W3P85-1431, Forwards Change to Initial Test Program,Consisting of marked-up Page 14.2-142 (Amend 15) to FSAR Re Turbine Trip, Per 10CFR50.59(b).Change Clarifies When Turbine Trip Test Performed.No Tech Spec Change Involved: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:P LoulSIANA         4 9 oe - o~oe ra. r . no .ox.oo.
{{#Wiki_filter:P LoulSIANA 2 O W E R & L 1 G H T / NEW ORLEANS LOUISIANA 4 9 oe - o~oe ra. r. no.ox.oo.
2 O W E R & L 1 G H T / NEW ORLEANS          LOUISIANA 70174-800G   G (504)386-9345 MIDDLE SDUTH UTluTIES SYSTEM July 29, 1985                     W3P85-1431 A4.05 Director of Nuc1 car Reactor Regulation Attention: Mr. G. W. Knighton, Chief Licensing Branch No. 3 Division of Licensing U.3. Nuclear Regulatory Commission Washington, D.C. 20555
70174-800G G (504)386-9345 MIDDLE SDUTH UTluTIES SYSTEM July 29, 1985 W3P85-1431 A4.05 Director of Nuc1 car Reactor Regulation Attention:
Mr. G. W. Knighton, Chief Licensing Branch No. 3 Division of Licensing U.3. Nuclear Regulatory Commission Washington, D.C. 20555


==Dear Mr. Knighton:==
==Dear Mr. Knighton:==
==Subject:==
==Subject:==
Waterford 3 SES Docket No. 50-382 License No. NPF-38 INITIAL TEST PROGRAM
Waterford 3 SES Docket No. 50-382 License No. NPF-38 INITIAL TEST PROGRAM
Line 26: Line 26:
==Reference:==
==Reference:==
Waterford 3 FSAR, Chapter 14 This submittal is made in accordance with 10CFR50.59(b) and the license condition in Section 2.C.10 of the subject license. Reported herewith is a change made to the Waterford 3 Initial Test Program, as described in reference 1, as amended through Amendment No. 36 The attached marked-up page 14.2-142 (Amendment 15) of the Waterford 3 FSAR reficcts the changes made in test subsection 14.2.12.3.37, Turbine Trip.
Waterford 3 FSAR, Chapter 14 This submittal is made in accordance with 10CFR50.59(b) and the license condition in Section 2.C.10 of the subject license. Reported herewith is a change made to the Waterford 3 Initial Test Program, as described in reference 1, as amended through Amendment No. 36 The attached marked-up page 14.2-142 (Amendment 15) of the Waterford 3 FSAR reficcts the changes made in test subsection 14.2.12.3.37, Turbine Trip.
The change indicated is a clarification of when the test will be performed, i.e., to allow the turbine trip test to be conducted at a lower power level. This change to the initial test program does not involve a change in the license technical specifications or an unreviewed safety question.
The change indicated is a clarification of when the test will be performed, i.e.,
to allow the turbine trip test to be conducted at a lower power level. This change to the initial test program does not involve a change in the license technical specifications or an unreviewed safety question.
LP&L has conducted and documented the required 10CFR50.59 safety evaluation.
LP&L has conducted and documented the required 10CFR50.59 safety evaluation.
LP&L will provide the FSAR change in accordance with 10CFR50.71(e) requirements. The original plus 39 copies of this report transmittal are provided in accordance with 10CFR50.59(b).
LP&L will provide the FSAR change in accordance with 10CFR50.71(e) requirements. The original plus 39 copies of this report transmittal are provided in accordance with 10CFR50.59(b).
Very truly yours, 8507310002 850729 hDR ADOCK 0500             2             K.W. Cook Nuclear Support & Licensing Manager KWC:GEW:sas Attachment cc:     R.D. Martin, D.M. Crutchfield, J.H. Wilson, NRC Resident Inspectors Office, INPO Records Center (J.T. Wheelock), B.W. Churchill, W.M. Stevenson
Very truly yours, 8507310002 850729 hDR ADOCK 0500 2
                                                                                                !s
K.W. Cook Nuclear Support & Licensing Manager KWC:GEW:sas Attachment cc:
R.D. Martin, D.M. Crutchfield, J.H. Wilson, NRC Resident Inspectors Office, INPO Records Center (J.T. Wheelock), B.W. Churchill, W.M. Stevenson
!s


lA/ W S O /YS{           l WSES-FSAR-UNIT 3                                   -
lA/ W S O /YS{
y'             14.2.12.3.37         TURLINE TRIP                                                     15
l WSES-FSAR-UNIT 3 y'
    ,            14.2.12.3.37.1         Objective To demonstrate that the plant responds and can be controlled as designed following a turbine trip at 100 percent power. #                                 l   8 14.2.12.3.37.2         Prerequisites A.       The plant is operating at or near 100 percent power.
14.2.12.3.37 TURLINE TRIP 15 14.2.12.3.37.1 Objective To demonstrate that the plant responds and can be controlled as designed following a turbine trip at 100 percent power. #
D.       The Reactor Regulating System (RRS), Feedwater Control System (FWCS), Steam Bypass Control System (SBCS), and the                   15 Pressurizer Level and Pressure Control System are in operation.
l 8
14.2.12.3.37.3         Test tiethod 8
14.2.12.3.37.2 Prerequisites A.
A.       Manually trip the turbinc.
The plant is operating at or near 100 percent power.
E.       Monitor plant behavior continuously during the resultant transient to ensure that the RRS, FWCS, SBCS, and Pressurizer Pressure and Level Control System properly control the plant                 15 following a turbine trip.
D.
14.2.12.3.37.4       Acceptance Criteria 8
The Reactor Regulating System (RRS), Feedwater Control System (FWCS), Steam Bypass Control System (SBCS), and the 15 Pressurizer Level and Pressure Control System are in operation.
4 The plant control systems and operetor actions satisfactorily control
14.2.12.3.37.3 Test tiethod 8
      --          a turbine trip at 100 percent power.
A.
M                             h
Manually trip the turbinc.
                      $      L J- g                           -
E.
                                                                            # V
Monitor plant behavior continuously during the resultant transient to ensure that the RRS, FWCS, SBCS, and Pressurizer Pressure and Level Control System properly control the plant 15 following a turbine trip.
                          })nsk &            Y /06 h *@MhN x ga c                                   & @ 4 M g M g h d Te d y                             i asp.                                                                           '
14.2.12.3.37.4 Acceptance Criteria 8
The plant control systems and operetor actions satisfactorily control 4
a turbine trip at 100 percent power.
L M
h
# V J-g Y /06 h *@MhN
})nsk &
x ga c
& @ 4 M
g M g h d Te d y i
asp.
LP&L W-3 RECORDS UNCONTROL_ED COPY
LP&L W-3 RECORDS UNCONTROL_ED COPY
                                                                                              ~
~
f '
f CO NOT USE !N e NY SAFE 1 Y.-RELATED TEST!NG.
* CO NOT USE !N e NY SAFE 1 Y.-RELATED TEST!NG.                       '
*dAINTEN ANCd. OF. O.cE;tATiCNAL ACTIVITY 14.2-142 Amendment No. 15, (2/81)
                                *dAINTEN ANCd. OF. O.cE;tATiCNAL ACTIVITY 14.2-142       Amendment No. 15, (2/81)
, -..}}
                                                                                                    ,    , - . .}}

Latest revision as of 10:07, 12 December 2024

Forwards Change to Initial Test Program,Consisting of marked-up Page 14.2-142 (Amend 15) to FSAR Re Turbine Trip, Per 10CFR50.59(b).Change Clarifies When Turbine Trip Test Performed.No Tech Spec Change Involved
ML20132C805
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/29/1985
From: Cook K
LOUISIANA POWER & LIGHT CO.
To: Knighton G
Office of Nuclear Reactor Regulation
References
W3P85-1431, NUDOCS 8507310002
Download: ML20132C805 (2)


Text

P LoulSIANA 2 O W E R & L 1 G H T / NEW ORLEANS LOUISIANA 4 9 oe - o~oe ra. r. no.ox.oo.

70174-800G G (504)386-9345 MIDDLE SDUTH UTluTIES SYSTEM July 29, 1985 W3P85-1431 A4.05 Director of Nuc1 car Reactor Regulation Attention:

Mr. G. W. Knighton, Chief Licensing Branch No. 3 Division of Licensing U.3. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Knighton:

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 INITIAL TEST PROGRAM

Reference:

Waterford 3 FSAR, Chapter 14 This submittal is made in accordance with 10CFR50.59(b) and the license condition in Section 2.C.10 of the subject license. Reported herewith is a change made to the Waterford 3 Initial Test Program, as described in reference 1, as amended through Amendment No. 36 The attached marked-up page 14.2-142 (Amendment 15) of the Waterford 3 FSAR reficcts the changes made in test subsection 14.2.12.3.37, Turbine Trip.

The change indicated is a clarification of when the test will be performed, i.e.,

to allow the turbine trip test to be conducted at a lower power level. This change to the initial test program does not involve a change in the license technical specifications or an unreviewed safety question.

LP&L has conducted and documented the required 10CFR50.59 safety evaluation.

LP&L will provide the FSAR change in accordance with 10CFR50.71(e) requirements. The original plus 39 copies of this report transmittal are provided in accordance with 10CFR50.59(b).

Very truly yours, 8507310002 850729 hDR ADOCK 0500 2

K.W. Cook Nuclear Support & Licensing Manager KWC:GEW:sas Attachment cc:

R.D. Martin, D.M. Crutchfield, J.H. Wilson, NRC Resident Inspectors Office, INPO Records Center (J.T. Wheelock), B.W. Churchill, W.M. Stevenson

!s

lA/ W S O /YS{

l WSES-FSAR-UNIT 3 y'

14.2.12.3.37 TURLINE TRIP 15 14.2.12.3.37.1 Objective To demonstrate that the plant responds and can be controlled as designed following a turbine trip at 100 percent power. #

l 8

14.2.12.3.37.2 Prerequisites A.

The plant is operating at or near 100 percent power.

D.

The Reactor Regulating System (RRS), Feedwater Control System (FWCS), Steam Bypass Control System (SBCS), and the 15 Pressurizer Level and Pressure Control System are in operation.

14.2.12.3.37.3 Test tiethod 8

A.

Manually trip the turbinc.

E.

Monitor plant behavior continuously during the resultant transient to ensure that the RRS, FWCS, SBCS, and Pressurizer Pressure and Level Control System properly control the plant 15 following a turbine trip.

14.2.12.3.37.4 Acceptance Criteria 8

The plant control systems and operetor actions satisfactorily control 4

a turbine trip at 100 percent power.

L M

h

  1. V J-g Y /06 h *@MhN

})nsk &

x ga c

& @ 4 M

g M g h d Te d y i

asp.

LP&L W-3 RECORDS UNCONTROL_ED COPY

~

f CO NOT USE !N e NY SAFE 1 Y.-RELATED TEST!NG.

  • dAINTEN ANCd. OF. O.cE;tATiCNAL ACTIVITY 14.2-142 Amendment No. 15, (2/81)

, -..