| title = Loss | | title = Loss of Shutdown Cooling Capability | ||
| event text = On September 16, 2008 at 0734 the James A, FitzPatrick Nuclear Power Plant was shutdown and operating in the refueling mode (Mode 5), when shutdown cooling was lost. Shutdown cooling was lost while hanging a tagout on the Reactor Protection System (RPS). When removing fuses as directed by the tagout, isolation logic for Shutdown Cooling suction salve 10MOV-18 was actuated. This Suction Valve isolates the common shutdown cooling suction line to all Residual Heat Removal (RHR) Pumps. At the time of the isolation cavity flood-up was in progress and the time to boil was greater than 5.5 hours. The appropriate Technical Specification LCO Actions were entered and shutdown cooling was restored at 08:27. | | event text = On September 16, 2008 at 0734 the James A, FitzPatrick Nuclear Power Plant was shutdown and operating in the refueling mode (Mode 5), when shutdown cooling was lost. Shutdown cooling was lost while hanging a tagout on the Reactor Protection System (RPS). When removing fuses as directed by the tagout, isolation logic for Shutdown Cooling suction salve 10MOV-18 was actuated. This Suction Valve isolates the common shutdown cooling suction line to all Residual Heat Removal (RHR) Pumps. At the time of the isolation cavity flood-up was in progress and the time to boil was greater than 5.5 hours. The appropriate Technical Specification LCO Actions were entered and shutdown cooling was restored at 08:27. | ||
Power was restored to RPS and work in that system has been suspended pending the results our investigation into the cause of the event. Also additional controls have been established to review any electrical jumper/ protective tagging interactions prior to installation. | Power was restored to RPS and work in that system has been suspended pending the results our investigation into the cause of the event. Also additional controls have been established to review any electrical jumper/ protective tagging interactions prior to installation. |
Latest revision as of 21:13, 1 March 2018
Where | |
---|---|
Fitzpatrick New York (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat | |
LER: | 05000333/LER-2008-001 |
Time - Person (Reporting Time:+1.58 h0.0658 days <br />0.0094 weeks <br />0.00216 months <br />) | |
Opened: | Eugene Dorman 13:09 Sep 16, 2008 |
NRC Officer: | Jason Kozal |
Last Updated: | Sep 16, 2008 |