ML20134B048: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:F
{{#Wiki_filter:A F
    ~
p
pA NOV     4 1985 Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN: , Mr. Murray R. Edelman Vice President Nuclear Group Post Office Box 5000 Cleveland, OH 44101 Gentlemen:
~
NOV 4 1985 Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN:, Mr. Murray R. Edelman Vice President Nuclear Group Post Office Box 5000 Cleveland, OH 44101 Gentlemen:
~
~
Region III has recently received anonymous allegations concerning activities associated with Metalweld Inc., a safety related coating contractor at the Perry Nuclear Power plant. These allegations were previously discussed with you during an October 25, 1985, telephone call between you and Messrs.
Region III has recently received anonymous allegations concerning activities associated with Metalweld Inc., a safety related coating contractor at the Perry Nuclear Power plant. These allegations were previously discussed with you during an October 25, 1985, telephone call between you and Messrs.
R. C. Knop and C. H. Weil of our staff. Enclosure 1 is a description of the allegations received.
R. C. Knop and C. H. Weil of our staff. is a description of the allegations received.
Due to the question.of coating adequacy raised by the allegations provided in enclosure 1, Region III expects that Cleveland Electric Illuminating Company (CEI) will analyze the concerns; perform necessary audits, surveillances, or appropriate. investigations in order to determine the validity and significance of the alleged conditions; and take appropriate actions as necessary in order to address both the specific concerns and root causes, if applicable.
Due to the question.of coating adequacy raised by the allegations provided in enclosure 1, Region III expects that Cleveland Electric Illuminating Company (CEI) will analyze the concerns; perform necessary audits, surveillances, or appropriate. investigations in order to determine the validity and significance of the alleged conditions; and take appropriate actions as necessary in order to address both the specific concerns and root causes, if applicable.
We further request that the results of your review and disposition of these matters be submitted to Region III after completion. Documentation supporting your results should be maintained onsite for any further inspections by Region III. You should also be aware that the technical aspects of these allegations must be adequately resolved prior to fuel load.
We further request that the results of your review and disposition of these matters be submitted to Region III after completion. Documentation supporting your results should be maintained onsite for any further inspections by Region III. You should also be aware that the technical aspects of these allegations must be adequately resolved prior to fuel load.
The enclosures to this letter are being withheld from public disclosure in accordance with Title 10, Code of Federal Regulations, Part 2.790(a)(b) and(7).
The enclosures to this letter are being withheld from public disclosure in accordance with Title 10, Code of Federal Regulations, Part 2.790(a)(b) and(7).
f 8511110198 851104 PDR a
f 8511110198 851104 40}
ADOCK 05000440
PDR ADOCK 05000440 a
                                ,eDn 40}
,eDn 7v 71 p
7v 71   p 1
1


        .e Th     veland Electric Illuminating                                                                                       NOV   4 1985 i
.e Th veland Electric Illuminating NOV 4 1985 i
Your cooperation with us is appreciated. Should you have any questions with regard to this matter, please do not hesitate to call me or Mr. R. C. Knop (312-790-5547).
Your cooperation with us is appreciated. Should you have any questions with regard to this matter, please do not hesitate to call me or Mr. R. C. Knop (312-790-5547).
Sincerely, JOrfginni Siuned by C.E. Marclius" Charles E. Norelius, Director Division of Reactor Projects
Sincerely, JOrfginni Siuned by C.E. Marclius" Charles E. Norelius, Director Division of Reactor Projects


==Enclosures:==
==Enclosures:==
: 1. Description of Allegations
1.
: 2. List of Individuals cc w/o  
Description of Allegations 2.
List of Individuals cc w/o  


==Enclosures:==
==Enclosures:==
 
J. J. Waldron, Manager, Perry 1
1 J. J. Waldron, Manager, Perry Plant Technical Department M. D. Lyster, Manager, Perry Plant Operations Department L. O. Beck, General Supervising Engineer, Nuclear Licensing and Fuel Management Section DCS/RSB(RIDS)
Plant Technical Department M. D. Lyster, Manager, Perry Plant Operations Department L. O. Beck, General Supervising Engineer, Nuclear Licensing and Fuel Management Section DCS/RSB(RIDS)
Licensing-Fee Management Branch Resident Inspector, RIII
Licensing-Fee Management Branch Resident Inspector, RIII Harold W. Kohn, Ohio EPA Terry J. Lodge, Esq.
;          Harold W. Kohn, Ohio EPA Terry J. Lodge, Esq.
James W. Harris, State of Ohio Robert H. Quillin, Ohio Department of Health h (b RIII p>
James W. Harris, State of Ohio Robert H. Quillin, Ohio Department of Health RII                  RIII p>     RIII                                             RIII h (b
RIII R
(/ McCormick-Barger/rl Knop pt.      Md Wdrnick R
RI Q RIII RII pt.
ga/)
Md ga/)
Weil         P 1k RI Q
%o
                                                                                    %o Greelman No elius 11/ l /85_           11/,/85 11/ / /85 11/p' /85 11/y /85 11/ 9           /85 11/4/85
(/ McCormick-Barger/rl Knop Wdrnick Weil P 1k Greelman No elius 11/ l /85_
                                                                                                    . . _ . . _ . .}}
11/,/85 11/ / /85 11/p' /85 11/y /85 11/ 9 /85 11/4/85
..}}

Latest revision as of 05:54, 12 December 2024

Forwards Description of Anonymous Allegations Received Re Activities Associated w/Metalweld,Inc,safety-related Coating Contractor.Allegations Must Be Adequately Resolved Prior to Fuel Load.Description Withheld (Ref 10CFR2.790)
ML20134B048
Person / Time
Site: Perry  
Issue date: 11/04/1985
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edleman M
CLEVELAND ELECTRIC ILLUMINATING CO.
References
NUDOCS 8511110198
Download: ML20134B048 (2)


Text

A F

p

~

NOV 4 1985 Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN:, Mr. Murray R. Edelman Vice President Nuclear Group Post Office Box 5000 Cleveland, OH 44101 Gentlemen:

~

Region III has recently received anonymous allegations concerning activities associated with Metalweld Inc., a safety related coating contractor at the Perry Nuclear Power plant. These allegations were previously discussed with you during an October 25, 1985, telephone call between you and Messrs.

R. C. Knop and C. H. Weil of our staff. is a description of the allegations received.

Due to the question.of coating adequacy raised by the allegations provided in enclosure 1, Region III expects that Cleveland Electric Illuminating Company (CEI) will analyze the concerns; perform necessary audits, surveillances, or appropriate. investigations in order to determine the validity and significance of the alleged conditions; and take appropriate actions as necessary in order to address both the specific concerns and root causes, if applicable.

We further request that the results of your review and disposition of these matters be submitted to Region III after completion. Documentation supporting your results should be maintained onsite for any further inspections by Region III. You should also be aware that the technical aspects of these allegations must be adequately resolved prior to fuel load.

The enclosures to this letter are being withheld from public disclosure in accordance with Title 10, Code of Federal Regulations, Part 2.790(a)(b) and(7).

f 8511110198 851104 40}

PDR ADOCK 05000440 a

,eDn 7v 71 p

1

.e Th veland Electric Illuminating NOV 4 1985 i

Your cooperation with us is appreciated. Should you have any questions with regard to this matter, please do not hesitate to call me or Mr. R. C. Knop (312-790-5547).

Sincerely, JOrfginni Siuned by C.E. Marclius" Charles E. Norelius, Director Division of Reactor Projects

Enclosures:

1.

Description of Allegations 2.

List of Individuals cc w/o

Enclosures:

J. J. Waldron, Manager, Perry 1

Plant Technical Department M. D. Lyster, Manager, Perry Plant Operations Department L. O. Beck, General Supervising Engineer, Nuclear Licensing and Fuel Management Section DCS/RSB(RIDS)

Licensing-Fee Management Branch Resident Inspector, RIII Harold W. Kohn, Ohio EPA Terry J. Lodge, Esq.

James W. Harris, State of Ohio Robert H. Quillin, Ohio Department of Health h (b RIII p>

RIII R

RI Q RIII RII pt.

Md ga/)

%o

(/ McCormick-Barger/rl Knop Wdrnick Weil P 1k Greelman No elius 11/ l /85_

11/,/85 11/ / /85 11/p' /85 11/y /85 11/ 9 /85 11/4/85

..