ENS 41836: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 05/17/2005 00:42 CDT
| event date = 05/17/2005 00:42 CDT
| last update date = 07/12/2005
| last update date = 07/12/2005
| title = Invalid Actuation Of The "B" Residual Heat Removal (Rhr) Pump.
| title = Invalid Actuation of the "B" Residual Heat Removal (Rhr) Pump.
| event text = July 12, 2005 Telephone Report in Accordance with 10 CFR 50.73(a)(2)(iv)(A) Invalid Actuation of the "B" Residual Heat Removal (RHR) Pump.
| event text = July 12, 2005 Telephone Report in Accordance with 10 CFR 50.73(a)(2)(iv)(A) Invalid Actuation of the "B" Residual Heat Removal (RHR) Pump.
SPECIFIC TRAINS AND SYSTEMS THAT WERE ACTUATED
SPECIFIC TRAINS AND SYSTEMS THAT WERE ACTUATED

Latest revision as of 21:20, 1 March 2018

ENS 41836 +/-
Where
Point Beach NextEra Energy icon.png
Wisconsin (NRC Region 3)
Reporting
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation
Time - Person (Reporting Time:+1355 h56.458 days <br />8.065 weeks <br />1.856 months <br />)
Opened: Jack Gadzala
16:42 Jul 12, 2005
NRC Officer: John Mackinnon
Last Updated: Jul 12, 2005
41836 - NRC Website
Loading map...