ENS 47865: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 04/25/2012 22:27 PDT | | event date = 04/25/2012 22:27 PDT | ||
| last update date = 04/26/2012 | | last update date = 04/26/2012 | ||
| title = Press Release Issued | | title = Press Release Issued for Shutdown of Unit 2 Due to Salp Influx | ||
| event text = On April 25, 2012, at 2227 PDT, Diablo Canyon Power Plant (DCPP) U2 was manually taken offline and the reactor shut down due to an influx of sea salp - a small, jellyfish-like organism - in the intake structure. Operators manually started the auxiliary feedwater pumps in accordance with the plant operating procedures. | | event text = On April 25, 2012, at 2227 PDT, Diablo Canyon Power Plant (DCPP) U2 was manually taken offline and the reactor shut down due to an influx of sea salp - a small, jellyfish-like organism - in the intake structure. Operators manually started the auxiliary feedwater pumps in accordance with the plant operating procedures. | ||
PG&E will not restart Unit 2 until conditions improve at the intake structure. As previously announced, Unit 1 was safely shut down for a planned refueling and maintenance outage. | PG&E will not restart Unit 2 until conditions improve at the intake structure. As previously announced, Unit 1 was safely shut down for a planned refueling and maintenance outage. |
Latest revision as of 21:04, 1 March 2018
Where | |
---|---|
Diablo Canyon California (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release | |
Time - Person (Reporting Time:+-1.12 h-0.0467 days <br />-0.00667 weeks <br />-0.00153 months <br />) | |
Opened: | Dave Gouveia 04:20 Apr 26, 2012 |
NRC Officer: | Charles Teal |
Last Updated: | Apr 26, 2012 |
47865 - NRC Website
| |