Monthly Operating Rept for Nov 1992 for CPSES Unit 1
ML20126A366
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 11/30/1992
From: Julie Hughes
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20126A361 List:
References
NUDOCS 9212210021
Download: ML20126A366 (4)


Text

.

,i-

i ll
  • Attachment 1 C3 TXX. 92807 i

Page 1 of 4 1

COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCKETNO:

N UNIT:

CPSES1 DATE:

December 8,1992 COMPLETED BY:

Janet Hughes TELEPHONE:

8174974331 OPERATING STATUS 1,

Reporting Perbd: NOVEMBER 1992 Gross hours in reporting parlod:

22Q 2.

Currently authorized power level (MWt):

Mil Max, depend. capacity (MWe Net):.1150

  • Design -

Electrical Rating (MWo. Net):

1150 3.

Power level to which restricted (if any) (MWo. Net):

NONE 4.

Reasons for restriction (if any):

THISMONTH YRTO DATE CUMULATIVE 5.

Number of nours reactor was critical 0

0939.6 153542

- 6.

Reactor reserve chutdown hours 0

20A 20033 7.

Hour,s ger;erator on Ene 0-M2 1W2.4 8.

Unit reserve shutdown hours 0

0-o 9.

Gross thermal energy generated (MWH) 0

_ 21,780.411 47,112.405 10.

Gross electrical energy generated (MWH) 0 7,262,783 15.599.781

11. Net electrical energy generated (MWH) 0 6 2,364 14,824.928 12.

Reactor Service factor 0

86.3

-76.1 13.

Reactor availability factor 0

06.6 86 0 L

14.

Unq servios factor

.0 86 74.6 15.

Unh availab!!_Ity factor -

-0 85

~ 74.6 -

' 16.

Unh capacity factor (Using MDC) 0 74 9 63 9 -

- 17, Unit capacity factor (Using Design MWe) 0 74 S -

MS 18.

Unit forced outage rate _

0 3a 73 Shutdowns scheduled over next 6 months (Type, Date, and Duratbn of each):

Refuelire outage number 19.

2, began on October 23, and is currently in progress.

20. If shutdown at end of report period, estimated date of startup:

12/2142-21.

Units in test status (prior to commercial operalbn):

ACHIEVED CommercialOperation 900813 Estimated 9212210021 921215 PDR-ADOCK 05000445 l

'R PDR

j to TXX. M07 Page 2of 4 AVERAGE DAILY UNIT POWER LEVEL DOCKETNO:

N UNIT:

CPSES 1 DATE:

December 8,1992 COMPLETED BY:

Janet Hughes TELEPHONE:

017 8374331 M(WTH: NOVFMBER 1992

[AY AVERAGE DAILY POWER LEVEL CAY AVERAGE DAILY POWER LEVEL (MWo-Net)

(MWe Not)

I 17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 16 0

I

e Attachm6nt 1 to TXX. W Page 3of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DCCKET NO:

N UNIT:

CPSES 1 DATE:

December 8,1992 COMPLETED BY:

Janet Hughes TELEPHONE:

817 EB74331 MONTH: NOVFMRFR 1992 11/1 0000 Unit started month in MODE 5.

11 0 2222 Entered MODE 6.

11/9 2312 Unit 1 core completed offloaded. Extted MODE 6.

11/26 0115 Began Unit 1 core reload. Eidered MODE 6.

1100 2400 Unit ended month in MODE 6.

Mabr work items:

Snubber inspections, Motor Operated Valve testing, Unit 2 Integrated Testing and interf ace to Unit 1. Steam Generator Sbdge Lance, Main Turtaine Stop and Control Valves, Steam Generator Eddy Current testing Reactor Coolant Pump Seals, offsite power grid maintenance.

________M

.. to TXX-9287/

Page 4 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO:

N LNT:

CPSES 1 DATE:

Deoetter 8,1992 COFLETEDBY:

Janet Hughes REPORT MONTH NOVEMBER 1992 SETHODOF TE SHlRTNG D0%N Ff0RCED DLEATION TEEACTOROR N1 MIE SSCEDl1ED (HOURS)

NASCN FEDUCtGFOWER CORRECUVEACDOe m 13 szttot s

a c

i se % oute.

1)

NASON

2) m A: N FAILURE (EXPLAN)

E. OPERATOR TRAr#G NO UCENSE EXAMNATX]N 1: MANUAL

' B: MANTORTEST F: ADMMSTRATIVE 2: MANUALSCRAM C: EFUELNG G OPERATIONALEMOR(EXPLAN) 3: AUTOMATICSCRAM

& EGLIATORYRESTRCTION H: OTHER(EXPLMN) 4: OTHER N y

.