| event date = 03/28/2012 15:03 EDT
| event date = 03/28/2012 15:03 EDT
| last update date = 03/28/2012
| last update date = 03/28/2012
| title = Automatic Reactor Trip Due To Steam Generator High Water Level Condition
| title = Automatic Reactor Trip Due to Steam Generator High Water Level Condition
| event text = At 1503 hours EDT on March 28, 2012, with the unit in Mode 1 at 55% power, an automatic reactor trip occurred.  The reactor trip was the result of a turbine trip from a 'B' Steam Generator Hi Level.  All Reactor Coolant Pumps (RCP) remained running.
| event text = At 1503 hours EDT on March 28, 2012, with the unit in Mode 1 at 55% power, an automatic reactor trip occurred.  The reactor trip was the result of a turbine trip from a 'B' Steam Generator Hi Level.  All Reactor Coolant Pumps (RCP) remained running.
The Auxiliary Feeedwater (AFW) System automatically actuated due to both main feedwater pump breakers opening from a valid feedwater isolation signal.  Steam Generator Levels were then controlled by Auxiliary Feedwater pumps.  Steam Generator Blowdown was automatically isolated with the AFW actuation.  The RCS Code Safety valves, Pressurizer Power Operated Relief Valves (PORVs), Steam Generator PORVs or the Main Steam Safety valves (MSSVs) did not open during the event.  All control rods fully inserted following the reactor trip.
The Auxiliary Feeedwater (AFW) System automatically actuated due to both main feedwater pump breakers opening from a valid feedwater isolation signal.  Steam Generator Levels were then controlled by Auxiliary Feedwater pumps.  Steam Generator Blowdown was automatically isolated with the AFW actuation.  The RCS Code Safety valves, Pressurizer Power Operated Relief Valves (PORVs), Steam Generator PORVs or the Main Steam Safety valves (MSSVs) did not open during the event.  All control rods fully inserted following the reactor trip.

Latest revision as of 22:04, 1 March 2018

ENS 47781 +/-
Where
Robinson Duke Energy icon.png
South Carolina (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-1.82 h-0.0758 days <br />-0.0108 weeks <br />-0.00249 months <br />)
Opened: Martin Arnold
17:14 Mar 28, 2012
NRC Officer: Bill Huffman
Last Updated: Mar 28, 2012
47781 - NRC Website