ENS 47746: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 03/15/2012 08:30 EDT | | event date = 03/15/2012 08:30 EDT | ||
| last update date = 03/15/2012 | | last update date = 03/15/2012 | ||
| title = Technical Support Center Out | | title = Technical Support Center Out of Service Due to Planned Maintenance | ||
| event text = A planned maintenance evolution at the Oyster Creek Nuclear Generating Station will remove the Technical Support Center (TSC) ventilation system from service. Therefore, the TSC ventilation system will be rendered non-functional during the course of the work activities. The TSC ventilation is expected to be out of service for approximately six hours from 0800 [EDT] to 1400 today. | | event text = A planned maintenance evolution at the Oyster Creek Nuclear Generating Station will remove the Technical Support Center (TSC) ventilation system from service. Therefore, the TSC ventilation system will be rendered non-functional during the course of the work activities. The TSC ventilation is expected to be out of service for approximately six hours from 0800 [EDT] to 1400 today. | ||
If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures unless the TSC becomes uninhabitable due to ambient temperature, radiological, or other conditions. If relocation of the TSC becomes necessary, the Emergency Director will relocate the TSC staff to an alternate location in accordance with applicable site procedures. | If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures unless the TSC becomes uninhabitable due to ambient temperature, radiological, or other conditions. If relocation of the TSC becomes necessary, the Emergency Director will relocate the TSC staff to an alternate location in accordance with applicable site procedures. |
Latest revision as of 21:04, 1 March 2018
Where | |
---|---|
Oyster Creek New Jersey (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-3.97 h-0.165 days <br />-0.0236 weeks <br />-0.00544 months <br />) | |
Opened: | John Clark 08:32 Mar 15, 2012 |
NRC Officer: | Vince Klco |
Last Updated: | Mar 15, 2012 |
47746 - NRC Website
| |