                                            JUN 211985
JUN 211985
        In Reply Refer To:
In Reply Refer To:
        Docket:     50-458/85-39
Docket:
        Gulf States Utilities
50-458/85-39
        ATTN:   William J. Cahill, Jr.
Gulf States Utilities
                Senior Vice President
ATTN:
                River Bend Nuclear Group
William J. Cahill, Jr.
        P. O. Box 2951
Senior Vice President
        Beaumont, Texas 77704
River Bend Nuclear Group
        Gentlemen:
P. O. Box 2951
        This refers to the inspection conducted by Mr. C. C. Harbuck of this
Beaumont, Texas 77704
        office during the period May 20-25, 1985, of activities authorized by
Gentlemen:
        NRC Construction Permit CPPR-145 for River Bend Station, and to the discussion
This refers to the inspection conducted by Mr. C. C. Harbuck of this
        of our findings with Mr. T. F. Plunkett, and other members of your staff at the
office during the period May 20-25, 1985, of activities authorized by
        conclusion of the inspection.
NRC Construction Permit CPPR-145 for River Bend Station, and to the discussion
        Areas examined during the inspection included preoperational test performance,
of our findings with Mr. T. F. Plunkett, and other members of your staff at the
        preoperational test results and a review of the actions you have taken to
conclusion of the inspection.
        correct deficiencies you have previously identified to the NRC pursuant to
Areas examined during the inspection included preoperational test performance,
        10 CFR Part 50.55(e). Within these areas, the inspection consisted of selective
preoperational test results and a review of the actions you have taken to
        examination of procedures and representative records, interviews with personnel,
correct deficiencies you have previously identified to the NRC pursuant to
        and observations by the inspector. These findings are documented in the
10 CFR Part 50.55(e). Within these areas, the inspection consisted of selective
        enclosed inspection report.
examination of procedures and representative records, interviews with personnel,
        Within the scope of the inspection, no violations or deviations were
and observations by the inspector.
        identified.
These findings are documented in the
        We have also examined actions you have taken with regard to previously
enclosed inspection report.
        identified inspection findings. The status of these items is identified in
Within the scope of the inspection, no violations or deviations were
        paragraph two of the enclosed report.
identified.
        Should you have any questions concerning this inspection, we will be pleased
We have also examined actions you have taken with regard to previously
        to discuss them with you.
identified inspection findings.
                                                  Sincerely,
The status of these items is identified in
                                                    0.ti- ''' % d By
paragraph two of the enclosed report.
                                                                  "
Should you have any questions concerning this inspection, we will be pleased
        8506270556 850621
to discuss them with you.
                                                            ~
Sincerely,
        PDR     ADOCK 05000458
0.ti- ''' % d By
        G                   PDR                   E. H. Johnson, Chief
8506270556 850621
                                                  Reactor Project Branch 1
~
        Enclosure:
"
        Appendix - NRC Inspection Report
PDR
          50-458/85-39
ADOCK 05000458
        cc:       next page)
G
              P1/A             1           RPB1
PDR
        C                    J Ja don      EHJohnson
E. H. Johnson, Chief
    '
Reactor Project Branch 1
        %pHebuck/lw
Enclosure:
              /85              /g85         b/70/85
Appendix - NRC Inspection Report
                                                                              fEOI   i
50-458/85-39
                                                                                          (
cc:
                                                                                        i
next page)
P1/A
1
RPB1
%pHebuck/lw
/g85
b/70/85
C
J Ja don
EHJohnson
/85
'
fEOI
i (
i


                                                ,_ -- -                           -                 _
,_ -- -
      .
-
    .
_
        Gulf States Utilities                                               -2-
.
        cc w/ enclosure:
.
        Gulf States Utilities
Gulf States Utilities
        ATTN:     J. E. Booker, Manager
-2-
                  Engineering, Nuclear
cc w/ enclosure:
                      Fuels and Licensing
Gulf States Utilities
        P. O. Box 2951
ATTN:
        Beaumont, Texas 77704
J. E. Booker, Manager
        Louisiana State University,
Engineering, Nuclear
            Government Documents Department
Fuels and Licensing
  ,
P. O. Box 2951
        Louisiana Radiation Control Program Director
Beaumont, Texas 77704
i
Louisiana State University,
;      bec to DMB (IE01)
Government Documents Department
        bcc distrib. by RIV:
Louisiana Radiation Control Program Director
        *RPB1                                 R. P. Denise, DRSP
,
        * Resident Inspector                   R. D. Martin, RA
i
        *Section Chief (RPB1/A)               *D. Weiss, LFMB (AR-2015)
bec to DMB (IE01)
        * MIS System                         *C. C. Harbuck, RPB1/A
;
        *RSTS Operator
bcc distrib. by RIV:
        *EP&RPB
*RPB1
        *RIV File
R. P. Denise, DRSP
        *w/766
* Resident Inspector
;
R. D. Martin, RA
*Section Chief (RPB1/A)
*D. Weiss, LFMB (AR-2015)
* MIS System
*C. C. Harbuck, RPB1/A
*RSTS Operator
*EP&RPB
*RIV File
*w/766
;
i
i
i
i
        .--   . ._     _ _ _ . . , r , m--           _ _ - - . _ , - , ,     ,   , , . _ - , , ..   .. .m._- .,, _ ,
.--
.
._
_ _ _ . .
,
r
,
m--
_ _ - - . _ , - , ,
,
, ,
. _ - , ,
..
..
.m._-
.,, _ ,
}}
}}

Latest revision as of 16:03, 12 December 2024

Forwards Insp Rept 50-458/85-39 on 850520-25.No Violation or Deviation Noted
ML20127K723
Person / Time
Site: River Bend 
Issue date: 06/21/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
GULF STATES UTILITIES CO.
Shared Package
ML20127K726 List:
References
NUDOCS 8506270556
Download: ML20127K723 (2)


See also: IR 05000458/1985039

Text

-

.

.

JUN 211985

In Reply Refer To:

Docket:

50-458/85-39

Gulf States Utilities

ATTN:

William J. Cahill, Jr.

Senior Vice President

River Bend Nuclear Group

P. O. Box 2951

Beaumont, Texas 77704

Gentlemen:

This refers to the inspection conducted by Mr. C. C. Harbuck of this

office during the period May 20-25, 1985, of activities authorized by

NRC Construction Permit CPPR-145 for River Bend Station, and to the discussion

of our findings with Mr. T. F. Plunkett, and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection included preoperational test performance,

preoperational test results and a review of the actions you have taken to

correct deficiencies you have previously identified to the NRC pursuant to

10 CFR Part 50.55(e). Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with personnel,

and observations by the inspector.

These findings are documented in the

enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph two of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

0.ti-  % d By

8506270556 850621

~

"

PDR

ADOCK 05000458

G

PDR

E. H. Johnson, Chief

Reactor Project Branch 1

Enclosure:

Appendix - NRC Inspection Report

50-458/85-39

cc:

next page)

P1/A

1

RPB1

%pHebuck/lw

/g85

b/70/85

C

J Ja don

EHJohnson

/85

'

fEOI

i (

i

,_ -- -

-

_

.

.

Gulf States Utilities

-2-

cc w/ enclosure:

Gulf States Utilities

ATTN:

J. E. Booker, Manager

Engineering, Nuclear

Fuels and Licensing

P. O. Box 2951

Beaumont, Texas 77704

Louisiana State University,

Government Documents Department

Louisiana Radiation Control Program Director

,

i

bec to DMB (IE01)

bcc distrib. by RIV:

  • RPB1

R. P. Denise, DRSP

  • Resident Inspector

R. D. Martin, RA

  • Section Chief (RPB1/A)
  • D. Weiss, LFMB (AR-2015)
  • MIS System
  • C. C. Harbuck, RPB1/A
  • RSTS Operator
  • EP&RPB
  • RIV File
  • w/766

i

i

.--

.

._

_ _ _ . .

,

r

,

m--

_ _ - - . _ , - , ,

,

, ,

. _ - , ,

..

..

.m._-

.,, _ ,