ENS 48622: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 12/20/2012 CST
| event date = 12/20/2012 CST
| last update date = 12/21/2012
| last update date = 12/21/2012
| title = Part 21 Report - Belden Wire Used On Environmentally Qualified Form-Wound Motors Not Fully Qualified
| title = Part 21 Report - Belden Wire Used on Environmentally Qualified Form-Wound Motors Not Fully Qualified
| event text = Potential Condition: Tennessee Valley Authority (TVA) Power Service Shops (PSS) installed Belden EPDM lead wire in the rewind of Environmentally Qualified (EQ) safety-related motors utilizing EPRI Technical Report (TR) 1003481 and TR 1001036. EPRI informed PSS that the Belden EPDM lead wire had not been fully qualified in accordance with EPRI TR 1001036.
| event text = Potential Condition: Tennessee Valley Authority (TVA) Power Service Shops (PSS) installed Belden EPDM lead wire in the rewind of Environmentally Qualified (EQ) safety-related motors utilizing EPRI Technical Report (TR) 1003481 and TR 1001036. EPRI informed PSS that the Belden EPDM lead wire had not been fully qualified in accordance with EPRI TR 1001036.
Thirteen (13) motors are affected. Ten (10) Browns Ferry motors, one (1) Watts Bar Unit 2 motor, one (1) Progress Energy [Crystal River] and one (1) Florida Power & Light (FPL) [St. Lucie Plant] . All the customers have been notified of a potential Part 21 condition.
Thirteen (13) motors are affected. Ten (10) Browns Ferry motors, one (1) Watts Bar Unit 2 motor, one (1) Progress Energy [Crystal River] and one (1) Florida Power & Light (FPL) [St. Lucie Plant] . All the customers have been notified of a potential Part 21 condition.

Latest revision as of 21:02, 1 March 2018

ENS 48622 +/-
Where
Power Service Shops
Muscle Shoals, Alabama (NRC Region 1)
Organization: Tennessee Valley Authority
Reporting
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect
Time - Person (Reporting Time:+34.72 h1.447 days <br />0.207 weeks <br />0.0476 months <br />)
Opened: Mark Cook
16:43 Dec 21, 2012
NRC Officer: Howie Crouch
Last Updated: Dec 21, 2012
48622 - NRC Website