1CAN078504, Forwards Change Notice 1 to Primary Reactor Containment Integrated Leak Rate Test,Final Rept. Errors Caused by Use of Different Computer Sys for Generation of Rept: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:._.
{{#Wiki_filter:._.
ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK ARKANSAS 72203 (501)371-4000 July 15, 1985 1CAN078504 Mr. Harold R. Denton, Director ATTN:   Document Control Desk Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555
ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK ARKANSAS 72203 (501)371-4000 July 15, 1985 1CAN078504 Mr. Harold R. Denton, Director ATTN:
Document Control Desk Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555


==SUBJECT:==
==SUBJECT:==
Arkansas Nuclear Or.e - Unit 1 Docket No. 50-313 License No. DPR-51 Integrated Leak Rate Test Report Change Notice 1 Gentlemen:
Arkansas Nuclear Or.e - Unit 1 Docket No. 50-313 License No. DPR-51 Integrated Leak Rate Test Report Change Notice 1 Gentlemen:
Attached is Change Notice 1 and accompanying replacement pages to the Arkansas Nuclear One - Unit 1 (ANO-1) Integrated Leak Rate Test (ILRT) Final Report dated December, 1984. The subject report was submitted by {{letter dated|date=March 15, 1985|text=letter dated March 15, 1985}} (1CAN038507) in accordance with the requirements of Section 4.4.1.1 of the Unit 1 Technical Specification and 10CFR50 Appendix J(v)(b).
Attached is Change Notice 1 and accompanying replacement pages to the Arkansas Nuclear One - Unit 1 (ANO-1) Integrated Leak Rate Test (ILRT) Final Report dated December, 1984.
Subsequent to the submittal of this report, errors were discovered in the data presented in the report. These errors were discovered by the contractor used for the analysis of the test results and the preparation of the test report. The errors were caused by the use of a different computer system for the generation of the final report than was used during the test.
The subject report was submitted by {{letter dated|date=March 15, 1985|text=letter dated March 15, 1985}} (1CAN038507) in accordance with the requirements of Section 4.4.1.1 of the Unit 1 Technical Specification and 10CFR50 Appendix J(v)(b).
The computer system used for report generation did not contain the correct constants and calibration curves for the ANO-1 ILRT data. Although this error does not affect the calculated leak rate, portions of the data presented in the report are in error and could not be used to duplicate the reported results.
Subsequent to the submittal of this report, errors were discovered in the data presented in the report.
l l
These errors were discovered by the contractor used for the analysis of the test results and the preparation of the test report.
I l
The errors were caused by the use of a different computer system for the generation of the final report than was used during the test.
i 8507240101 850715                                                                   l PDR   ADOCK 05000313 P                   Pl>R fo0 t
The computer system used for report generation did not contain the correct constants and calibration curves for the ANO-1 ILRT data.
                              ....._. cm1- m1,m1,ee . . ..
Although this error does not affect the calculated leak rate, portions of the data presented in the report are in error and could not be used to duplicate the reported results.
                                                                                      \
l i
t 09 j
8507240101 850715 PDR ADOCK 05000313 P
Pl>R fo0
\\ 09j
....._. cm1-m1,m1,ee....
t t


Y Mr. Harold R. D:ntin                                     July 15, 1985 I
Y Mr. Harold R. D:ntin July 15, 1985 I
e    -
Please follow the instructions on the attached page iv to update the copies e
            .c Please follow the instructions on the attached page iv to update the copies under your control. - We hope this error has not inconvenienced you.
.c under your control. - We hope this error has not inconvenienced you.
Very t ly yours, M
Very t ly yours, M
J. Ted Enos Manager, Licensing JTE:RJS:ds Attachment L
J. Ted Enos Manager, Licensing JTE:RJS:ds Attachment L
e     7}}
e 7
~
- -}}

Latest revision as of 14:31, 12 December 2024

Forwards Change Notice 1 to Primary Reactor Containment Integrated Leak Rate Test,Final Rept. Errors Caused by Use of Different Computer Sys for Generation of Rept
ML20128K330
Person / Time
Site: Arkansas Nuclear 
Issue date: 07/15/1985
From: Enos J
ARKANSAS POWER & LIGHT CO.
To: Harold Denton
NRC OFFICE OF ADMINISTRATION (ADM), Office of Nuclear Reactor Regulation
Shared Package
ML20128K336 List:
References
1CAN078504, 1CAN78504, NUDOCS 8507240101
Download: ML20128K330 (2)


Text

._.

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK ARKANSAS 72203 (501)371-4000 July 15, 1985 1CAN078504 Mr. Harold R. Denton, Director ATTN:

Document Control Desk Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

Arkansas Nuclear Or.e - Unit 1 Docket No. 50-313 License No. DPR-51 Integrated Leak Rate Test Report Change Notice 1 Gentlemen:

Attached is Change Notice 1 and accompanying replacement pages to the Arkansas Nuclear One - Unit 1 (ANO-1) Integrated Leak Rate Test (ILRT) Final Report dated December, 1984.

The subject report was submitted by letter dated March 15, 1985 (1CAN038507) in accordance with the requirements of Section 4.4.1.1 of the Unit 1 Technical Specification and 10CFR50 Appendix J(v)(b).

Subsequent to the submittal of this report, errors were discovered in the data presented in the report.

These errors were discovered by the contractor used for the analysis of the test results and the preparation of the test report.

The errors were caused by the use of a different computer system for the generation of the final report than was used during the test.

The computer system used for report generation did not contain the correct constants and calibration curves for the ANO-1 ILRT data.

Although this error does not affect the calculated leak rate, portions of the data presented in the report are in error and could not be used to duplicate the reported results.

l i

8507240101 850715 PDR ADOCK 05000313 P

Pl>R fo0

\\ 09j

....._. cm1-m1,m1,ee....

t t

Y Mr. Harold R. D:ntin July 15, 1985 I

Please follow the instructions on the attached page iv to update the copies e

.c under your control. - We hope this error has not inconvenienced you.

Very t ly yours, M

J. Ted Enos Manager, Licensing JTE:RJS:ds Attachment L

e 7

~

- -