| Title = Fowards LER 96-046-00.Licensee Commitments Listed,Including Containment Fuel Drop Radiation Monitor Design Reviewed & TS Change Request Will Be Submitted to NRC for Approval
| Title = Fowards LER 96-046-00.Licensee Commitments Listed,Including Containment Fuel Drop Radiation Monitor Design Reviewed & TS Change Request Will Be Submitted to NRC for Approval
| Plant =  
| Plant =  
| Reporting criterion =  
| Reporting criterion = 10 CFR 50.73(a)(2)(v), 10 CFR 50.73(a)(2)
| Power level =  
| Power level =  
| Mode =  
| Mode =  
| Docket = 05000423
| Docket = 05000423
| LER year = 2096
| LER year = 1996
| LER number = 46
| LER number = 46
| LER revision =  
| LER revision = 0
| Event date =  
| Event date =  
| Report date =  
| Report date =  
Line 34: Line 34:


=text=
=text=
{{#Wiki_filter:'        '
{{#Wiki_filter:'
wila=>, orrm . mye rerry mi., warrera cr "g$) Northeast Utilities System                                       p.o. m,,128                             )
"g$) Northeast wila=>, orrm. mye rerry mi., warrera cr Utilities System p.o. m,,128 Waterfore, CT 06360128 (203) 447-1791 December 6,1996 Docket No. 50-423 B16027 Re:10CFR 50.73(a)(2)(v)(C) 10CFR 50.73(a)(2)(v)(D)
Waterfore, CT 06360128 (203) 447-1791 December 6,1996 Docket No. 50-423 B16027 Re:10CFR 50.73(a)(2)(v)(C) 10CFR 50.73(a)(2)(v)(D)
U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 96-046-00 Submitted Pursuant to i
U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 96-046-00                                             l Submitted Pursuant to                                                 i 10CFR 50.73(a)(2)M(C) and 10CFR 50.73(a)(2)(v)(d)                                     l This letter forwards Licensee Event Report 96-046-00, documenting a condition that was determined at Millstone Unit No. 3 on November 8,1996. This LER is submitted pursuant to 10CFR 50.73(a)(2)(v)(C) and 10CFR 50.73(a)(2)(v)(D).
10CFR 50.73(a)(2)M(C) and 10CFR 50.73(a)(2)(v)(d)
NNECO's commitments in response to this event are contained within                                   i Attachment 1 to this letter.
This letter forwards Licensee Event Report 96-046-00, documenting a condition that was determined at Millstone Unit No. 3 on November 8,1996. This LER is submitted pursuant to 10CFR 50.73(a)(2)(v)(C) and 10CFR 50.73(a)(2)(v)(D).
NNECO's commitments in response to this event are contained within i to this letter.
Should you have any questions regarding this tubmittal, please contact Mr.
Should you have any questions regarding this tubmittal, please contact Mr.
James M. Peschel at (860) 437-5840.
James M. Peschel at (860) 437-5840.
I l
I l
h b}
Very truly yours, b}
4 Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY 160103
4 h
                                                    /?f M,n syt'ners M
NORTHEAST NUCLEAR ENERGY COMPANY
                                                                    /
/?f /
                                            .dnit Director, Milfst6ne Unit No. 3 9612170406 961206 PDR     ADOCK 05000423 S                   PDR
160103 M,n syt'ners M
.dnit Director, Milfst6ne Unit No. 3 9612170406 961206 PDR ADOCK 05000423 S
PDR


  .  ', U.S. Nucinr Regul* tory Commission B16027\Page 2
U.S. Nucinr Regul* tory Commission B16027\\Page 2 Attachment: 1)
NNECO's commitments in response to LER 96-046-00 2)
LER 96-046-00 cc:
H. J.
Miller, Region i Administrator A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 V.L.
Rooney, NRC Project Manager, Millstone Unit No. 3 W. D. Travers, Dr., Director, Special Projects i
i 1
)


==Attachment:==
. =..
: 1)      NNECO's commitments in response to LER 96-046-00
j Docket No. 50-423 i
: 2)      LER 96-046-00 cc:  H. J. Miller, Region i Administrator A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 V.L. Rooney, NRC Project Manager, Millstone Unit No. 3 W. D. Travers, Dr., Director, Special Projects                      i i
B16027 i
l l
1
                                                                                    )
 
    ..-          - . . -- ..-      .    -    -                  - - . . . . --    -      . = . . . . . -
;.          .                                                                                                j
$                                                                                Docket No. 50-423             i
;                                                                                          B16027 i
i
i
                                                                                                              .4 t                                                                                                             i l
.4 t
                                                                                                            .)
i l.)
i i
i i
]
]
j                                           Attachment 1 i
j i
Millstone Nuclear Power Station, Unit No. 3                                       l t                                       NNECO's Commitments                                                     '
Millstone Nuclear Power Station, Unit No. 3 t
j                                          in Response To 1                                         (LER 96-046-00) j J
NNECO's Commitments j
in Response To 1
(LER 96-046-00) j J
a 1
a 1
December 6,1996
December 6,1996


s
,s I
.            .                                                                            I                           !
j-U.S. Nucl:cr Regulatory Commission i
j-             .
i.
U.S. Nucl:cr Regulatory Commission                                                                 i
B16027\\ Attachment 1\\Page 2 i
: i.                 B16027\ Attachment 1\Page 2                                                                       .
i Enclosure l
i                                                                                                                     i
List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.
:                                                                                Enclosure List of Regulatory Commitments l,
Any other actions discussed-in the submittal represent intended or planned actions by NNECO.
:'                  The following table identifies those actions committed to by NNECO in this document. Any other actions discussed-in the submittal represent intended or planned actions by NNECO. They are described to the NRC for the 'NRC's                             -
They are described to the NRC for the 'NRC's information and are not regulatory commitments. ~ Please notify the Manager -
!                  information and are not regulatory commitments. ~ Please notify the Manager -                     i i                   Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions               !
i i
!-                  regarding this document or any associated regulatory commitments.
Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.
(l l                                                 -                                                                  i 3
(l l
Number                                         Commitment                   Due             ;
i 3
7 B16027-01           The Containment Fuel Drop Radiation                     May 1,1997           j
Number
:                                      Monitor design will be reviewed. Based                                         !
 
!                                      on this review the design of the monitor                                       j
==Commitment==
,                                      will be modified or a Technical                                               l Specification change request will be                                         '
Due B16027-01 The Containment Fuel Drop Radiation May 1,1997 j
submitted to the NRC for approval.
7 Monitor design will be reviewed. Based on this review the design of the monitor j
B16027-02           As part of the ongoing FSAR design                     Prior to entry into review, the response time data for safety                 mode 4             i related non-Engineered Safety Features                                       j (ESF) actuations which support FSAR                                           {
will be modified or a Technical l
chapter 15 analysis will be reviewed to                                         i verify that the data is supported by                                           l surveillance procedures. Applicable                                           I surveillance procedures will be updated as necessary.
Specification change request will be submitted to the NRC for approval.
816027-03           As part of the ongoing FSAR review,                       1/31/97 applicable sections of the FSAR will be revised to accurately reflect the isolation time of the Containment Purge Isolation valves
B16027-02 As part of the ongoing FSAR design Prior to entry into review, the response time data for safety mode 4 i
related non-Engineered Safety Features j
(ESF) actuations which support FSAR
{
chapter 15 analysis will be reviewed to i
verify that the data is supported by surveillance procedures. Applicable I
surveillance procedures will be updated as necessary.
816027-03 As part of the ongoing FSAR review, 1/31/97 applicable sections of the FSAR will be revised to accurately reflect the isolation time of the Containment Purge Isolation valves
((3HVU*CTV32A/B and 3HVU*CTV33A/B).
((3HVU*CTV32A/B and 3HVU*CTV33A/B).
B16027-04           Coordinated with the ongoing FSAR                         2/28/97 review, Section 3.2.2 of the Technical                                         j Requirements Manual (TRM) will be revised to accurately reflect the response time of the Containment Purge Exhaust and Supply Valves radiation monitors.
B16027-04 Coordinated with the ongoing FSAR 2/28/97 review, Section 3.2.2 of the Technical j
Requirements Manual (TRM) will be revised to accurately reflect the response time of the Containment Purge Exhaust and Supply Valves radiation monitors.
l
l
                                                                                                                        ,
}}
}}


{{LER-Nav}}
{{LER-Nav}}

Latest revision as of 11:20, 12 December 2024

Fowards LER 96-046-00.Licensee Commitments Listed,Including Containment Fuel Drop Radiation Monitor Design Reviewed & TS Change Request Will Be Submitted to NRC for Approval
ML20132B814
Person / Time
Site: Millstone 
Issue date: 12/06/1996
From: Brothers M
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20132B817 List:
References
B16027, NUDOCS 9612170406
Download: ML20132B814 (4)


LER-1996-046, Fowards LER 96-046-00.Licensee Commitments Listed,Including Containment Fuel Drop Radiation Monitor Design Reviewed & TS Change Request Will Be Submitted to NRC for Approval
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(v), Loss of Safety Function

10 CFR 50.73(a)(2)
4231996046R00 - NRC Website

text

'

"g$) Northeast wila=>, orrm. mye rerry mi., warrera cr Utilities System p.o. m,,128 Waterfore, CT 06360128 (203) 447-1791 December 6,1996 Docket No. 50-423 B16027 Re:10CFR 50.73(a)(2)(v)(C) 10CFR 50.73(a)(2)(v)(D)

U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 96-046-00 Submitted Pursuant to i

10CFR 50.73(a)(2)M(C) and 10CFR 50.73(a)(2)(v)(d)

This letter forwards Licensee Event Report 96-046-00, documenting a condition that was determined at Millstone Unit No. 3 on November 8,1996. This LER is submitted pursuant to 10CFR 50.73(a)(2)(v)(C) and 10CFR 50.73(a)(2)(v)(D).

NNECO's commitments in response to this event are contained within i to this letter.

Should you have any questions regarding this tubmittal, please contact Mr.

James M. Peschel at (860) 437-5840.

I l

Very truly yours, b}

4 h

NORTHEAST NUCLEAR ENERGY COMPANY

/?f /

160103 M,n syt'ners M

.dnit Director, Milfst6ne Unit No. 3 9612170406 961206 PDR ADOCK 05000423 S

PDR

U.S. Nucinr Regul* tory Commission B16027\\Page 2 Attachment: 1)

NNECO's commitments in response to LER 96-046-00 2)

LER 96-046-00 cc:

H. J.

Miller, Region i Administrator A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 V.L.

Rooney, NRC Project Manager, Millstone Unit No. 3 W. D. Travers, Dr., Director, Special Projects i

i 1

)

. =..

j Docket No. 50-423 i

B16027 i

i

.4 t

i l.)

i i

]

j i

Millstone Nuclear Power Station, Unit No. 3 t

NNECO's Commitments j

in Response To 1

(LER 96-046-00) j J

a 1

December 6,1996

,s I

j-U.S. Nucl:cr Regulatory Commission i

i.

B16027\\ Attachment 1\\Page 2 i

i Enclosure l

List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.

Any other actions discussed-in the submittal represent intended or planned actions by NNECO.

They are described to the NRC for the 'NRC's information and are not regulatory commitments. ~ Please notify the Manager -

i i

Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.

(l l

i 3

Number

Commitment

Due B16027-01 The Containment Fuel Drop Radiation May 1,1997 j

7 Monitor design will be reviewed. Based on this review the design of the monitor j

will be modified or a Technical l

Specification change request will be submitted to the NRC for approval.

B16027-02 As part of the ongoing FSAR design Prior to entry into review, the response time data for safety mode 4 i

related non-Engineered Safety Features j

(ESF) actuations which support FSAR

{

chapter 15 analysis will be reviewed to i

verify that the data is supported by surveillance procedures. Applicable I

surveillance procedures will be updated as necessary.

816027-03 As part of the ongoing FSAR review, 1/31/97 applicable sections of the FSAR will be revised to accurately reflect the isolation time of the Containment Purge Isolation valves

((3HVU*CTV32A/B and 3HVU*CTV33A/B).

B16027-04 Coordinated with the ongoing FSAR 2/28/97 review, Section 3.2.2 of the Technical j

Requirements Manual (TRM) will be revised to accurately reflect the response time of the Containment Purge Exhaust and Supply Valves radiation monitors.

l