Monthly Operating Rept for Jan 1993 for Comanche Peak Steam Electric Station Unit 1
ML20128L768
Person / Time
Site: Comanche Peak 
Issue date: 01/31/1993
From: Julie Hughes, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-93085, NUDOCS 9302190369
Download: ML20128L768 (5)


Text

F' U

'O A

log # TXX-93085 File # 10010.2 Ref. # 10CFR50.36

=

=

TUELECTRIC February 15, 1993

% i!!!am J. Cahlil, Jr.

Gwsp t h e f'rrudent U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) - UNIT 1 DOCKET NO. 50 445 MONTHLY OPERATING REPORT FOR JANUARY 1993 Gentlemen:

Attached is the Monthly Operating Report for January 1993 prepared and submitted pursuant to Technical Specification 6.9.1.5 contained in Appendix A to the Comanche Peak Ste,am Electric Station Unit 1 Operating License No. HPF-87.

Sincerely, William J. Cahill, Jr.

By:

D. R. Woodlan Docket Licensing Manager RC/rc Attachment c - Mr. J. L. Hilhoan, Region IV Hr. T. Reis, Region IV Resident inspectors, CPSES (2)

Mr. T.

A.

Bergman, NRR 220009 ggpit I

9302190369 930131

.m N. onve snect t n. 81 t w u.Te m 75 mt I

PDR ADOCK 0S000445 i

-R PDR.

c Mischmerit 1 t) TXX 93006

- Page 1 of 4 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCKET NO:

60 4 -

UNIT: -

CPSES1 DATE:

Februar/11,1993 COMPWTED BY:

- Janet Hughos.

TE2 PHONE:

817407 4331 OPERATING STATUS 1.

Reporting Period: JANUARY 1993 Gross hours in reporting porlod:

2M~

2.

Currently authorized power level (MWI):'

Mil Man. depend. capacity (MWe Net): 1150

  • Doston Electrical Rating (MWo. Net):

11.10 3.

Power level to which restricted (if any) (MWo Not):

NOME 4.

Reasons for restrictton (if any):

THIS MOMH -

YRTO DATE - CUMJt.ATIVE 5.

Number of hours reactor was critical MA MA 16,223 0L 0

2256.6 6.

Reactor reserve shutdown hours 8884 m

15.6474 7.

Hours generator on line 0

0.

0 8.

Unit reserve shutdown hours 1A 103-1.E.103 49245.930 9.

Gross thermal energy generated (MWH) 656A27

'050A27 16.291.592 L

10.

Gross electrical energy generated (MWH) 11.

Net electrical energy generated (MWH) 623,121 823,121 15A65A97 _

12.

Reactor Service factor 94.7 94.7 74.9 13.

Reactor availability factor 94.7 94 7

. 654 14 Unit service factor 92.6 92 6 73.2

15. Unit availability factor 92.6 92 6 73 2 72 2 72 &

a2.1.

16. Unit capacity factor (Usine MDC)

. 72 2 72 2 -

621 :

17.

Unit capacity factor (Using Design MWe) l 74 7#

7#

18.

Ur:lt forced outage rate 19 ; Shutdowns scheduled ovor next 6 months (Type. Date, and Duration of each);

20.

If shutdown at end of report period, estimated date of startup:

21. Units in test status (prior to commerclal operation):

ACHEVED Commercial Operation 900813 Estimated I

l f[

L

..:.- -. - - -.. 2.-- - -.. -. -

J

=

. to TXX. 9xe5 Page 2 of 4 AVERAGE DAILY LNIT POWER LEVEL DOCKET NO:

' SO445 UNIT:

CPSGS 1 DATE:

February 11,1993 COMPLETED BY:

Janet Hughes TELEPFONE:

617+375331 MONTH: JANUARY 1993 DAY AVERAGE DAILYPOWER LEVEL CAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWo Net) 1 530 g7 1090 2

555 to 512 3

W 19 36-4 895 20 375 5

907 21 732 6

22 1071 7

909 23 12 8

12 24 513 9

1000 25 0

-10 1093 26 510 11 1091 27 930 12 1009 28 1074 13 1089 29 1066 14 1100 30 1000 15 1092 31 1095 16 BBS

+.

Attachment I to TXX 93086 Page 3 of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NOi W4 UNIT:

CPSES1 j

OATE:

February 11.1993 CCMPLETED BY:

Janet Hughes - ___

TELEPHONE:

8174874331 I

i l

MONTH: JANUARY 1993

)

i 0141 0000 Unit started rnonth in MODE 1, continuing ascent to full power following second rofueling '

l outage.

01r18

-1144 Reactor tripped due to intermediate Range (IR) Hgh Flus inadvenently unblocked while i

performing surveillanco lost. Unit entered MODE 3. LER 93 001 to be submitted.

01/19 0745 Unit entered MODE 2, 0822 Reactor is crtical.

128 Unit entered MODE 1.

1317 Synchronized to the gnd.

01/24 1112 Reactor tripped duo to pressurizer pressure transtnitter spiked low causing ono -

' ovenemperature N16 channol to trip white another chantwlwas in trip 1of surveillanco tostingi l

- Untt entered MODE 3; LER 93 002 to be submitted.

01/25 0530 Unit entered MODE 2.

0608 Reactor is craical.

1636 Unit entered MODE 1.

l 1862 Synchronized to the grid.

01/31 2400 Unt inded rnonth in MODE 1.

1 l

( ':'

. -.. ~.,... _

..._..,n.._

...,.; m ;, a.- _

t Attachtnent 1 to TXX-4Trn Page 4 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO-N UNIT:

CPSES1 DATE.

Fetuuary 11,1993 COMPLETEDBY:

M Hughes 1

m 817497 6 131 REPORT MONTH JANt;ARY 1993

)

wTHOooF TE SHUTTNGDOMe Ff0RCED DOHATE N TFEREACTOROR M1

.DATE SSCFEDULED N,

FEASO4 FEDUCNG POWEF1 CORRECTWEACTIOPGCOMMENTS l

1 930118 F

25 6 G

3 Interrnediale Range Q Fnsu Reactor trip

. I j

madvertenlly urtlocked at 100% RTP.

LER 93-00t to be submeted i

' 2 500124 F

29.7 A

3 Over Ter@erature N-16 Reactor trip due to pressurizer pressure transnailler +4 edlow.

LER 93-002 to be sutwnIIed.

1)-

FEASCN

2) N A EOUIPENTFAILUFE(EXPLAN)

E OPERATORTRANNG AND UCENSEEXAMNATION.

1: MANUAL i

B: MANTOR TEST '

P. ADWilSTRATWE 2-MANUALSCRAM

C: FEFUE1JNG G-OPERATIONALERROR(EXPUWN) 3: AUTOMATICSCRAM D: ' FEGLAATORYFESTHCTION H: OTFER(EXPLMN) 4: OT)ER(EXPUnJN) 4 t