{{#Wiki_filter:F'                                                               U
{{#Wiki_filter:F' U
  'O   *.
'O A
A            log # TXX-93085
log # TXX-93085 File # 10010.2 Ref. # 10CFR50.36
                                                            .            ,      File # 10010.2 Ref. # 10CFR50.36
=
                                                            =           =
=
TUELECTRIC February 15, 1993
TUELECTRIC February 15, 1993
            % i!!!am J. Cahlil, Jr.
% i!!!am J. Cahlil, Jr.
Gwsp t h e f'rrudent U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Gwsp t h e f'rrudent U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555


Line 31: Line 31:
By:
By:
D. R. Woodlan Docket Licensing Manager RC/rc Attachment c - Mr. J. L. Hilhoan, Region IV Hr. T. Reis, Region IV Resident inspectors, CPSES (2)
D. R. Woodlan Docket Licensing Manager RC/rc Attachment c - Mr. J. L. Hilhoan, Region IV Hr. T. Reis, Region IV Resident inspectors, CPSES (2)
Mr. T. A. Bergman, NRR 220009                                                                                 ggpit I
Mr. T.
9302190369 930131                     .m N. onve snect t n. 81 t w u.Te m 75 mt                 Ii PDR ADOCK 0S000445
A.
      -R                           PDR.
Bergman, NRR 220009 ggpit I
9302190369 930131
.m N. onve snect t n. 81 t w u.Te m 75 mt I
PDR ADOCK 0S000445 i
-R PDR.


c Mischmerit 1 t) TXX 93006
c Mischmerit 1 t) TXX 93006
              - Page 1 of 4 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCKET NO:                   60 4 -
- Page 1 of 4 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCKET NO:
UNIT: -                   CPSES1 DATE:               Februar/11,1993 COMPWTED BY:         - Janet Hughos .
60 4 -
TE2 PHONE:             817407 4331 OPERATING STATUS
UNIT: -
: 1. Reporting Period: JANUARY 1993           Gross hours in reporting porlod:     2M~
CPSES1 DATE:
: 2. Currently authorized power level (MWI):'       Mil Man. depend. capacity (MWe Net): 1150
Februar/11,1993 COMPWTED BY:
* Doston Electrical Rating (MWo. Net):     11.10
- Janet Hughos.
: 3. Power level to which restricted (if any) (MWo Not):         NOME
TE2 PHONE:
: 4. Reasons for restrictton (if any):
817407 4331 OPERATING STATUS 1.
THIS MOMH -       YRTO DATE - CUMJt.ATIVE                             -
Reporting Period: JANUARY 1993 Gross hours in reporting porlod:
: 5. Number of hours reactor was critical                                 MA               MA                     16,223 0L             0                   2256.6                     .
2M~
: 6. Reactor reserve shutdown hours
2.
: 7. Hours generator on line                                               8884            m                    15.6474                      .
Currently authorized power level (MWI):'
0              0.                       0
Mil Man. depend. capacity (MWe Net): 1150
: 8. Unit reserve shutdown hours                                                                                                               ,
* Doston Electrical Rating (MWo. Net):
: 9. Gross thermal energy generated (MWH) 1A 103-           1.E.103             49245.930                       ;
11.10 3.
L                10. Gross electrical energy generated (MWH)                             656A27         '050A27               16.291.592 623,121          823,121              15A65A97 _
Power level to which restricted (if any) (MWo Not):
: 11. Net electrical energy generated (MWH)
NOME 4.
: 12. Reactor Service factor                                                 94.7           94.7                     74.9
Reasons for restrictton (if any):
: 13. Reactor availability factor                                           94.7           94 7                   . 654 14     Unit service factor                                                   92.6           92 6                   73.2
THIS MOMH -
: 15. Unit availability factor                                                 92.6           92 6                     73 2                     ,
YRTO DATE - CUMJt.ATIVE 5.
: 16. Unit capacity factor (Usine MDC)                                         72 2            72 &                    a2.1.
Number of hours reactor was critical MA MA 16,223 0L 0
                                                                                            . 72 2           72 2 -                   621 :
2256.6 6.
: 17. Unit capacity factor (Using Design MWe)                                                                                                 l
Reactor reserve shutdown hours 8884 m
: 18. Ur:lt forced outage rate                                               74              7#                      7#
15.6474 7.
19 ; Shutdowns scheduled ovor next 6 months (Type. Date, and Duration of each);
Hours generator on line 0
: 20. If shutdown at end of report period, estimated date of startup:                                                                           ,
0.
: 21. Units in test status (prior to commerclal operation):                 ACHEVED Commercial Operation           900813 Estimated I
0 8.
Unit reserve shutdown hours 1A 103-1.E.103 49245.930 9.
Gross thermal energy generated (MWH) 656A27
'050A27 16.291.592 L
10.
Gross electrical energy generated (MWH) 11.
Net electrical energy generated (MWH) 623,121 823,121 15A65A97 _
12.
Reactor Service factor 94.7 94.7 74.9 13.
Reactor availability factor 94.7 94 7
. 654 14 Unit service factor 92.6 92 6 73.2
: 15. Unit availability factor 92.6 92 6 73 2 72 2 72 &
a2.1.
: 16. Unit capacity factor (Usine MDC)
. 72 2 72 2 -
621 :
17.
Unit capacity factor (Using Design MWe) l 74 7#
7#
18.
Ur:lt forced outage rate 19 ; Shutdowns scheduled ovor next 6 months (Type. Date, and Duration of each);
20.
If shutdown at end of report period, estimated date of startup:
: 21. Units in test status (prior to commerclal operation):
ACHEVED Commercial Operation 900813 Estimated I
l f[
l f[
L           '
L
                                                                                                                                        =
..:.- -. - - -.. 2.-- - -.. -. -
J                      . :. . . .
J
                                      . . - .  . - .-          . .:.- -. - - - . . 2 .-- - -. . - . -                             -          -    .- ,,
=


1 Attachment 1 to TXX. 9xe5 Page 2 of 4 AVERAGE DAILY LNIT POWER LEVEL DOCKET NO:           ' SO445 UNIT:               CPSGS 1 DATE:           February 11,1993 COMPLETED BY:     Janet Hughes TELEPFONE:         617+375331 MONTH: JANUARY 1993 DAY           AVERAGE DAILYPOWER LEVEL         CAY         AVERAGE DAILY POWER LEVEL (MWe Net)                                   (MWo Net) 1                     530                       g7                   1090 2                     555                       to                   512 3                     W                         19                   36-4                     895                       20                   375 5                     907                       21                   732 6                     #                        22                   1071 7                     909 23                   12 8                     12                       24                   513 9                     1000                       25                   0
. to TXX. 9xe5 Page 2 of 4 AVERAGE DAILY LNIT POWER LEVEL DOCKET NO:
    -10                   1093                       26                   510 11                   1091                       27                   930 12                   1009                       28                   1074 13                   1089                       29                   1066 14                     1100                     30                   1000 15                   1092                       31                   1095 16                     BBS
' SO445 UNIT:
CPSGS 1 DATE:
February 11,1993 COMPLETED BY:
Janet Hughes TELEPFONE:
617+375331 MONTH: JANUARY 1993 DAY AVERAGE DAILYPOWER LEVEL CAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWo Net) 1 530 g7 1090 2
555 to 512 3
W 19 36-4 895 20 375 5
907 21 732 6
22 1071 7
909 23 12 8
12 24 513 9
1000 25 0
-10 1093 26 510 11 1091 27 930 12 1009 28 1074 13 1089 29 1066 14 1100 30 1000 15 1092 31 1095 16 BBS


      .    +.
+.
Attachment I to TXX 93086 Page 3 of 4
Attachment I to TXX 93086 Page 3 of 4


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NOi         W4 UNIT:             CPSES1                             j OATE:         February 11.1993 CCMPLETED BY:   Janet Hughes - ___
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NOi W4 UNIT:
TELEPHONE:       8174874331                         I i
CPSES1 j
l
OATE:
                                                                                                                                                                                                                                )
February 11.1993 CCMPLETED BY:
MONTH: JANUARY 1993 i
Janet Hughes - ___
0141                       0000                               Unit started rnonth in MODE 1, continuing ascent to full power following second rofueling '                                                           l outage.
TELEPHONE:
01r18                   -1144                                 Reactor tripped due to intermediate Range (IR) Hgh Flus inadvenently unblocked while                                                                 i performing surveillanco lost. Unit entered MODE 3. LER 93 001 to be submitted.
8174874331 I
01/19                     0745                               Unit entered MODE 2, 0822                               Reactor is crtical.
i l
128                               Unit entered MODE 1.
MONTH: JANUARY 1993
1317                               Synchronized to the gnd.
)
01/24                     1112                               Reactor tripped duo to pressurizer pressure transtnitter spiked low causing ono -
i 0141 0000 Unit started rnonth in MODE 1, continuing ascent to full power following second rofueling '
                                                                      ' ovenemperature N16 channol to trip white another chantwlwas in trip 1of surveillanco tostingi                                                         l
l outage.
                                                                      - Untt entered MODE 3; LER 93 002 to be submitted.
01r18
01/25                     0530                               Unit entered MODE 2.
-1144 Reactor tripped due to intermediate Range (IR) Hgh Flus inadvenently unblocked while i
0608                               Reactor is craical.
performing surveillanco lost. Unit entered MODE 3. LER 93 001 to be submitted.
1636                               Unit entered MODE 1.
01/19 0745 Unit entered MODE 2, 0822 Reactor is crtical.
l 1862                               Synchronized to the grid.                                                                                                                             ,
128 Unit entered MODE 1.
01/31                     2400                               Unt inded rnonth in MODE 1.
1317 Synchronized to the gnd.
01/24 1112 Reactor tripped duo to pressurizer pressure transtnitter spiked low causing ono -
' ovenemperature N16 channol to trip white another chantwlwas in trip 1of surveillanco tostingi l
- Untt entered MODE 3; LER 93 002 to be submitted.
01/25 0530 Unit entered MODE 2.
0608 Reactor is craical.
1636 Unit entered MODE 1.
l 1862 Synchronized to the grid.
01/31 2400 Unt inded rnonth in MODE 1.
1 l
1 l
( ':'
( ':'
        .-    _. . . _ - . - _ _ . . _ . - . -                                                      _ _ . - , . _ . _ _ . _ _ _                  . - . . ~ . , . . . _   ..._..,n.._   ,    . .      . .., .; m ; , a.- _
. -.. ~.,... _
..._..,n.._
...,.; m ;, a.- _


t Attachtnent 1 to TXX- 4Trn
t Attachtnent 1 to TXX-4Trn Page 4 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO-N UNIT:
* Page 4 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO-                     N                                 >
CPSES1 DATE.
UNIT:                     CPSES1 DATE.               Fetuuary 11,1993 COMPLETEDBY:         M Hughes
Fetuuary 11,1993 COMPLETEDBY:
;-                                                                                                        REPORT MONTH JANt;ARY 1993             m                      817497 6 131
M Hughes 1
m 817497 6 131 REPORT MONTH JANt;ARY 1993
)
)
wTHOooF
wTHOooF TE SHUTTNGDOMe Ff0RCED DOHATE N TFEREACTOROR M1
!-                                                                            TE                                             SHUTTNGDOMe Ff0RCED             DOHATE N                   TFEREACTOROR M1     .DATE           SSCFEDULED         N,               FEASO4   FEDUCNG POWEF1 CORRECTWEACTIOPGCOMMENTS l                                                     1     930118                 F                 25 6           G           3         Interrnediale Range Q Fnsu Reactor trip j                                                                                                                                           madvertenlly urtlocked at 100% RTP.
.DATE SSCFEDULED N,
i LER 93-00t to be submeted
FEASO4 FEDUCNG POWEF1 CORRECTWEACTIOPGCOMMENTS l
                                                    '2     500124                 F                 29.7           A           3       Over Ter@erature N-16 Reactor trip due to pressurizer pressure transnailler +4 edlow.
1 930118 F
25 6 G
3 Interrnediale Range Q Fnsu Reactor trip
. I j
madvertenlly urtlocked at 100% RTP.
LER 93-00t to be submeted i
' 2 500124 F
29.7 A
3 Over Ter@erature N-16 Reactor trip due to pressurizer pressure transnailler +4 edlow.
LER 93-002 to be sutwnIIed.
LER 93-002 to be sutwnIIed.
1)-     FEASCN
1)-
: 2) N A EOUIPENTFAILUFE(EXPLAN)                     E OPERATORTRANNG AND UCENSEEXAMNATION .         1: MANUAL i
FEASCN
B: MANTOR TEST '                             P. ADWilSTRATWE                                 2- MANUALSCRAM
: 2) N A EOUIPENTFAILUFE(EXPLAN)
: C: FEFUE1JNG G- OPERATIONALERROR(EXPUWN)                     3: AUTOMATICSCRAM D: ' FEGLAATORYFESTHCTION                     H: OTFER(EXPLMN) 4 4: OT)ER(EXPUnJN) t 4
E OPERATORTRANNG AND UCENSEEXAMNATION.
r 4 .- - ,,                    ~ - - -               ee   mve   n. ,    -- .    - -        n       ,,,- ,  n - p-n.,   , , , ,.          r}}
1: MANUAL i
B: MANTOR TEST '
P. ADWilSTRATWE 2-MANUALSCRAM
: C: FEFUE1JNG G-OPERATIONALERROR(EXPUWN) 3: AUTOMATICSCRAM D: ' FEGLAATORYFESTHCTION H: OTFER(EXPLMN) 4: OT)ER(EXPUnJN) 4 t
4 r
4
~ - - -
ee mve n.
n n
p-n.,
r}}

Latest revision as of 13:17, 12 December 2024

Monthly Operating Rept for Jan 1993 for Comanche Peak Steam Electric Station Unit 1
ML20128L768
Person / Time
Site: Comanche Peak 
Issue date: 01/31/1993
From: Julie Hughes, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-93085, NUDOCS 9302190369
Download: ML20128L768 (5)


Text

F' U

'O A

log # TXX-93085 File # 10010.2 Ref. # 10CFR50.36

=

=

TUELECTRIC February 15, 1993

% i!!!am J. Cahlil, Jr.

Gwsp t h e f'rrudent U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) - UNIT 1 DOCKET NO. 50 445 MONTHLY OPERATING REPORT FOR JANUARY 1993 Gentlemen:

Attached is the Monthly Operating Report for January 1993 prepared and submitted pursuant to Technical Specification 6.9.1.5 contained in Appendix A to the Comanche Peak Ste,am Electric Station Unit 1 Operating License No. HPF-87.

Sincerely, William J. Cahill, Jr.

By:

D. R. Woodlan Docket Licensing Manager RC/rc Attachment c - Mr. J. L. Hilhoan, Region IV Hr. T. Reis, Region IV Resident inspectors, CPSES (2)

Mr. T.

A.

Bergman, NRR 220009 ggpit I

9302190369 930131

.m N. onve snect t n. 81 t w u.Te m 75 mt I

PDR ADOCK 0S000445 i

-R PDR.

c Mischmerit 1 t) TXX 93006

- Page 1 of 4 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCKET NO:

60 4 -

UNIT: -

CPSES1 DATE:

Februar/11,1993 COMPWTED BY:

- Janet Hughos.

TE2 PHONE:

817407 4331 OPERATING STATUS 1.

Reporting Period: JANUARY 1993 Gross hours in reporting porlod:

2M~

2.

Currently authorized power level (MWI):'

Mil Man. depend. capacity (MWe Net): 1150

  • Doston Electrical Rating (MWo. Net):

11.10 3.

Power level to which restricted (if any) (MWo Not):

NOME 4.

Reasons for restrictton (if any):

THIS MOMH -

YRTO DATE - CUMJt.ATIVE 5.

Number of hours reactor was critical MA MA 16,223 0L 0

2256.6 6.

Reactor reserve shutdown hours 8884 m

15.6474 7.

Hours generator on line 0

0.

0 8.

Unit reserve shutdown hours 1A 103-1.E.103 49245.930 9.

Gross thermal energy generated (MWH) 656A27

'050A27 16.291.592 L

10.

Gross electrical energy generated (MWH) 11.

Net electrical energy generated (MWH) 623,121 823,121 15A65A97 _

12.

Reactor Service factor 94.7 94.7 74.9 13.

Reactor availability factor 94.7 94 7

. 654 14 Unit service factor 92.6 92 6 73.2

15. Unit availability factor 92.6 92 6 73 2 72 2 72 &

a2.1.

16. Unit capacity factor (Usine MDC)

. 72 2 72 2 -

621 :

17.

Unit capacity factor (Using Design MWe) l 74 7#

7#

18.

Ur:lt forced outage rate 19 ; Shutdowns scheduled ovor next 6 months (Type. Date, and Duration of each);

20.

If shutdown at end of report period, estimated date of startup:

21. Units in test status (prior to commerclal operation):

ACHEVED Commercial Operation 900813 Estimated I

l f[

L

..:.- -. - - -.. 2.-- - -.. -. -

J

=

. to TXX. 9xe5 Page 2 of 4 AVERAGE DAILY LNIT POWER LEVEL DOCKET NO:

' SO445 UNIT:

CPSGS 1 DATE:

February 11,1993 COMPLETED BY:

Janet Hughes TELEPFONE:

617+375331 MONTH: JANUARY 1993 DAY AVERAGE DAILYPOWER LEVEL CAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWo Net) 1 530 g7 1090 2

555 to 512 3

W 19 36-4 895 20 375 5

907 21 732 6

22 1071 7

909 23 12 8

12 24 513 9

1000 25 0

-10 1093 26 510 11 1091 27 930 12 1009 28 1074 13 1089 29 1066 14 1100 30 1000 15 1092 31 1095 16 BBS

+.

Attachment I to TXX 93086 Page 3 of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NOi W4 UNIT:

CPSES1 j

OATE:

February 11.1993 CCMPLETED BY:

Janet Hughes - ___

TELEPHONE:

8174874331 I

i l

MONTH: JANUARY 1993

)

i 0141 0000 Unit started rnonth in MODE 1, continuing ascent to full power following second rofueling '

l outage.

01r18

-1144 Reactor tripped due to intermediate Range (IR) Hgh Flus inadvenently unblocked while i

performing surveillanco lost. Unit entered MODE 3. LER 93 001 to be submitted.

01/19 0745 Unit entered MODE 2, 0822 Reactor is crtical.

128 Unit entered MODE 1.

1317 Synchronized to the gnd.

01/24 1112 Reactor tripped duo to pressurizer pressure transtnitter spiked low causing ono -

' ovenemperature N16 channol to trip white another chantwlwas in trip 1of surveillanco tostingi l

- Untt entered MODE 3; LER 93 002 to be submitted.

01/25 0530 Unit entered MODE 2.

0608 Reactor is craical.

1636 Unit entered MODE 1.

l 1862 Synchronized to the grid.

01/31 2400 Unt inded rnonth in MODE 1.

1 l

( ':'

. -.. ~.,... _

..._..,n.._

...,.; m ;, a.- _

t Attachtnent 1 to TXX-4Trn Page 4 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO-N UNIT:

CPSES1 DATE.

Fetuuary 11,1993 COMPLETEDBY:

M Hughes 1

m 817497 6 131 REPORT MONTH JANt;ARY 1993

)

wTHOooF TE SHUTTNGDOMe Ff0RCED DOHATE N TFEREACTOROR M1

.DATE SSCFEDULED N,

FEASO4 FEDUCNG POWEF1 CORRECTWEACTIOPGCOMMENTS l

1 930118 F

25 6 G

3 Interrnediale Range Q Fnsu Reactor trip

. I j

madvertenlly urtlocked at 100% RTP.

LER 93-00t to be submeted i

' 2 500124 F

29.7 A

3 Over Ter@erature N-16 Reactor trip due to pressurizer pressure transnailler +4 edlow.

LER 93-002 to be sutwnIIed.

1)-

FEASCN

2) N A EOUIPENTFAILUFE(EXPLAN)

E OPERATORTRANNG AND UCENSEEXAMNATION.

1: MANUAL i

B: MANTOR TEST '

P. ADWilSTRATWE 2-MANUALSCRAM

C: FEFUE1JNG G-OPERATIONALERROR(EXPUWN) 3: AUTOMATICSCRAM D: ' FEGLAATORYFESTHCTION H: OTFER(EXPLMN) 4: OT)ER(EXPUnJN) 4 t

4 r

4

~ - - -

ee mve n.

n n

p-n.,

r