli capacity factor (Using MDC)                                               58 5                 82.3               - m3 -
$17.2 0830.6 153544 0
: 17. _ Unit capadty factor (Using Design MWe)                                       56 5                82.3 -              e&3'
24 m
: 18. Unit forced outage rate                                                        8.2                   3.s                 7.9
6.
: 19. Shutdowns scheduled over next 6 months (Type, Dale, and Duration of each): -None
Reactorreserve shutdown hours
: 20. If shutoown at end of report period, cettmated date of startup: .12,1442 4-
'5*2d 7.
: 21.     Units in test status (prior to commerdal operation):               _ ACHIEVED Commercial Operation           900813
sours en.raioron in.
          ''        -Estimated                                                                                               OCTOBER =1992:
0 0-0-
8.
Unit reserve shutdown hours 1
1.506M 21.N.4M
-47.H2.6 9.
Gross thermal energy Generated (MWH) 533.013-
-7.282.783 15.509,781-
: 10. Gross electrical energy generated (MWH) 11.
Not electrical energy generated (MWH) 501.435
. a.sessed -
t4.a24,sas
: 12. Reactor Service factor 88 4
- 98 8 78 9 13.
Reactor availability factor
- 89.4 96.1 89.2 14 Unit service factor 66.7 93.3
_77.3
: 15. Unt availabaity factor E7
. 93.3 '
77.3' 58 5 82.3
- m3 -
: 16. Unli capacity factor (Using MDC) 56 5 82.3 -
e&3'
: 17. _ Unit capadty factor (Using Design MWe) 8.2 3.s 7.9
: 18. Unit forced outage rate 19.
Shutdowns scheduled over next 6 months (Type, Dale, and Duration of each): -None 20.
If shutoown at end of report period, cettmated date of startup:.12,1442 4-21.
Units in test status (prior to commerdal operation):
_ ACHIEVED Commercial Operation 900813
-Estimated OCTOBER =1992:
REVISION 1
REVISION 1
          - 9212210024-921215-PDR        'ADOCK 05000445 R                              PDR
- 9212210024-921215-R
  -      .-            . ~ . . . - . _ ..    - ..~.-                       ~;                                                             -
'ADOCK 05000445 PDR PDR
. ~... -.
-..~.-
~;


e i
e Atachmen't 2 to TXX 9307 Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL REY.1 DOCKET NO:
Atachmen't 2 to TXX 9307 Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL REY.1 DOCKET NO:           M UNIT:               CPSES1 DATE:           Decernber 8.1992 COMPLETED BY;     Janet Hughes TELEPHONE:         817m74331 MONTH: IMlIQBER 1992
M UNIT:
[MY             AVERAGE DAILY POWER LEVEL       DAY         AVEf%GE DAtLY POWER LEVEL (MWo. Net)                                   (MWo. Net) 1                     1098                                           1076 17 2                     1096                       18                   1092 3                     1096                                           1000 19 4                     1064                                           1094 20 5                     1W                       21                   1095 6                     1003                                           729 22                                  __
CPSES1 DATE:
7                    1000                                             3 23 8                     1064                     24                     0 9                     1086                     25                     0 10                   1102                     26                     0 11                   10GB                     27                     0 12                   542                       28                     0 13                     0                       29                     0 14                   427                       30                     0 15                   871                       31                     0 16                   1089 OCTOBER 1992 REVISION 1
Decernber 8.1992 COMPLETED BY; Janet Hughes TELEPHONE:
817m74331 MONTH: IMlIQBER 1992
[MY AVERAGE DAILY POWER LEVEL DAY AVEf%GE DAtLY POWER LEVEL (MWo. Net)
(MWo. Net) 1 1098 17 1076 2
1096 18 1092 3
1096 19 1000 4
1064 20 1094 5
1W 21 1095 6
1003 22 729 7
1000 23 3
8 1064 24 0
9 1086 25 0
10 1102 26 0
11 10GB 27 0
12 542 28 0
13 0
29 0
14 427 30 0
15 871 31 0
16 1089 OCTOBER 1992 REVISION 1


4 Attachment 2 to TXX.92007 Pe0'3#f4
4 Attachment 2 to TXX.92007 Pe0'3#f4


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH REV.1                 .
OF OPERATING EXPERIENCE FOR THE MONTH REV.1 g
g                      g
g
                                                                                    . UNIT:                   CPSES1 DATE:               Decenter 8 1992 -
. UNIT:
COMPLETED BY:         Janet Hu9he8 '
CPSES1 DATE:
TELEPHONE:             6174e74331     ,
Decenter 8 1992 -
MONTH: OCTORFR 1992 1041   0000   Unit started the month in MODE 1 with the reactor. operating at approxtrnately 100 percent of rated thermal power.
COMPLETED BY:
1W12   1214   The reactor was manually tripped when Stoam Generator No. 4 Feedwater Flow Control Valve f ailed closed. Unit entered MODE 3. LER 92-022 submitted.
Janet Hu9he8 '
1W13     1322   Unit entered MODE 2.
TELEPHONE:
1W13     2043   Unit entered MODE 1, 1W13     2107   Generator on-line.
6174e74331 MONTH: OCTORFR 1992 1041 0000 Unit started the month in MODE 1 with the reactor. operating at approxtrnately 100 percent of rated thermal power.
1W22     0832   Commenced power reduction for second refueling.
1W12 1214 The reactor was manually tripped when Stoam Generator No. 4 Feedwater Flow Control Valve f ailed closed. Unit entered MODE 3. LER 92-022 submitted.
1W23     0136   Trlpped Unit i Main Turbine.
1W13 1322 Unit entered MODE 2.
1 &23   0137   Urdt entered MODE 2.                                                                           ,
1W13 2043 Unit entered MODE 1, 1W13 2107 Generator on-line.
1023     1042   Unit entered MODE 3.
1W22 0832 Commenced power reduction for second refueling.
1W23     1420   Manuel reactor trip following dropped control rods while troubleshooting urgent failure alarm.
1W23 0136 Trlpped Unit i Main Turbine.
1 &23 0137 Urdt entered MODE 2.
1023 1042 Unit entered MODE 3.
1W23 1420 Manuel reactor trip following dropped control rods while troubleshooting urgent failure alarm.
LER 92 025 to be submitted.
LER 92 025 to be submitted.
1 &25   1943   Unit entered MODE 4.
1 &25 1943 Unit entered MODE 4.
1626-   2300   Unit entered MODE 5.=
1626-2300 Unit entered MODE 5.=
1031     2@     Unit ended the month in MODE 5.-
1031 2@
Unit ended the month in MODE 5.-
L t
L t
L OCTOBER.1992.
L OCTOBER.1992.
L                                                                                                   -REVISION 1.
L
1 l
-REVISION 1.
1
1


\                                                                                                                                         .  . .
\\
Attachment 2 to TXX S2T7 Page 4 of 4 UNIT SHUTDOWHS AND POWER REDUCTIONS                                                           .
! to TXX S2T7 Page 4 of 4 UNIT SHUTDOWHS AND POWER REDUCTIONS 50445 DOCKETto:
DOCKETto:                   50445 UMT:                       CPSES 1
CPSES 1 UMT:
!                                                                                                                  Decenter 8,1992 OATE-CO@tETEDBY;             Janet Hughes REPORT MONTH    O
OATE-Decenter 8,1992 CO@tETEDBY; Janet Hughes
_ CTOBER 1992
_ CTOBER 1992 O
                                                                        #ETHCDOF TWE                                     SHl1TTNG DOWN Ff0RTD         OLEATON                 TmmACTG10R SSCMD E FD                     EASON     fEDtf2GFCWER   CORRtCiWEACDONSCCASENTS NQ    M                          (HOLRS1 The reactor was nurnsasy inpped when Steam F            32.9          A              2                                                                  .
REPORT MONTH
1 10    1 &12 Genenmor No 4 Feedwater Flow Coritrol Valve               l farled cbsed, Urw entered MODE 3. LER 92-022 was smed 11/11/92.
#ETHCDOF TWE SHl1TTNG DOWN Ff0RTD OLEATON TmmACTG10R NQ M
20.8           D             4       Tectn' cal Specit:abon restrictbn to less than 50%
SSCMD E FD (HOLRS1 EASON fEDtf2GFCWER CORRtCiWEACDONSCCASENTS 10 1 &12 F
11    1W14            F RTP by axial flux cut of Irnits.
32.9 A
Refuehng outage. COiss-M power reduction C              1 12    1923            S            215.4 0632 22 October.
2 The reactor was nurnsasy inpped when Steam 1
Genenmor No 4 Feedwater Flow Coritrol Valve l
farled cbsed, Urw entered MODE 3. LER 92-022 was smed 11/11/92.
11 1W14 F
20.8 D
4 Tectn' cal Specit:abon restrictbn to less than 50%
RTP by axial flux cut of Irnits.
12 1923 S
215.4 C
1 Refuehng outage. COiss-M power reduction 0632 22 October.
OCTOBER 1992 l
OCTOBER 1992 l
REVISION 1 fEASCN
REVISION 1
: 2) hET100
: 2) hET100 1) fEASCN A ECUHAENTFALURE(EXPLAN)
: 1)                                                                                         1: MANUAL A ECUHAENTFALURE(EXPLAN)           E. OPERATOR TRAR&G NO UCe4SE EXAAWMTON F: ADMMSTRATNE                                   2: MANUALSCHAM B: MedTOR TEST                                                                      3: NJTCMATC SCRAM C fEFUEING                         G: OPERATONALEAROR(EXPUNN)
E. OPERATOR TRAR&G NO UCe4SE EXAAWMTON 1: MANUAL B: MedTOR TEST F: ADMMSTRATNE 2: MANUALSCHAM C fEFUEING G: OPERATONALEAROR(EXPUNN) 3: NJTCMATC SCRAM D fEGLAATORYFt::inwTO4 H. OTER(EXPLAN) 4: OTFER(EXPLAN)
H. OTER(EXPLAN)                                   4: OTFER(EXPLAN)
,}}
D fEGLAATORYFt::inwTO4
                                                      ,}}

Latest revision as of 21:25, 12 December 2024

Rev 1 to Monthly Operating Rept for Oct 1992 for CPSES Unit 1
ML20126A374
Person / Time
Site: Comanche Peak 
Issue date: 10/31/1992
From: Julie Hughes
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20126A361 List:
References
NUDOCS 9212210024
Download: ML20126A374 (4)


Text

,

~ _ -.

s

.w

' Attachment 2 to TXX.N

- PeGe 1 of 4 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT -

REV. 1 DOCKETNO:

M UNIT:

CPSES1-DATE:

December 8.1992 COMPLETED BYi.

Janet Hughes -

TEl.EPHONE:

8174074331 1

OPERATING STATUS I

1.

_ Reporting Period: OCTOBER 1992 Gross hours in reporting period:

25 i

2.

Currently authorized power level (MWt):

3111 Max. depend. capacity (MWo. Net): 11 jig.

  • Design i

Electrical Rating (MWe Net):

1 liq 3.

Power level to which restricted (if any) (MWe-Net):

NEdf

. 4 Romeons for restriction (if any):

THISMONTH YRTO DATE COMUt.ATIVE 5.

Number of hours reactor was critical

$17.2 0830.6 153544 0

24 m

6.

Reactorreserve shutdown hours

'5*2d 7.

sours en.raioron in.

0 0-0-

8.

Unit reserve shutdown hours 1

1.506M 21.N.4M

-47.H2.6 9.

Gross thermal energy Generated (MWH) 533.013-

-7.282.783 15.509,781-

10. Gross electrical energy generated (MWH) 11.

Not electrical energy generated (MWH) 501.435

. a.sessed -

t4.a24,sas

12. Reactor Service factor 88 4

- 98 8 78 9 13.

Reactor availability factor

- 89.4 96.1 89.2 14 Unit service factor 66.7 93.3

_77.3

15. Unt availabaity factor E7

. 93.3 '

77.3' 58 5 82.3

- m3 -

16. Unli capacity factor (Using MDC) 56 5 82.3 -

e&3'

17. _ Unit capadty factor (Using Design MWe) 8.2 3.s 7.9
18. Unit forced outage rate 19.

Shutdowns scheduled over next 6 months (Type, Dale, and Duration of each): -None 20.

If shutoown at end of report period, cettmated date of startup:.12,1442 4-21.

Units in test status (prior to commerdal operation):

_ ACHIEVED Commercial Operation 900813

-Estimated OCTOBER =1992:

REVISION 1

- 9212210024-921215-R

'ADOCK 05000445 PDR PDR

. ~... -.

-..~.-

~;

e Atachmen't 2 to TXX 9307 Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL REY.1 DOCKET NO:

M UNIT:

CPSES1 DATE:

Decernber 8.1992 COMPLETED BY; Janet Hughes TELEPHONE:

817m74331 MONTH: IMlIQBER 1992

[MY AVERAGE DAILY POWER LEVEL DAY AVEf%GE DAtLY POWER LEVEL (MWo. Net)

(MWo. Net) 1 1098 17 1076 2

1096 18 1092 3

1096 19 1000 4

1064 20 1094 5

1W 21 1095 6

1003 22 729 7

1000 23 3

8 1064 24 0

9 1086 25 0

10 1102 26 0

11 10GB 27 0

12 542 28 0

13 0

29 0

14 427 30 0

15 871 31 0

16 1089 OCTOBER 1992 REVISION 1

4 Attachment 2 to TXX.92007 Pe0'3#f4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH REV.1 g

g

. UNIT:

CPSES1 DATE:

Decenter 8 1992 -

COMPLETED BY:

Janet Hu9he8 '

TELEPHONE:

6174e74331 MONTH: OCTORFR 1992 1041 0000 Unit started the month in MODE 1 with the reactor. operating at approxtrnately 100 percent of rated thermal power.

1W12 1214 The reactor was manually tripped when Stoam Generator No. 4 Feedwater Flow Control Valve f ailed closed. Unit entered MODE 3. LER 92-022 submitted.

1W13 1322 Unit entered MODE 2.

1W13 2043 Unit entered MODE 1, 1W13 2107 Generator on-line.

1W22 0832 Commenced power reduction for second refueling.

1W23 0136 Trlpped Unit i Main Turbine.

1 &23 0137 Urdt entered MODE 2.

1023 1042 Unit entered MODE 3.

1W23 1420 Manuel reactor trip following dropped control rods while troubleshooting urgent failure alarm.

LER 92 025 to be submitted.

1 &25 1943 Unit entered MODE 4.

1626-2300 Unit entered MODE 5.=

1031 2@

Unit ended the month in MODE 5.-

L t

L OCTOBER.1992.

L

-REVISION 1.

1

\\

! to TXX S2T7 Page 4 of 4 UNIT SHUTDOWHS AND POWER REDUCTIONS 50445 DOCKETto:

CPSES 1 UMT:

OATE-Decenter 8,1992 CO@tETEDBY; Janet Hughes

_ CTOBER 1992 O

REPORT MONTH

  1. ETHCDOF TWE SHl1TTNG DOWN Ff0RTD OLEATON TmmACTG10R NQ M

SSCMD E FD (HOLRS1 EASON fEDtf2GFCWER CORRtCiWEACDONSCCASENTS 10 1 &12 F

32.9 A

2 The reactor was nurnsasy inpped when Steam 1

Genenmor No 4 Feedwater Flow Coritrol Valve l

farled cbsed, Urw entered MODE 3. LER 92-022 was smed 11/11/92.

11 1W14 F

20.8 D

4 Tectn' cal Specit:abon restrictbn to less than 50%

RTP by axial flux cut of Irnits.

12 1923 S

215.4 C

1 Refuehng outage. COiss-M power reduction 0632 22 October.

OCTOBER 1992 l

REVISION 1

2) hET100 1) fEASCN A ECUHAENTFALURE(EXPLAN)

E. OPERATOR TRAR&G NO UCe4SE EXAAWMTON 1: MANUAL B: MedTOR TEST F: ADMMSTRATNE 2: MANUALSCHAM C fEFUEING G: OPERATONALEAROR(EXPUNN) 3: NJTCMATC SCRAM D fEGLAATORYFt::inwTO4 H. OTER(EXPLAN) 4: OTFER(EXPLAN)

,