4 Attachment IV to NA 92-0121 Page 1 of 2 Attachment IV Proposed Technical Specification Changes 3
4 Attachment IV to NA 92-0121 Page 1 of 2 Attachment IV Proposed Technical Specification Changes 3
9212290049 921222 PDR -ADOCK 05000482 P               -pop
9212290049 921222 PDR -ADOCK 05000482 P
-pop


e
e
' , ' . 'oAttachment Page 2 of 2 IV to NA 92-0121 TABLE 4.8-1                                                       ,
'oAttachment IV to NA 92-0121 Page 2 of 2 TABLE 4.8-1
                                                                                                                                                      'I DIESEL GENERATOR TEST SCHEDULE
' I DIESEL GENERATOR TEST SCHEDULE men s
* men s
NUMBER OF FAILURES IN NUhBER OF FAILURES,W LAST 20 VALID TESTS
NUMBER OF FAILURES IN                           NUhBER OF FAILURES ,W                                                                     ,
* LAST''100 VALIO JE$TS*
LAST 20 VALID TESTS
TEST FREQUENCY l
* LAST''100 VALIO JE$TS*                       TEST FREQUENCY                         l
'N/
                      <1                                                      'N/                               At least once per 31 days
[(( /,x_, 4s
                      >    2**
<1 At least once per 31 days N
[((         /,x_, 4s N
y'l
                                                                                >5        \                     At least once per 7 days y'l              .
\\
L,,%.. -                                                                            -
At least once per 7 days
M LFTS                                                                     !
> 2**
                                                                                                                                                        -r
>5 L,,%.. -
                                                                      ~
M LFTS
- r
~
j
j
* Criteria for determinin'g number of valid failures and number of valid tests                                                           '
* Criteria for determinin'g number of valid failures and number of valid tests shall.be in accordance with Regulatory Position C.2.e of Regulatory-
shall.be in accordance with Regulatory Position C.2.e of Regulatory-
~
                                                                                                                                          ~
Guide.l.108, Revision 1, August 1977.but determined on a per-diesel generator basis.
Guide.l.108, Revision 1, August 1977 .but determined on a per-diesel generator basis. For the purposes of determining the required test frequency, the pre-vious test failure count may be reduced to zero if a complete diesel overhaul to like-new conditions is completed, provided that the overhaul including:
For the purposes of determining the required test frequency, the pre-vious test failure count may be reduced to zero if a complete diesel overhaul to like-new conditions is completed, provided that the overhaul including:
              -appropriate post maintenance operation and testing, is specifically approved.
-appropriate post maintenance operation and testing, is specifically approved.
by the manufacturer, and if acceptable reliability has-been demonstrated.
by the manufacturer, and if acceptable reliability has-been demonstrated.
reliability criterion shall be the successful completion of 14-consecutive-. The tests in a single series. . Ten of these tests shall-be in accordance with Specifications 4.8.1.1.2a.4 and 4.8.1.1.2a.5, four tests.: in accordance with' Speci fication 4.8.1.1. 2f. If this criterion is not satisfied during the-first                                     ~
reliability criterion shall be the successful completion of 14-consecutive-. The tests in a single series.. Ten of these tests shall-be in accordance with Specifications 4.8.1.1.2a.4 and 4.8.1.1.2a.5, four tests.: in accordance with' Speci fication 4.8.1.1. 2f.
serie: of tests, any alternate criterion to be used to transvalue the failure                                                           ,
If this criterion is not satisfied during the-first
count to zero requires NRC approval.
~
            **The associated test frequency shall be maintained-until seven consecutive-f ailure free tests.have been performed and the number of failures in the last ?0 valid tests has been' reduced to-one.
serie: of tests, any alternate criterion to be used to transvalue the failure count to zero requires NRC approval.
WOLF CREEK                   UNIT 1                               3/4 8-7 AmendmentNo.[-                 .
**The associated test frequency shall be maintained-until seven consecutive-f ailure free tests.have been performed and the number of failures in the last ?0 valid tests has been' reduced to-one.
',i ~  ,..,v,4       - - , , . - - . ,,-,~, ..
AmendmentNo.[-
                                                  . _ , , ~ , , ,       ,__   -,,.-.a_,. . _ , , . . - , . . . 4._. ._. ,......m ,    _
WOLF CREEK UNIT 1 3/4 8-7
                                                                                                                                            . .;.--..- '}}
',i ~
-,,.-.a_,.
4._.
,......m 4
,..,v,4
- -,,. - -.,,-,~,..
. _,, ~,,,
,__}}

Latest revision as of 19:34, 12 December 2024

Proposed Tech Specs Revising TS Table 4.8-1,DG Test Schedule,To Eliminate Requirement to Increase Testing Frequency Upon Experiencing Five or More Failures in Last 100 Valid Tests
ML20126E192
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 12/22/1992
From:
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20126E174 List:
References
NUDOCS 9212290049
Download: ML20126E192 (2)


Text

.

4 Attachment IV to NA 92-0121 Page 1 of 2 Attachment IV Proposed Technical Specification Changes 3

9212290049 921222 PDR -ADOCK 05000482 P

-pop

e

'oAttachment IV to NA 92-0121 Page 2 of 2 TABLE 4.8-1

' I DIESEL GENERATOR TEST SCHEDULE men s

NUMBER OF FAILURES IN NUhBER OF FAILURES,W LAST 20 VALID TESTS

  • LAST100 VALIO JE$TS*

TEST FREQUENCY l

'N/

[(( /,x_, 4s

<1 At least once per 31 days N

y'l

\\

At least once per 7 days

> 2**

>5 L,,%.. -

M LFTS

- r

~

j

  • Criteria for determinin'g number of valid failures and number of valid tests shall.be in accordance with Regulatory Position C.2.e of Regulatory-

~

Guide.l.108, Revision 1, August 1977.but determined on a per-diesel generator basis.

For the purposes of determining the required test frequency, the pre-vious test failure count may be reduced to zero if a complete diesel overhaul to like-new conditions is completed, provided that the overhaul including:

-appropriate post maintenance operation and testing, is specifically approved.

by the manufacturer, and if acceptable reliability has-been demonstrated.

reliability criterion shall be the successful completion of 14-consecutive-. The tests in a single series.. Ten of these tests shall-be in accordance with Specifications 4.8.1.1.2a.4 and 4.8.1.1.2a.5, four tests.: in accordance with' Speci fication 4.8.1.1. 2f.

If this criterion is not satisfied during the-first

~

serie: of tests, any alternate criterion to be used to transvalue the failure count to zero requires NRC approval.

    • The associated test frequency shall be maintained-until seven consecutive-f ailure free tests.have been performed and the number of failures in the last ?0 valid tests has been' reduced to-one.

AmendmentNo.[-