{{#Wiki_filter:.. ,
{{#Wiki_filter:..
                                            JUL 16 685
,
      Docket No. 50-409
JUL 16 685
      Dairyland Power Cooperative
Docket No. 50-409
  -ATTN:     Mr. F. W. Linder
Dairyland Power Cooperative
              General Manager
-ATTN:
      2615 East Avenue - South
Mr. F. W. Linder
      La Crosse, WI 54601
General Manager
      Gentlemen:
2615 East Avenue - South
      This refers to the routine safety inspection conducted by Mr. W. Snell and
La Crosse, WI 54601
      others of this office on June 24-26, 1985 of activities at the La Crosse Boiling
Gentlemen:
    Water Reactor authorized by NRC Operating Licenses No. DPR-45 and to the
This refers to the routine safety inspection conducted by Mr. W. Snell and
      discussion of our findings with Messrs. J. Parkyn, T. Steele and others of
others of this office on June 24-26, 1985 of activities at the La Crosse Boiling
    your staff at the conclusion of the inspection.
Water Reactor authorized by NRC Operating Licenses No. DPR-45 and to the
      The enclosed copy of our inspection report identifies areas examined during
discussion of our findings with Messrs. J. Parkyn, T. Steele and others of
      the inspection. Within these areas, the inspection consisted of a selective-
your staff at the conclusion of the inspection.
      examination of procedures and representative records, observations, and
The enclosed copy of our inspection report identifies areas examined during
      interviews with personnel.
the inspection. Within these areas, the inspection consisted of a selective-
      No items of noncompliance with NRC requirements were identified during the
examination of procedures and representative records, observations, and
      course of this inspection.
interviews with personnel.
      However, weaknesses were identified which will need corrective action by your
No items of noncompliance with NRC requirements were identified during the
      staff.   These weaknesses are summarized in the attached Appendix to this
course of this inspection.
      letter.   As required by 10 CFR Part 50, Appendix E, IV.F, any weaknesses that
However, weaknesses were identified which will need corrective action by your
      are identified must be corrected.
staff.
      We will gladly discuss any questions you have concerning this inspection.
These weaknesses are summarized in the attached Appendix to this
                                              Sincerely,
letter.
                                              -/22;29~+
As required by 10 CFR Part 50, Appendix E, IV.F, any weaknesses that
                                              C. J. Paperiello, Chief
are identified must be corrected.
                                              Emergency Preparedness and
We will gladly discuss any questions you have concerning this inspection.
                                                Radiological Protection Branch
Sincerely,
      Enclosures:
-/22;29~+
      1. Appendix, Exercise                                           /
C. J. Paperiello, Chief
            Weaknesses
Emergency Preparedness and
      2.   Inspection Report
Radiological Protection Branch
            No. 50-409/85008(DRSS)
Enclosures:
                                                              /[
1.
                                                              h
Appendix, Exercise
      See Attached List For Distribution
/
              8508020008 850716
Weaknesses
              PDR
2.
              G      ADOCK 05000409
Inspection Report
                                PDR
/[
                                                                          _
No. 50-409/85008(DRSS)
h
See Attached List For Distribution
8508020008 850716
PDR
ADOCK 05000409
G
PDR
_


o ,
o
    Dairyland Power Cooperative           2
,
                                              JUL 1 61985
Dairyland Power Cooperative
    Distribution
2
    cc w/ enclosures:
JUL 1 61985
    J. Parkyn, Plant Superintendent
Distribution
    DMB/ Document Control Desk (RIDS)
cc w/ enclosures:
    Resident Inspector, RIII
J. Parkyn, Plant Superintendent
    John J. Duffy, Chief
DMB/ Document Control Desk (RIDS)
      Boiler Section
Resident Inspector, RIII
    Ness Flores, Chairperson
John J. Duffy, Chief
      Wisconsin Public Service
Boiler Section
      Cosaission
Ness Flores, Chairperson
    Spark Burmaster, Coulee
Wisconsin Public Service
      Region Energy Coalition
Cosaission
    W. Weaver, FEMA, Region V
Spark Burmaster, Coulee
    D. Matthews, EPB, OIE
Region Energy Coalition
  NIII             RIII                   RIIIj   R
W. Weaver, FEMA, Region V
                                                            [
D. Matthews, EPB, OIE
  M1/,g           M1Cen           Shi 1,s   Be d     1   les1.
NIII
    07/11/85
RIII
RIIIj
R
[
M1/,g
M1Cen
Shi
1,s
Be d
1
les1.
07/11/85


                                    .-_ _               _ _ _                   . - -
.-_ _
  '
_ _ _
    .
. - -
                                          APPENDIX
'
                                  EXERCISE WEAKNESSES
.
      1. Initial notifications to the offsite agencies for the Alert and Site
APPENDIX
        Area Emergency classifications took longer than the 15 minutes specified
EXERCISE WEAKNESSES
        in 10 CFR Part 50, Appendix E, IV.D.3. (0 pen Item No. 409/85008-01)
1.
        (Section 4.a)
Initial notifications to the offsite agencies for the Alert and Site
      2. The content of the initial notification to the offsite agencies for the
Area Emergency classifications took longer than the 15 minutes specified
        Site Area Emergency did not state whether a release was in progress as
in 10 CFR Part 50, Appendix E, IV.D.3.
        required by the LACBWR Emergency Plan. (0 pen Item No. 409/85008-02)
(0 pen Item No. 409/85008-01)
        (Section 4.a)
(Section 4.a)
2.
The content of the initial notification to the offsite agencies for the
Site Area Emergency did not state whether a release was in progress as
required by the LACBWR Emergency Plan.
(0 pen Item No. 409/85008-02)
(Section 4.a)
l
l
l
l
}}
}}

Latest revision as of 09:47, 12 December 2024

Forwards Insp Rept 50-409/85-08 on 850624-26.No Noncompliance Noted.Weakness Identified Which Will Need Corrective Action by Util.Weakness Summarized in Encl App
ML20132E511
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 07/16/1985
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Linder F
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20132E515 List:
References
NUDOCS 8508020008
Download: ML20132E511 (3)


See also: IR 05000409/1985008

Text

..

,

JUL 16 685

Docket No. 50-409

Dairyland Power Cooperative

-ATTN:

Mr. F. W. Linder

General Manager

2615 East Avenue - South

La Crosse, WI 54601

Gentlemen:

This refers to the routine safety inspection conducted by Mr. W. Snell and

others of this office on June 24-26, 1985 of activities at the La Crosse Boiling

Water Reactor authorized by NRC Operating Licenses No. DPR-45 and to the

discussion of our findings with Messrs. J. Parkyn, T. Steele and others of

your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective-

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

However, weaknesses were identified which will need corrective action by your

staff.

These weaknesses are summarized in the attached Appendix to this

letter.

As required by 10 CFR Part 50, Appendix E, IV.F, any weaknesses that

are identified must be corrected.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

-/22;29~+

C. J. Paperiello, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosures:

1.

Appendix, Exercise

/

Weaknesses

2.

Inspection Report

/[

No. 50-409/85008(DRSS)

h

See Attached List For Distribution

8508020008 850716

PDR

ADOCK 05000409

G

PDR

_

o

,

Dairyland Power Cooperative

2

JUL 1 61985

Distribution

cc w/ enclosures:

J. Parkyn, Plant Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Section

Ness Flores, Chairperson

Wisconsin Public Service

Cosaission

Spark Burmaster, Coulee

Region Energy Coalition

W. Weaver, FEMA, Region V

D. Matthews, EPB, OIE

NIII

RIII

RIIIj

R

[

M1/,g

M1Cen

Shi

1,s

Be d

1

les1.

07/11/85

.-_ _

_ _ _

. - -

'

.

APPENDIX

EXERCISE WEAKNESSES

1.

Initial notifications to the offsite agencies for the Alert and Site

Area Emergency classifications took longer than the 15 minutes specified

in 10 CFR Part 50, Appendix E, IV.D.3.

(0 pen Item No. 409/85008-01)

(Section 4.a)

2.

The content of the initial notification to the offsite agencies for the

Site Area Emergency did not state whether a release was in progress as

required by the LACBWR Emergency Plan.

(0 pen Item No. 409/85008-02)

(Section 4.a)