ENS 47110: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 07/30/2011 10:55 EDT | | event date = 07/30/2011 10:55 EDT | ||
| last update date = 07/30/2011 | | last update date = 07/30/2011 | ||
| title = Technical Support Center Hvac Out | | title = Technical Support Center Hvac Out of Service | ||
| event text = Due to unsatisfactory performance of TSC HVAC operation, the system is removed from service for corrective maintenance under Operating Permit 1�OP-11-1X75-00211. | | event text = Due to unsatisfactory performance of TSC HVAC operation, the system is removed from service for corrective maintenance under Operating Permit 1�OP-11-1X75-00211. | ||
The TSC HVAC is considered non-functional during the performance of this corrective work activity. If an emergency condition occurs during the time these work activities are being performed, which requires activation of the TSC, the contingency plan calls for utilization of the TSC, as long as radiological conditions allow for habitability of the facility. Procedure 73EP-EIP-063-0, Technical Support Center Activation, provides instructions to direct TSC management to the Control Room and TSC support personnel to the Simulator Building to continue TSC activities if it is necessary to relocate from the primary TSC so that TSC functions can be continued. | The TSC HVAC is considered non-functional during the performance of this corrective work activity. If an emergency condition occurs during the time these work activities are being performed, which requires activation of the TSC, the contingency plan calls for utilization of the TSC, as long as radiological conditions allow for habitability of the facility. Procedure 73EP-EIP-063-0, Technical Support Center Activation, provides instructions to direct TSC management to the Control Room and TSC support personnel to the Simulator Building to continue TSC activities if it is necessary to relocate from the primary TSC so that TSC functions can be continued. |
Latest revision as of 21:06, 1 March 2018
Where | |
---|---|
Hatch Georgia (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-3.83 h-0.16 days <br />-0.0228 weeks <br />-0.00525 months <br />) | |
Opened: | Kenny Hunter 11:05 Jul 30, 2011 |
NRC Officer: | Joe O'Hara |
Last Updated: | Jul 30, 2011 |
47110 - NRC Website
| |